IDEAS home Printed from https://ideas.repec.org/e/pel86.html
   My authors  Follow this author

Mohsen Elhafsi

Personal Details

First Name:Mohsen
Middle Name:
Last Name:Elhafsi
Suffix:
RePEc Short-ID:pel86
http://www.agsm.ucr.edu/index2.php?content=contacts/index.html

Affiliation

A. Gary Anderson Graduate School of Management
University of California-Riverside

Riverside, California (United States)
https://ssgs.ucla.edu/centers/north-american-integration-and-development-center/
RePEc:edi:smucrus (more details at EDIRC)

Research output

as
Jump to: Articles

Articles

  1. Elhafsi, Mohsen & Hamouda, Essia, 2015. "Managing an assemble-to-order system with after sales market for components," European Journal of Operational Research, Elsevier, vol. 242(3), pages 828-841.
  2. ElHafsi, Mohsen & Camus, Herve & Craye, Etienne, 2010. "Managing an integrated production inventory system with information on the production and demand status and multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 207(2), pages 986-1001, December.
  3. ElHafsi, Mohsen, 2009. "Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 194(1), pages 127-142, April.
  4. Saif Benjaafar & Mohsen ElHafsi, 2006. "Production and Inventory Control of a Single Product Assemble-to-Order System with Multiple Customer Classes," Management Science, INFORMS, vol. 52(12), pages 1896-1912, December.
  5. Saif Benjaafar & Mohsen ElHafsi & Francis de Véricourt, 2004. "Demand Allocation in Multiple-Product, Multiple-Facility, Make-to-Stock Systems," Management Science, INFORMS, vol. 50(10), pages 1431-1448, October.
  6. Elhafsi, Mohsen, 2002. "A production planning model for an unreliable production facility: Case of finite horizon and single demand," European Journal of Operational Research, Elsevier, vol. 143(1), pages 94-114, November.
  7. ElHafsi, Mohsen, 2000. "An operational decision model for lead-time and price quotation in congested manufacturing systems," European Journal of Operational Research, Elsevier, vol. 126(2), pages 355-370, October.

Citations

Many of the citations below have been collected in an experimental project, CitEc, where a more detailed citation analysis can be found. These are citations from works listed in RePEc that could be analyzed mechanically. So far, only a minority of all works could be analyzed. See under "Corrections" how you can help improve the citation analysis.

Articles

  1. Elhafsi, Mohsen & Hamouda, Essia, 2015. "Managing an assemble-to-order system with after sales market for components," European Journal of Operational Research, Elsevier, vol. 242(3), pages 828-841.

    Cited by:

    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
    3. Kim, Hyunjung & Kim, Eungab, 2022. "A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1244-1257.
    4. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    5. Elhafsi, Mohsen & Hamouda, Essia, 2018. "Managing an integrated production and inventory system selling to a dual market: Long-term and walk-in," European Journal of Operational Research, Elsevier, vol. 268(1), pages 215-230.
    6. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2021. "Optimal production and inventory control of multi-class mixed backorder and lost sales demand class models," European Journal of Operational Research, Elsevier, vol. 291(1), pages 147-161.
    7. Quan-Lin Li & Yi-Meng Li & Jing-Yu Ma & Heng-Li Liu, 2023. "A complete algebraic solution to the optimal dynamic rationing policy in the stock-rationing queue with two demand classes," Journal of Combinatorial Optimization, Springer, vol. 45(3), pages 1-54, April.
    8. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2020. "A novel decomposition-based method for solving general-product structure assemble-to-order systems," European Journal of Operational Research, Elsevier, vol. 286(1), pages 233-249.
    9. ElHafsi, Mohsen & Fang, Jianxin & Camus, Herve, 2018. "Optimal control of a continuous-time W-configuration assemble-to-order system," European Journal of Operational Research, Elsevier, vol. 267(3), pages 917-932.
    10. Karaarslan, Gönül A. & Atan, Zümbül & de Kok, Ton & Kiesmüller, Gudrun P., 2018. "Optimal and heuristic policies for assemble-to-order systems with different review periods," European Journal of Operational Research, Elsevier, vol. 271(1), pages 80-96.
    11. Albrecht, Martin, 2017. "Optimization of safety stocks in models with an order service level objective or constraint," European Journal of Operational Research, Elsevier, vol. 263(3), pages 900-909.

  2. ElHafsi, Mohsen & Camus, Herve & Craye, Etienne, 2010. "Managing an integrated production inventory system with information on the production and demand status and multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 207(2), pages 986-1001, December.

    Cited by:

    1. Feng, Haofang & Zhang, Sheng Hao & Zhang, Yong, 2023. "Managing production-inventory-maintenance systems with condition monitoring," European Journal of Operational Research, Elsevier, vol. 310(2), pages 698-711.
    2. Wang, Yi & Zhang, Sheng Hao, 2021. "Optimal production and inventory rationing policies with selective-information sharing and two demand classes," European Journal of Operational Research, Elsevier, vol. 288(2), pages 394-407.
    3. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2021. "Optimal production and inventory control of multi-class mixed backorder and lost sales demand class models," European Journal of Operational Research, Elsevier, vol. 291(1), pages 147-161.
    4. Jing Liu & Fuyou Huang & Chao Ma, 2021. "Coordination of VMI supply chain with replenishment tactic under risk aversion and sales effort," 4OR, Springer, vol. 19(3), pages 389-414, September.

  3. ElHafsi, Mohsen, 2009. "Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 194(1), pages 127-142, April.

    Cited by:

    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Chen-Ritzo, Ching-Hua & Ervolina, Tom & Harrison, Terry P. & Gupta, Barun, 2011. "Component rationing for available-to-promise scheduling in configure-to-order systems," European Journal of Operational Research, Elsevier, vol. 211(1), pages 57-65, May.
    3. Gao, Chunyan & Shen, Houcai & Cheng, T.C.E., 2010. "Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines," International Journal of Production Economics, Elsevier, vol. 126(2), pages 341-349, August.
    4. Kim, Eungab, 2012. "Centralized admission and production control in a two-stage supply chain with single component and customized products," International Journal of Production Economics, Elsevier, vol. 140(1), pages 530-540.
    5. Kai Huang, 2014. "Benchmarking non-first-come-first-served component allocation in an assemble-to-order system," Annals of Operations Research, Springer, vol. 223(1), pages 217-237, December.
    6. Mohammad Alaghebandha & Vahid Hajipour, 2015. "A soft computing-based approach to optimise queuing-inventory control problem," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(6), pages 1113-1130, April.
    7. Emre Nadar & Mustafa Akan & Alan Scheller-Wolf, 2014. "Technical Note---Optimal Structural Results for Assemble-to-Order Generalized M -Systems," Operations Research, INFORMS, vol. 62(3), pages 571-579, June.
    8. Kim, Hyunjung & Kim, Eungab, 2022. "A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1244-1257.
    9. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    10. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2021. "Optimal production and inventory control of multi-class mixed backorder and lost sales demand class models," European Journal of Operational Research, Elsevier, vol. 291(1), pages 147-161.
    11. Zhao, Yao, 2009. "Analysis and evaluation of an Assemble-to-Order system with batch ordering policy and compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 198(3), pages 800-809, November.
    12. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2020. "A novel decomposition-based method for solving general-product structure assemble-to-order systems," European Journal of Operational Research, Elsevier, vol. 286(1), pages 233-249.
    13. Elhafsi, Mohsen & Hamouda, Essia, 2015. "Managing an assemble-to-order system with after sales market for components," European Journal of Operational Research, Elsevier, vol. 242(3), pages 828-841.
    14. Oh, Yosep & Behdad, Sara, 2017. "Simultaneous reassembly and procurement planning in assemble-to-order remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 184(C), pages 168-178.
    15. ElHafsi, Mohsen & Camus, Herve & Craye, Etienne, 2010. "Managing an integrated production inventory system with information on the production and demand status and multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 207(2), pages 986-1001, December.
    16. ElHafsi, Mohsen & Fang, Jianxin & Camus, Herve, 2018. "Optimal control of a continuous-time W-configuration assemble-to-order system," European Journal of Operational Research, Elsevier, vol. 267(3), pages 917-932.
    17. Kim, Eungab & Park, Taeho, 2016. "Admission and inventory control of a single-component make-to-order production system with replenishment setup cost and lead time," European Journal of Operational Research, Elsevier, vol. 255(1), pages 91-102.

  4. Saif Benjaafar & Mohsen ElHafsi, 2006. "Production and Inventory Control of a Single Product Assemble-to-Order System with Multiple Customer Classes," Management Science, INFORMS, vol. 52(12), pages 1896-1912, December.

    Cited by:

    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Chen-Ritzo, Ching-Hua & Ervolina, Tom & Harrison, Terry P. & Gupta, Barun, 2011. "Component rationing for available-to-promise scheduling in configure-to-order systems," European Journal of Operational Research, Elsevier, vol. 211(1), pages 57-65, May.
    3. Gao, Chunyan & Shen, Houcai & Cheng, T.C.E., 2010. "Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines," International Journal of Production Economics, Elsevier, vol. 126(2), pages 341-349, August.
    4. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    5. Kim, Eungab, 2012. "Centralized admission and production control in a two-stage supply chain with single component and customized products," International Journal of Production Economics, Elsevier, vol. 140(1), pages 530-540.
    6. Kai Huang, 2014. "Benchmarking non-first-come-first-served component allocation in an assemble-to-order system," Annals of Operations Research, Springer, vol. 223(1), pages 217-237, December.
    7. Long Gao & Susan H. Xu & Michael O. Ball, 2012. "Managing an Available-to-Promise Assembly System with Dynamic Short-Term Pseudo-Order Forecast," Management Science, INFORMS, vol. 58(4), pages 770-790, April.
    8. Saif Benjaafar & Mohsen ElHafsi & Tingliang Huang, 2010. "Optimal control of a production‐inventory system with both backorders and lost sales," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(3), pages 252-265, April.
    9. Albrecht, Martin, 2014. "Determining near optimal base-stock levels in two-stage general inventory systems," European Journal of Operational Research, Elsevier, vol. 232(2), pages 342-349.
    10. Emre Nadar & Mustafa Akan & Alan Scheller-Wolf, 2014. "Technical Note---Optimal Structural Results for Assemble-to-Order Generalized M -Systems," Operations Research, INFORMS, vol. 62(3), pages 571-579, June.
    11. Long Gao & Jim (Junmin) Shi & Michael F. Gorman & Ting Luo, 2020. "Business Analytics for Intermodal Capacity Management," Manufacturing & Service Operations Management, INFORMS, vol. 22(2), pages 310-329, March.
    12. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    13. Bao, Lina & Liu, Zhiying & Yu, Yimin & Zhang, Wei, 2018. "On the decomposition property for a dynamic inventory rationing problem with multiple demand classes and backorder," European Journal of Operational Research, Elsevier, vol. 265(1), pages 99-106.
    14. van Jaarsveld, W.L. & Dollevoet, T.A.B., 2011. "Spare parts inventory control for an aircraft component repair shop," Econometric Institute Research Papers EI2011-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    15. Secil Savasaneril & Ece Sayin, 2017. "Dynamic lead time quotation under responsive inventory and multiple customer classes," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 95-135, January.
    16. Lijian Lu & Jing‐Sheng Song & Hanqin Zhang, 2015. "Optimal and asymptotically optimal policies for assemble‐to‐order n‐ and W‐systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(8), pages 617-645, December.
    17. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    18. Cheng, T.C.E. & Gao, Chunyan & Shen, Houcai, 2011. "Production planning and inventory allocation of a single-product assemble-to-order system with failure-prone machines," International Journal of Production Economics, Elsevier, vol. 131(2), pages 604-617, June.
    19. Bing Lin & Shaoxiang Chen & Yi Feng & Jianjun Xu, 2018. "The Joint Stock and Capacity Rationings of a Make-To-Stock System with Flexible Demand," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 35(01), pages 1-27, February.
    20. ElHafsi, Mohsen, 2009. "Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 194(1), pages 127-142, April.
    21. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2021. "Optimal production and inventory control of multi-class mixed backorder and lost sales demand class models," European Journal of Operational Research, Elsevier, vol. 291(1), pages 147-161.
    22. Samii, Amir-Behzad & Pibernik, Richard & Yadav, Prashant & Vereecke, Ann, 2012. "Reservation and allocation policies for influenza vaccines," European Journal of Operational Research, Elsevier, vol. 222(3), pages 495-507.
    23. Zhao, Yao, 2009. "Analysis and evaluation of an Assemble-to-Order system with batch ordering policy and compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 198(3), pages 800-809, November.
    24. Quan-Lin Li & Yi-Meng Li & Jing-Yu Ma & Heng-Li Liu, 2023. "A complete algebraic solution to the optimal dynamic rationing policy in the stock-rationing queue with two demand classes," Journal of Combinatorial Optimization, Springer, vol. 45(3), pages 1-54, April.
    25. Wenhui Zhou & Xiuli Chao, 2012. "Stein–Chen approximation and error bounds for order fill rates in assemble‐to‐order systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(8), pages 643-655, December.
    26. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2020. "A novel decomposition-based method for solving general-product structure assemble-to-order systems," European Journal of Operational Research, Elsevier, vol. 286(1), pages 233-249.
    27. Elhafsi, Mohsen & Hamouda, Essia, 2015. "Managing an assemble-to-order system with after sales market for components," European Journal of Operational Research, Elsevier, vol. 242(3), pages 828-841.
    28. Mohammed Hichame Benbitour & Evren Sahin & Yves Dallery, 2019. "The use of rush deliveries in periodic review assemble-to-order systems," Post-Print hal-01997380, HAL.
    29. Shaoxiang Chen & Jianjun Xu & Youyi Feng, 2010. "A partial characterization of the optimal ordering/rationing policy for a periodic review system with two demand classes and backordering," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(4), pages 330-341, June.
    30. Yingdong Lu & Jing-Sheng Song & Yao Zhao, 2010. "No-Holdback Allocation Rules for Continuous-Time Assemble-to-Order Systems," Operations Research, INFORMS, vol. 58(3), pages 691-705, June.
    31. Oh, Yosep & Behdad, Sara, 2017. "Simultaneous reassembly and procurement planning in assemble-to-order remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 184(C), pages 168-178.
    32. ElHafsi, Mohsen & Camus, Herve & Craye, Etienne, 2010. "Managing an integrated production inventory system with information on the production and demand status and multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 207(2), pages 986-1001, December.
    33. Erica L. Plambeck & Amy R. Ward, 2007. "Note: A Separation Principle for a Class of Assemble-to-Order Systems with Expediting," Operations Research, INFORMS, vol. 55(3), pages 603-609, June.
    34. ElHafsi, Mohsen & Fang, Jianxin & Camus, Herve, 2018. "Optimal control of a continuous-time W-configuration assemble-to-order system," European Journal of Operational Research, Elsevier, vol. 267(3), pages 917-932.
    35. Karaarslan, Gönül A. & Atan, Zümbül & de Kok, Ton & Kiesmüller, Gudrun P., 2018. "Optimal and heuristic policies for assemble-to-order systems with different review periods," European Journal of Operational Research, Elsevier, vol. 271(1), pages 80-96.
    36. Gregory A. DeCroix, 2013. "Inventory Management for an Assembly System Subject to Supply Disruptions," Management Science, INFORMS, vol. 59(9), pages 2079-2092, September.
    37. Martin I. Reiman & Qiong Wang, 2015. "Asymptotically Optimal Inventory Control for Assemble-to-Order Systems with Identical Lead Times," Operations Research, INFORMS, vol. 63(3), pages 716-732, June.
    38. Liu, Baolong & Papier, Felix, 2022. "Remanufacturing of multi-component systems with product substitution," European Journal of Operational Research, Elsevier, vol. 301(3), pages 896-911.
    39. Erica L. Plambeck, 2008. "Asymptotically Optimal Control for an Assemble-to-Order System with Capacitated Component Production and Fixed Transport Costs," Operations Research, INFORMS, vol. 56(5), pages 1158-1171, October.
    40. Saif Benjaafar & Mohsen ElHafsi & Chung-Yee Lee & Weihua Zhou, 2011. "TECHNICAL NOTE---Optimal Control of an Assembly System with Multiple Stages and Multiple Demand Classes," Operations Research, INFORMS, vol. 59(2), pages 522-529, April.
    41. Yi Yang & Jianan Wang & Youhua Chen & Zhiyuan Chen & Yanchu Liu, 2020. "Optimal procurement strategies for contractual assembly systems with fluctuating procurement price," Annals of Operations Research, Springer, vol. 291(1), pages 1027-1059, August.
    42. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
    43. Kim, Eungab & Park, Taeho, 2016. "Admission and inventory control of a single-component make-to-order production system with replenishment setup cost and lead time," European Journal of Operational Research, Elsevier, vol. 255(1), pages 91-102.

  5. Saif Benjaafar & Mohsen ElHafsi & Francis de Véricourt, 2004. "Demand Allocation in Multiple-Product, Multiple-Facility, Make-to-Stock Systems," Management Science, INFORMS, vol. 50(10), pages 1431-1448, October.

    Cited by:

    1. Ibtissem Ernez-Gahbiche & Khaled Hadjyoussef & Abdelwaheb Dogui & Zied Jemai, 2019. "Decentralized versus cooperative performances in a Nash game between a customer and two suppliers," Flexible Services and Manufacturing Journal, Springer, vol. 31(2), pages 279-307, June.
    2. Abhilasha Prakash Katariya & Sıla Çetinkaya & Eylem Tekin, 2014. "Cyclic Consumption and Replenishment Decisions for Vendor-Managed Inventory of Multisourced Parts in Dell’s Supply Chain," Interfaces, INFORMS, vol. 44(3), pages 300-316, June.
    3. Van Nieuwenhuyse, Inneke & Vandaele, Nico & Rajaram, Kumar & Karmarkar, Uday S., 2007. "Buffer sizing in multi-product multi-reactor batch processes: Impact of allocation and campaign sizing policies," European Journal of Operational Research, Elsevier, vol. 179(2), pages 424-443, June.
    4. Feng, Jiejian & Zhang, Michael, 2017. "Dynamic quotation of leadtime and price for a Make-To-Order system with multiple customer classes and perfect information on customer preferences," European Journal of Operational Research, Elsevier, vol. 258(1), pages 334-342.
    5. Saif Benjaafar & William L. Cooper & Joon-Seok Kim, 2005. "On the Benefits of Pooling in Production-Inventory Systems," Management Science, INFORMS, vol. 51(4), pages 548-565, April.
    6. Sanajian, Nima & BalcIog[small tilde]lu, BarIs, 2009. "The impact of production time variability on make-to-stock queue performance," European Journal of Operational Research, Elsevier, vol. 194(3), pages 847-855, May.
    7. Saif Benjaafar & Mohsen ElHafsi, 2006. "Production and Inventory Control of a Single Product Assemble-to-Order System with Multiple Customer Classes," Management Science, INFORMS, vol. 52(12), pages 1896-1912, December.
    8. ElHafsi, Mohsen, 2009. "Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 194(1), pages 127-142, April.
    9. Hui Zhao & Jennifer K. Ryan & Vinayak Deshpande, 2008. "Optimal Dynamic Production and Inventory Transshipment Policies for a Two-Location Make-to-Stock System," Operations Research, INFORMS, vol. 56(2), pages 400-410, April.
    10. Ali, Agha Iqbal & O'Connor, Debra J., 2010. "The impact of distribution system characteristics on computational tractability," European Journal of Operational Research, Elsevier, vol. 200(2), pages 323-333, January.
    11. Ashesh Kumar Sinha & Ananth Krishnamurthy, 2020. "Production and Capacity Utilization Strategies in Supply Chains for Complex Engineered Products," Production and Operations Management, Production and Operations Management Society, vol. 29(2), pages 462-480, February.
    12. Yang Yu & Ray Qing Cao & Dara Schniederjans, 2017. "Cloud computing and its impact on service level: a multi-agent simulation model," International Journal of Production Research, Taylor & Francis Journals, vol. 55(15), pages 4341-4353, August.
    13. Shuang Chen & Joseph Geunes, 2013. "Optimal allocation of stock levels and stochastic customer demands to a capacitated resource," Annals of Operations Research, Springer, vol. 203(1), pages 33-54, March.
    14. Josh Reed & Bo Zhang, 2017. "Managing capacity and inventory jointly for multi-server make-to-stock queues," Queueing Systems: Theory and Applications, Springer, vol. 86(1), pages 61-94, June.
    15. Saif Benjaafar & Ehsan Elahi & Karen L. Donohue, 2007. "Outsourcing via Service Competition," Management Science, INFORMS, vol. 53(2), pages 241-259, February.
    16. Richard Pibernik & Prashant Yadav, 2008. "Dynamic capacity reservation and due date quoting in a make‐to‐order system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(7), pages 593-611, October.
    17. Hossein Abouee‐Mehrizi & Oded Berman & Hassan Shavandi & Ata G. Zare, 2011. "An exact analysis of a joint production‐inventory problem in two‐echelon inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(8), pages 713-730, December.
    18. Jing-Sheng Song & Yue Zhang, 2020. "Stock or Print? Impact of 3-D Printing on Spare Parts Logistics," Management Science, INFORMS, vol. 66(9), pages 3860-3878, September.
    19. Vladimir Kovtun & Avi Giloni & Clifford Hurvich & Sridhar Seshadri, 2023. "Pivot Clustering to Minimize Error in Forecasting Aggregated Demand Streams Each Following an Autoregressive Moving Average Model," Stats, MDPI, vol. 6(4), pages 1-28, November.

  6. Elhafsi, Mohsen, 2002. "A production planning model for an unreliable production facility: Case of finite horizon and single demand," European Journal of Operational Research, Elsevier, vol. 143(1), pages 94-114, November.

    Cited by:

    1. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.

  7. ElHafsi, Mohsen, 2000. "An operational decision model for lead-time and price quotation in congested manufacturing systems," European Journal of Operational Research, Elsevier, vol. 126(2), pages 355-370, October.

    Cited by:

    1. Chandra, Charu & Grabis, Janis, 2008. "Inventory management with variable lead-time dependent procurement cost," Omega, Elsevier, vol. 36(5), pages 877-887, October.
    2. Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
    3. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    4. A. Baykal Hafızoğlu & Esma S. Gel & Pınar Keskinocak, 2016. "Price and Lead Time Quotation for Contract and Spot Customers," Operations Research, INFORMS, vol. 64(2), pages 406-415, April.
    5. Seçil Savaşaneril & Paul M. Griffin & Pınar Keskinocak, 2010. "Dynamic Lead-Time Quotation for an M/M/1 Base-Stock Inventory Queue," Operations Research, INFORMS, vol. 58(2), pages 383-395, April.
    6. Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
    7. Abhijit Upasani & Reha Uzsoy, 2008. "Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions," Annals of Operations Research, Springer, vol. 161(1), pages 171-188, July.

More information

Research fields, statistics, top rankings, if available.

Statistics

Access and download statistics for all items

Corrections

All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. For general information on how to correct material on RePEc, see these instructions.

To update listings or check citations waiting for approval, Mohsen Elhafsi should log into the RePEc Author Service.

To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.

To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.

Please note that most corrections can take a couple of weeks to filter through the various RePEc services.

IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.