IDEAS home Printed from https://ideas.repec.org/a/gam/jmathe/v8y2020i3p357-d329061.html
   My bibliography  Save this article

Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management

Author

Listed:
  • Soumya Kanti Hota

    (Department of Mathematics, Kazi Nazrul University, Nazrul Road, Kalla Bypass More, P.O.—Kalla (C. H.) Asansol, West Bengal 713340, India
    Department of Mathematics, Debra Thana Sahid Kshudiram Smriti Mahavidyalaya, Debra, Paschim Medinipur, West Bengal 721101, India)

  • Biswajit Sarkar

    (Department of Industrial Engineering, Yonsei University, 50 Yonsei-ro, Sinchon-dong, Seodaemun-gu, Seoul 03722, Korea)

  • Santanu Kumar Ghosh

    (Department of Mathematics, Kazi Nazrul University, Nazrul Road, Kalla Bypass More, P.O.—Kalla (C. H.) Asansol, West Bengal 713340, India)

Abstract

The effect of unreliable players on the supply chain management with a single-setup-multi-unequal-increasing-delivery-policy (SSMUID) along with a service-dependent demand and investment is discussed in this model. The manufacturer is unreliable which causes an increase of lead time and shortage. For solving the shortage problem and reducing lead time crashing cost (LTCC), an investment is utilized with the variable backorder price discounts. The number of transportation increases due to the new transportation policy and it causes pollution. Besides the fixed transportation and carbon emission cost (FTCEC), a container dependent carbon emission cost is applied. Some investments for setup cost reduction (SCR), ordering cost reduction (OCR), and quality improvement (QI) are considered. The lead time demand follows a normal distribution. The total cost of the supply chain is optimized and the model is tested numerically. The main intent of this study is to solve the shortage problem which occurs due to unreliability of the manufacturer. The study helps to reduce the unreliability issue of the manufacturer. The objective function is solved by using the classical optimization technique. Numerical results show that the discount for partial backorder enhances the profitability of the manufacturer. The sensitiveness of the parameters are discussed through the sensitivity of analysis and some special cases. Managerial insights provide the applicability of this study among different sectors.

Suggested Citation

  • Soumya Kanti Hota & Biswajit Sarkar & Santanu Kumar Ghosh, 2020. "Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
  • Handle: RePEc:gam:jmathe:v:8:y:2020:i:3:p:357-:d:329061
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2227-7390/8/3/357/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2227-7390/8/3/357/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Gruson, Matthieu & Cordeau, Jean-François & Jans, Raf, 2018. "The impact of service level constraints in deterministic lot sizing with backlogging," Omega, Elsevier, vol. 79(C), pages 91-103.
    2. Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    3. Chen, Frank Y. & Krass, Dmitry, 2001. "Inventory models with minimal service level constraints," European Journal of Operational Research, Elsevier, vol. 134(1), pages 120-140, October.
    4. Pan, Jason Chao-Hsien & Lo, Ming-Cheng & Hsiao, Yu-Cheng, 2004. "Optimal reorder point inventory models with variable lead time and backorder discount considerations," European Journal of Operational Research, Elsevier, vol. 158(2), pages 488-505, October.
    5. Inderfurth, K. & Kiesmüller, G.P., 2015. "Exact and heuristic linear-inflation policies for an inventory model with random yield and arbitrary lead times," European Journal of Operational Research, Elsevier, vol. 245(1), pages 109-120.
    6. Biswajit Sarkar & Sharmila Saren & Debjani Sinha & Sun Hur, 2015. "Effect of Unequal Lot Sizes, Variable Setup Cost, and Carbon Emission Cost in a Supply Chain Model," Mathematical Problems in Engineering, Hindawi, vol. 2015, pages 1-13, November.
    7. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    8. Albrecht, Martin, 2017. "Optimization of safety stocks in models with an order service level objective or constraint," European Journal of Operational Research, Elsevier, vol. 263(3), pages 900-909.
    9. Mukhopadhyay, Samar K. & Ma, Huafan, 2009. "Joint procurement and production decisions in remanufacturing under quality and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 120(1), pages 5-17, July.
    10. Jain, Aditya & Bala, Ram, 2018. "Differentiated or integrated: Capacity and service level choice for differentiated products," European Journal of Operational Research, Elsevier, vol. 266(3), pages 1025-1037.
    11. Lin, Yu-Jen, 2008. "Minimax distribution free procedure with backorder price discount," International Journal of Production Economics, Elsevier, vol. 111(1), pages 118-128, January.
    12. Goyal, Suresh K. & Nebebe, Fassil, 2000. "Determination of economic production-shipment policy for a single-vendor-single-buyer system," European Journal of Operational Research, Elsevier, vol. 121(1), pages 175-178, February.
    13. Sarkar, Biswajit & Ganguly, Baishakhi & Sarkar, Mitali & Pareek, Sarla, 2016. "Effect of variable transportation and carbon emission in a three-echelon supply chain model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 91(C), pages 112-128.
    14. Song Xu & Xiaotong Zhang & Lipan Feng & Wenting Yang, 2020. "Disruption risks in supply chain management: a literature review based on bibliometric analysis," International Journal of Production Research, Taylor & Francis Journals, vol. 58(11), pages 3508-3526, June.
    15. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    16. Sawik, Tadeusz, 2019. "Disruption mitigation and recovery in supply chains using portfolio approach," Omega, Elsevier, vol. 84(C), pages 232-248.
    17. Kaczmarczyk, Waldemar, 2020. "Valid inequalities for proportional lot-sizing and scheduling problem with fictitious microperiods," International Journal of Production Economics, Elsevier, vol. 219(C), pages 236-247.
    18. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    19. Ullah, Mehran & Sarkar, Biswajit, 2020. "Recovery-channel selection in a hybrid manufacturing-remanufacturing production model with RFID and product quality," International Journal of Production Economics, Elsevier, vol. 219(C), pages 360-374.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
    2. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "The Effect of O2O Retail Service Quality in Supply Chain Management," Mathematics, MDPI, vol. 8(10), pages 1-36, October.
    3. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    4. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    5. Asif Iqbal Malik & Biswajit Sarkar, 2019. "Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction," Mathematics, MDPI, vol. 7(5), pages 1-28, May.
    6. Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.
    7. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    8. Ventura, José A. & Bunn, Kevin A. & Venegas, Bárbara B. & Duan, Lisha, 2021. "A coordination mechanism for supplier selection and order quantity allocation with price-sensitive demand and finite production rates," International Journal of Production Economics, Elsevier, vol. 233(C).
    9. Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
    10. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    11. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    12. Li, Xiang, 2020. "Reducing channel costs by investing in smart supply chain technologies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 137(C).
    13. Mowmita Mishra & Soumya Kanti Hota & Santanu Kumar Ghosh & Biswajit Sarkar, 2020. "Controlling Waste and Carbon Emission for a Sustainable Closed-Loop Supply Chain Management under a Cap-and-Trade Strategy," Mathematics, MDPI, vol. 8(4), pages 1-24, March.
    14. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    15. Sarkar, Biswajit & Sarkar, Mitali & Ganguly, Baishakhi & Cárdenas-Barrón, Leopoldo Eduardo, 2021. "Combined effects of carbon emission and production quality improvement for fixed lifetime products in a sustainable supply chain management," International Journal of Production Economics, Elsevier, vol. 231(C).
    16. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
    17. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
    18. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
    19. Sajjad Aslani Khiavi & Hamid Khaloozadeh & Fahimeh Soltanian, 2021. "Suboptimal sliding manifold For nonlinear supply chain with time delay," Journal of Combinatorial Optimization, Springer, vol. 42(1), pages 151-173, July.
    20. Bikash Koli Dey & Hyesung Seok, 2024. "Intelligent inventory management with autonomation and service strategy," Journal of Intelligent Manufacturing, Springer, vol. 35(1), pages 307-330, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:8:y:2020:i:3:p:357-:d:329061. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.