IDEAS home Printed from https://ideas.repec.org/a/spr/joinma/v34y2023i8d10.1007_s10845-022-01996-z.html
   My bibliography  Save this article

Integrated scheduling of production, inventory and imperfect maintenance based on mutual feedback of supplier and demander in distributed environment

Author

Listed:
  • Zhen Wang

    (Hunan University)

  • Qianwang Deng

    (Hunan University)

  • Like Zhang

    (Hunan University)

  • Xiaoyan Liu

    (Hunan University)

Abstract

The previous research on distributed production scheduling focuses on supply side, ignoring the interconnection of supply side and demand side: the delivery time of spare parts from the supply side will influence the maintenance scheduling of distributed equipment of demand side, while the maintenance scheduling of distributed equipment will affect the scheduling decision of supply of spare parts. In addition, in practice, inventory is an important link between manufacturers and customers. Therefore, we firstly propose an optimal scheduling problem of integrated production, inventory and imperfect maintenance with mutual feedback of supply side and demand side, shortened to PIM-DCSP. In PIM-DCSP, production resources and inventory work together to provide spare parts for demand side, while demand side makes imperfect maintenance scheduling for its distributed equipment to postpone deterioration and finally extend the operating time of equipment. The goal of PIM-DCSP is to make an optimal scheduling that jointly optimizes the scheduling of both sides, that is, reasonably arrange production resources, inventory and workers to realize the minimization of the total cost of supplier and the total cost of demander respectively. A mathematical model is established to describe the presented problem and an improved adaptive cooperative algorithm (IACA) is designed. Effective operators including two heuristic initialization methods, six problem-oriented and two random local search structures are developed to strengthen population diversity and search capability. The comparison experiment of IACA and three other outstanding algorithms is carried out on 96 instances, and the superiority of IACA in solving PIM-DCSP is certificated thoroughly.

Suggested Citation

  • Zhen Wang & Qianwang Deng & Like Zhang & Xiaoyan Liu, 2023. "Integrated scheduling of production, inventory and imperfect maintenance based on mutual feedback of supplier and demander in distributed environment," Journal of Intelligent Manufacturing, Springer, vol. 34(8), pages 3445-3467, December.
  • Handle: RePEc:spr:joinma:v:34:y:2023:i:8:d:10.1007_s10845-022-01996-z
    DOI: 10.1007/s10845-022-01996-z
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10845-022-01996-z
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10845-022-01996-z?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wang, Jun & Zhu, Xiaoyan, 2021. "Joint optimization of condition-based maintenance and inventory control for a k-out-of-n:F system of multi-state degrading components," European Journal of Operational Research, Elsevier, vol. 290(2), pages 514-529.
    2. Shih-Wei Lin & Kuo-Ching Ying & Yen-I Chiang & Wen-Jie Wu, 2016. "Minimising total weighted earliness and tardiness penalties on identical parallel machines using a fast ruin-and-recreate algorithm," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6879-6890, November.
    3. Azoury, Katy S. & Miyaoka, Julia, 2020. "Optimal and simple approximate solutions to a production-inventory system with stochastic and deterministic demand," European Journal of Operational Research, Elsevier, vol. 286(1), pages 178-189.
    4. Tülin İnkaya & Mehmet Akansel, 2017. "Coordinated scheduling of the transfer lots in an assembly-type supply chain: a genetic algorithm approach," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 1005-1015, April.
    5. Lee, W. & Wang, S.-P. & Chen, W.-C., 2017. "Forward and backward stocking policies for a two-level supply chain with consignment stock agreement and stock-dependent demand," European Journal of Operational Research, Elsevier, vol. 256(3), pages 830-840.
    6. Sun Lee, Ik & Yoon, S.H., 2010. "Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs," Omega, Elsevier, vol. 38(6), pages 509-521, December.
    7. Yepes-Borrero, Juan C. & Perea, Federico & Ruiz, Rubén & Villa, Fulgencia, 2021. "Bi-objective parallel machine scheduling with additional resources during setups," European Journal of Operational Research, Elsevier, vol. 292(2), pages 443-455.
    8. Huang, Rong-Hwa, 2010. "Multi-objective job-shop scheduling with lot-splitting production," International Journal of Production Economics, Elsevier, vol. 124(1), pages 206-213, March.
    9. Seyed Mohsen Mousavi & Ardeshir Bahreininejad & S. Nurmaya Musa & Farazila Yusof, 2017. "A modified particle swarm optimization for solving the integrated location and inventory control problems in a two-echelon supply chain network," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 191-206, January.
    10. Guiliang Gong & Raymond Chiong & Qianwang Deng & Qiang Luo, 2020. "A memetic algorithm for multi-objective distributed production scheduling: minimizing the makespan and total energy consumption," Journal of Intelligent Manufacturing, Springer, vol. 31(6), pages 1443-1466, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Anderson Rogério Faia Pinto & Marcelo Seido Nagano, 2020. "Genetic algorithms applied to integration and optimization of billing and picking processes," Journal of Intelligent Manufacturing, Springer, vol. 31(3), pages 641-659, March.
    2. M. Ganesh Kumar & R. Uthayakumar, 2019. "A two-echelon integrated inventory model under generalized lead time distribution with variable backordering rate," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(4), pages 552-562, August.
    3. Zhu, Mixin & Zhou, Xiaojun, 2023. "Hybrid opportunistic maintenance policy for serial-parallel multi-station manufacturing systems with spare part overlap," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
    4. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    5. Niloy J. Mukherjee & Subhash C. Sarin & Daniel A. Neira, 2023. "Lot streaming for a two-stage assembly system in the presence of handling costs," Journal of Scheduling, Springer, vol. 26(4), pages 335-351, August.
    6. Li, Mingjia & Hu, Linmin & Wu, Shaomin & Zhao, Bing & Wang, Yan, 2023. "Reliability assessment for consecutive-k-out-of-n: F retrial systems under Poisson shocks," Applied Mathematics and Computation, Elsevier, vol. 448(C).
    7. Yuran Jin & Cheng Gao, 2023. "Hybrid Optimization of Green Supply Chain Network and Scheduling in Distributed 3D Printing Intelligent Factory," Sustainability, MDPI, vol. 15(7), pages 1-20, March.
    8. Guang Yang & Ying Wang & Mulin Liu, 2023. "Optimal Policy for Probabilistic Selling with Three-Way Revenue Sharing Contract under the Perspective of Sustainable Supply Chain," Sustainability, MDPI, vol. 15(4), pages 1-22, February.
    9. Sasan Harifi & Madjid Khalilian & Javad Mohammadzadeh & Sadoullah Ebrahimnejad, 2021. "Optimization in solving inventory control problem using nature inspired Emperor Penguins Colony algorithm," Journal of Intelligent Manufacturing, Springer, vol. 32(5), pages 1361-1375, June.
    10. Shoujing Zhang & Tiantian Hou & Qing Qu & Adam Glowacz & Samar M. Alqhtani & Muhammad Irfan & Grzegorz Królczyk & Zhixiong Li, 2022. "An Improved Mayfly Method to Solve Distributed Flexible Job Shop Scheduling Problem under Dual Resource Constraints," Sustainability, MDPI, vol. 14(19), pages 1-19, September.
    11. Avelina Alejo-Reyes & Erik Cuevas & Alma Rodríguez & Abraham Mendoza & Elias Olivares-Benitez, 2020. "An Improved Grey Wolf Optimizer for a Supplier Selection and Order Quantity Allocation Problem," Mathematics, MDPI, vol. 8(9), pages 1-24, August.
    12. Sterna, Malgorzata, 2011. "A survey of scheduling problems with late work criteria," Omega, Elsevier, vol. 39(2), pages 120-129, April.
    13. Sema Akin Bas & Beyza Ahlatcioglu Ozkok, 2020. "A fuzzy approach to multi-objective mixed integer linear programming model for multi-echelon closed-loop supply chain with multi-product multi-time-period," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 30(1), pages 25-46.
    14. Zhang, Rui & Song, Shiji & Wu, Cheng, 2013. "A hybrid artificial bee colony algorithm for the job shop scheduling problem," International Journal of Production Economics, Elsevier, vol. 141(1), pages 167-178.
    15. Rohaninejad, Mohammad & Hanzálek, Zdeněk, 2023. "Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches," International Journal of Production Economics, Elsevier, vol. 263(C).
    16. Saberzadeh, Zahra & Razmkhah, Mostafa & Amini, Mohammad, 2023. "Bayesian reliability analysis of complex k-out-of-n: â„“ systems under degradation performance," Reliability Engineering and System Safety, Elsevier, vol. 231(C).
    17. Hesham K. Alfares & Ahmed M. Attia, 2017. "A supply chain model with vendor-managed inventory, consignment, and quality inspection errors," International Journal of Production Research, Taylor & Francis Journals, vol. 55(19), pages 5706-5727, October.
    18. Wang, Liying & Song, Yushuang & Zhang, Wenhua & Ling, Xiaoliang, 2023. "Condition-based inspection, component reallocation and replacement optimization of two-component interchangeable series system," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    19. Zhou, Xiaojun & Ning, Xiaohan, 2021. "Maintenance gravity window based opportunistic maintenance scheduling for multi-unit serial systems with stochastic production waits," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    20. Tao Dai & Xiangqi Fan, 2021. "Multi-Stove Scheduling for Sustainable On-Demand Food Delivery," Sustainability, MDPI, vol. 13(23), pages 1-13, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joinma:v:34:y:2023:i:8:d:10.1007_s10845-022-01996-z. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.