The effect of lifetime buys on warranty repair operations
Author
Abstract
Suggested Citation
DOI: 10.1057/jors.2008.143
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Nicholas C. Petruzzi & Maqbool Dada, 1999. "Pricing and the Newsvendor Problem: A Review with Extensions," Operations Research, INFORMS, vol. 47(2), pages 183-194, April.
- Murthy, D. N. P. & Djamaludin, I., 2002. "New product warranty: A literature review," International Journal of Production Economics, Elsevier, vol. 79(3), pages 231-260, October.
- Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
- Zuo, Ming J. & Liu, Bin & Murthy, D. N. P., 2000. "Replacement-repair policy for multi-state deteriorating products under warranty," European Journal of Operational Research, Elsevier, vol. 123(3), pages 519-530, June.
- Yves Balcer & Izzet Sahin, 1986. "Replacement Costs Under Warranty: Cost Moments and Time Variability," Operations Research, INFORMS, vol. 34(4), pages 554-559, August.
- Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Wagner, Regina & Blecker, Thorsten, 2015. "Material Requirements Planning under Phase-out Conditions," Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL), in: Blecker, Thorsten & Kersten, Wolfgang & Ringle, Christian M. (ed.), Operational Excellence in Logistics and Supply Chains: Optimization Methods, Data-driven Approaches and Security Insights. Proceedings of the Hamburg , volume 22, pages 73-95, Hamburg University of Technology (TUHH), Institute of Business Logistics and General Management.
- van der Heijden, Matthieu & Iskandar, Bermawi P., 2013. "Last time buy decisions for products sold under warranty," European Journal of Operational Research, Elsevier, vol. 224(2), pages 302-312.
- Chen, Jiguang & Hu, Qiying, 2015. "Optimal payment scheme when the supplier’s quality level and cost are unknown," European Journal of Operational Research, Elsevier, vol. 245(3), pages 731-742.
- Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
- Shafiee, Mahmood & Chukova, Stefanka, 2013. "Maintenance models in warranty: A literature review," European Journal of Operational Research, Elsevier, vol. 229(3), pages 561-572.
- Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
- Robotis, Andreas & Boyaci, Tamer & Verter, Vedat, 2012. "Investing in reusability of products of uncertain remanufacturing cost: The role of inspection capabilities," International Journal of Production Economics, Elsevier, vol. 140(1), pages 385-395.
- Jessika Luth Richter & Sahra Svensson‐Hoglund & Carl Dalhammar & Jennifer D. Russell & Åke Thidell, 2023. "Taking stock for repair and refurbishing: A review of harvesting of spare parts from electrical and electronic products," Journal of Industrial Ecology, Yale University, vol. 27(3), pages 868-881, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- van Ooijen, Henny & Bertrand, J. Will M. & Buyukkaramikli, Nasuh C., 2019. "Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital goods," International Journal of Production Economics, Elsevier, vol. 208(C), pages 29-42.
- Ghaddar, Bissan & Sakr, Nizar & Asiedu, Yaw, 2016. "Spare parts stocking analysis using genetic programming," European Journal of Operational Research, Elsevier, vol. 252(1), pages 136-144.
- Liu, Zhi-Jie & Chen, Wei & Huang, Hong-Zhong & Yang, Bo, 2007. "A diagnostics design decision model for products under warranty," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 230-240, September.
- Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
- Lu, Zhen & Shang, Jennifer, 2019. "Warranty mechanism for pre-owned tech products: Collaboration between E-tailers and online warranty provider," International Journal of Production Economics, Elsevier, vol. 211(C), pages 119-131.
- Murthy, D. N. P. & Solem, O. & Roren, T., 2004. "Product warranty logistics: Issues and challenges," European Journal of Operational Research, Elsevier, vol. 156(1), pages 110-126, July.
- repec:grz:wpsses:2013-03 is not listed on IDEAS
- Arts, Joachim, 2017. "A multi-item approach to repairable stocking and expediting in a fluctuating demand environment," European Journal of Operational Research, Elsevier, vol. 256(1), pages 102-115.
- A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
- Toptal, Ayşegül, 2012. "Integration of shipment scheduling decisions for forward and reverse channels in a recoverable item system," International Journal of Production Economics, Elsevier, vol. 140(1), pages 129-137.
- Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
- Wei Xie, 2017. "Optimal pricing and two-dimensional warranty policies for a new product," International Journal of Production Research, Taylor & Francis Journals, vol. 55(22), pages 6857-6870, November.
- Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
- Darghouth, M.N. & Chelbi, Anis & Ait-kadi, Daoud, 2012. "A profit assessment model for equipment inspection and replacement under renewing free replacement warranty policy," International Journal of Production Economics, Elsevier, vol. 135(2), pages 899-906.
- Zhu, Qinghua & Li, Helong & Zhao, Senlin & Lun, Venus, 2016. "Redesign of service modes for remanufactured products and its financial benefits," International Journal of Production Economics, Elsevier, vol. 171(P2), pages 231-240.
- Parlar, Mahmut & Weng, Z. Kevin, 2006. "Coordinating pricing and production decisions in the presence of price competition," European Journal of Operational Research, Elsevier, vol. 170(1), pages 211-227, April.
- Yang, Yang & Liu, Jie & Hu, Taizhong, 2023. "Capital allocation and pricing decisions under trade credit with time-sensitive stochastic demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 173(C).
- Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
- Schulte, Benedikt & Sachs, Anna-Lena, 2020. "The price-setting newsvendor with Poisson demand," European Journal of Operational Research, Elsevier, vol. 283(1), pages 125-137.
- Zhao, Xiujie & He, Shuguang & Xie, Min, 2018. "Utilizing experimental degradation data for warranty cost optimization under imperfect repair," Reliability Engineering and System Safety, Elsevier, vol. 177(C), pages 108-119.
- Hill, R.M. & Seifbarghy, M. & Smith, D.K., 2007. "A two-echelon inventory model with lost sales," European Journal of Operational Research, Elsevier, vol. 181(2), pages 753-766, September.
More about this item
Keywords
logistics; inventory; repair;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:61:y:2010:i:5:d:10.1057_jors.2008.143. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.