Cost‐based due‐date assignment with the use of classical and neural‐network approaches

Author

Listed:
  • Patrick R. Philipoom
  • Lars Wiegmann
  • Loren Paul Rees

Abstract

Traditional methods of due‐date assignment presented in the literature and used in practice generally assume cost‐of‐earliness and cost‐of‐tardiness functions that may bear little resemblance to true costs. For example, practitioners using ordinary least‐squares (OLS) regression implicitly minimize a quadratic cost function symmetric about the due date, thereby assigning equal second‐order costs to early completion and tardy behavior. In this article the consequences of such assumptions are pointed out, and a cost‐based assignment scheme is suggested whereby the cost of early completion may differ in form and/or degree from the cost of tardiness. Two classical approaches (OLS regression and mathematical programming) as well as a neural‐network methodology for solving this problem are developed and compared on three hypothetical shops using simulation techniques. It is found for the cases considered that: (a) implicitly ignoring cost‐based assignments can be very costly; (b) simpler regression‐based rules cited in the literature are very poor cost performers; (c) if the earliness and tardiness cost functions are both linear, linear programming and neural networks are the methodologies of choice; and (d) if the form of the earliness cost function differs from that of the tardiness cost function, neural networks are statistically superior performers. Finally, it is noted that neural networks can be used for a wide range of cost functions, whereas the other methodologies are significantly more restricted. © 1997 John Wiley & Sons, Inc.

Suggested Citation

  • Patrick R. Philipoom & Lars Wiegmann & Loren Paul Rees, 1997. "Cost‐based due‐date assignment with the use of classical and neural‐network approaches," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(1), pages 21-46, February.
  • Handle: RePEc:wly:navres:v:44:y:1997:i:1:p:21-46
    DOI: 10.1002/(SICI)1520-6750(199702)44:13.0.CO;2-O
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/(SICI)1520-6750(199702)44:13.0.CO;2-O
    Download Restriction: no

    File URL: https://libkey.io/10.1002/(SICI)1520-6750(199702)44:13.0.CO;2-O?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. James K. Weeks & John S. Fryer, 1976. "A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop," Management Science, INFORMS, vol. 22(12), pages 1362-1371, August.
    2. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Soroush, H. M., 1999. "Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs," European Journal of Operational Research, Elsevier, vol. 113(2), pages 450-468, March.
    2. Zhenying Zhao & Michael Ball & Masahiro Kotake, 2005. "Optimization-Based Available-To-Promise with Multi-Stage Resource Availability," Annals of Operations Research, Springer, vol. 135(1), pages 65-85, March.
    3. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    4. Prabuddha De & Jay B. Ghosh & Charles E. Wells, 1994. "Due‐date assignment and early/tardy scheduling on identical parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 17-32, February.
    5. X. Cai & F. S. Tu, 1996. "Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early‐tardy penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1127-1146, December.
    6. Sarper, H. & Henry, M. C., 1996. "Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop," Omega, Elsevier, vol. 24(1), pages 73-81, February.
    7. Nekoiemehr, Nooshin & Zhang, Guoqing & Selvarajah, Esaignani, 2019. "Due date quotation in a dual-channel supply chain," International Journal of Production Economics, Elsevier, vol. 215(C), pages 102-111.
    8. Raaymakers, W. H. M. & Weijters, A. J. M. M., 2003. "Makespan estimation in batch process industries: A comparison between regression analysis and neural networks," European Journal of Operational Research, Elsevier, vol. 145(1), pages 14-30, February.
    9. Philip Kaminsky & Onur Kaya, 2008. "Scheduling and due‐date quotation in a make‐to‐order supply chain," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 444-458, August.
    10. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    11. Vineet Jain & Tilak Raj, 2018. "An adaptive neuro-fuzzy inference system for makespan estimation of flexible manufacturing system assembly shop: a case study," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1302-1314, December.
    12. Kolahan, F. & Liang, M., 1998. "An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups," European Journal of Operational Research, Elsevier, vol. 109(1), pages 142-159, August.
    13. Chevalier, Philippe & Lamas, Alejandro & Lu, Liang & Mlinar, Tanja, 2015. "Revenue management for operations with urgent orders," European Journal of Operational Research, Elsevier, vol. 240(2), pages 476-487.
    14. Cai, X. & Lum, V. Y. S. & Chan, J. M. T., 1997. "Scheduling about a common due date with kob-dependent asymmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 98(1), pages 154-168, April.
    15. Baker, Kenneth R. & Trietsch, Dan, 2009. "Safe scheduling: Setting due dates in single-machine problems," European Journal of Operational Research, Elsevier, vol. 196(1), pages 69-77, July.
    16. Zhi-Long Chen & Nicholas G. Hall, 2010. "The Coordination of Pricing and Scheduling Decisions," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 77-92, April.
    17. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    18. Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Group scheduling and due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 130(2), pages 230-235, April.
    19. Xia, Yu & Chen, Bintong & Yue, Jinfeng, 2008. "Job sequencing and due date assignment in a single machine shop with uncertain processing times," European Journal of Operational Research, Elsevier, vol. 184(1), pages 63-75, January.
    20. Awi Federgruen & Gur Mosheiov, 1993. "Simultaneous optimization of efficiency and performance balance measures in single‐machine scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 951-970, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:44:y:1997:i:1:p:21-46. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.