IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v12y2020i18p7318-d409894.html
   My bibliography  Save this article

Optimization of Remanufacturing Disassembly Line Balance Considering Multiple Failures and Material Hazards

Author

Listed:
  • Wei Meng

    (College of Mechanical Engineering, Inner Mongolia University of Technology, Hohhot 010051, China)

  • Xiufen Zhang

    (College of Mechanical Engineering, Inner Mongolia University of Technology, Hohhot 010051, China
    College of Mechanical Engineering, Zhejiang University, Hangzhou 310027, China
    The Postdoctoral Scientific Research Station of Canny Elevator Co., Ltd., Suzhou 215213, China)

Abstract

End-of-life (EOL) electromechanical products often have multiple failure characteristics and material hazard attributes. These factors create uncertain disassembly task sequences and affect the remanufacturing cost, environmental sustainability, and disassembly efficiency of the remanufacturing disassembly line system. To address this problem, a novel multi-constraint remanufacturing disassembly line balancing model (MC-RDLBM) is constructed in this article, which accounts for the failure characteristics of the parts and material hazard constraints. To assign the disassembly task reasonably, a disassembly priority decision-making model was presented to describe the relationship between the failure layer, the material hazards layer, and the economic feasibility layer. Furthermore, the multi-objective non-dominated sorting genetic algorithm II (NSGA-II) optimization for the MC-RDLBM is improved. To increase the convergence speed of the algorithm, an initial population construction method is designed, which includes the component failure and material hazards. Moreover, a novel genetic algorithm evolution rule with a Pareto non-dominant relation and crowded distance constraint is established, which expands the search scope of the chromosome’s autonomous evolution and avoids local convergence. Furthermore, a Pareto grade-based evaluation strategy for non-dominant solutions is proposed to eliminate the invalid remanufacturing disassembly task sequences. Finally, a case study verified the effectiveness and feasibility of the proposed method.

Suggested Citation

  • Wei Meng & Xiufen Zhang, 2020. "Optimization of Remanufacturing Disassembly Line Balance Considering Multiple Failures and Material Hazards," Sustainability, MDPI, vol. 12(18), pages 1-16, September.
  • Handle: RePEc:gam:jsusta:v:12:y:2020:i:18:p:7318-:d:409894
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/12/18/7318/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/12/18/7318/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Yicong Gao & Qirui Wang & Yixiong Feng & Hao Zheng & Bing Zheng & Jianrong Tan, 2018. "An Energy-Saving Optimization Method of Dynamic Scheduling for Disassembly Line," Energies, MDPI, vol. 11(5), pages 1-18, May.
    2. McGovern, Seamus M. & Gupta, Surendra M., 2007. "A balancing method and genetic algorithm for disassembly line balancing," European Journal of Operational Research, Elsevier, vol. 179(3), pages 692-708, June.
    3. Yaping Ren & Daoyuan Yu & Chaoyong Zhang & Guangdong Tian & Leilei Meng & Xiaoqiang Zhou, 2017. "An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem," International Journal of Production Research, Taylor & Francis Journals, vol. 55(24), pages 7302-7316, December.
    4. Feifeng Zheng & Junkai He & Feng Chu & Ming Liu, 2018. "A new distribution-free model for disassembly line balancing problem with stochastic task processing times," International Journal of Production Research, Taylor & Francis Journals, vol. 56(24), pages 7341-7353, December.
    5. Minjung Kwak, 2018. "Optimal Line Design of New and Remanufactured Products: A Model for Maximum Profit and Market Share with Environmental Consideration," Sustainability, MDPI, vol. 10(11), pages 1-15, November.
    6. Lixia Zhu & Zeqiang Zhang & Yi Wang, 2018. "A Pareto firefly algorithm for multi-objective disassembly line balancing problems with hazard evaluation," International Journal of Production Research, Taylor & Francis Journals, vol. 56(24), pages 7354-7374, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sheng Xiong & Xiujie Jia & Shuangshuang Wu & Fangyi Li & Mingliang Ma & Xing Wang, 2021. "Parameter Optimization and Effect Analysis of Low-Pressure Abrasive Water Jet (LPAWJ) for Paint Removal of Remanufacturing Cleaning," Sustainability, MDPI, vol. 13(5), pages 1-13, March.
    2. Junyong Liang & Shunsheng Guo & Yunfei Zhang & Wenfang Liu & Shengwen Zhou, 2021. "Energy-Efficient Optimization of Two-Sided Disassembly Line Balance Considering Parallel Operation and Uncertain Using Multiobjective Flatworm Algorithm," Sustainability, MDPI, vol. 13(6), pages 1-23, March.
    3. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fang, Yilin & Liu, Quan & Li, Miqing & Laili, Yuanjun & Pham, Duc Truong, 2019. "Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations," European Journal of Operational Research, Elsevier, vol. 276(1), pages 160-174.
    2. Lixia Zhu & Zeqiang Zhang & Yi Wang & Ning Cai, 2020. "On the end-of-life state oriented multi-objective disassembly line balancing problem," Journal of Intelligent Manufacturing, Springer, vol. 31(6), pages 1403-1428, August.
    3. Xuhui Xia & Wei Liu & Zelin Zhang & Lei Wang & Jianhua Cao & Xiang Liu, 2019. "A Balancing Method of Mixed-model Disassembly Line in Random Working Environment," Sustainability, MDPI, vol. 11(8), pages 1-16, April.
    4. Jianhua Cao & Xuhui Xia & Lei Wang & Zelin Zhang & Xiang Liu, 2019. "A Novel Multi-Efficiency Optimization Method for Disassembly Line Balancing Problem," Sustainability, MDPI, vol. 11(24), pages 1-16, December.
    5. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
    6. Ömer Faruk Yılmaz & Büşra Yazıcı, 2022. "Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches," Annals of Operations Research, Springer, vol. 319(2), pages 1793-1843, December.
    7. Yusha Zhou & Xiuping Guo & Dong Li, 2022. "A dynamic programming approach to a multi-objective disassembly line balancing problem," Annals of Operations Research, Springer, vol. 311(2), pages 921-944, April.
    8. Junkai He & Feng Chu & Feifeng Zheng & Ming Liu, 2021. "A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times," Annals of Operations Research, Springer, vol. 296(1), pages 71-93, January.
    9. Bingtao Hu & Yixiong Feng & Hao Zheng & Jianrong Tan, 2018. "Sequence Planning for Selective Disassembly Aiming at Reducing Energy Consumption Using a Constraints Relation Graph and Improved Ant Colony Optimization Algorithm," Energies, MDPI, vol. 11(8), pages 1-18, August.
    10. Liang, Wei & Zhang, Zeqiang & Yin, Tao & Zhang, Yu & Wu, Tengfei, 2023. "Modelling and optimisation of energy consumption and profit-oriented multi-parallel partial disassembly line balancing problem," International Journal of Production Economics, Elsevier, vol. 262(C).
    11. Süleyman Mete & Faruk Serin & Zeynel Abidin Çil & Erkan Çelik & Eren Özceylan, 2023. "A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time," Annals of Operations Research, Springer, vol. 321(1), pages 371-408, February.
    12. Junyong Liang & Shunsheng Guo & Yunfei Zhang & Wenfang Liu & Shengwen Zhou, 2021. "Energy-Efficient Optimization of Two-Sided Disassembly Line Balance Considering Parallel Operation and Uncertain Using Multiobjective Flatworm Algorithm," Sustainability, MDPI, vol. 13(6), pages 1-23, March.
    13. Özceylan, Eren & Paksoy, Turan & Bektaş, Tolga, 2014. "Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 61(C), pages 142-164.
    14. Peng Hu & Feng Chu & Yunfei Fang & Peng Wu, 2022. "Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information," Journal of Combinatorial Optimization, Springer, vol. 43(5), pages 1423-1446, July.
    15. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    16. Ondemir, Onder & Gupta, Surendra M., 2014. "A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system," European Journal of Operational Research, Elsevier, vol. 233(2), pages 408-419.
    17. Shujin Qin & Xinkai Xie & Jiacun Wang & Xiwang Guo & Liang Qi & Weibiao Cai & Ying Tang & Qurra Tul Ann Talukder, 2024. "An Optimized Advantage Actor-Critic Algorithm for Disassembly Line Balancing Problem Considering Disassembly Tool Degradation," Mathematics, MDPI, vol. 12(6), pages 1-19, March.
    18. Esmat Baghdadi & Mahmood Shafiee & Babakalli Alkali, 2022. "Upgrading Strategy, Warranty Policy and Pricing Decisions for Remanufactured Products Sold with Two-Dimensional Warranty," Sustainability, MDPI, vol. 14(12), pages 1-15, June.
    19. Kalaycılar, Eda Göksoy & Azizoğlu, Meral & Yeralan, Sencer, 2016. "A disassembly line balancing problem with fixed number of workstations," European Journal of Operational Research, Elsevier, vol. 249(2), pages 592-604.
    20. D. E. Ighravwe & S. A. Oke & K. A. Adebiyi, 2017. "Preventive maintenance task balancing with spare parts optimisation via big-bang big-crunch algorithm," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 811-822, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:12:y:2020:i:18:p:7318-:d:409894. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.