IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v155y2014icp204-213.html
   My bibliography  Save this article

Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process

Author

Listed:
  • Sarkar, Biswajit
  • Moon, Ilkyeong

Abstract

This paper illustrates the relationship between quality improvement, reorder point, and lead time, as affected by backorder rate, in an imperfect production process. To reduce the total system cost by optimizing the setup cost, lot size, lead time, reorder point, and process quality parameter simultaneously, we first consider that the lead time demand follows a normal distribution, then we apply the distribution free approach for the lead time demand. We prove two lemmas which are used to find optimal solutions for the basic and distribution free models. We compare our models with the existing models using numerical examples and show that significant savings over the existing models can be achieved.

Suggested Citation

  • Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
  • Handle: RePEc:eee:proeco:v:155:y:2014:i:c:p:204-213
    DOI: 10.1016/j.ijpe.2013.11.014
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731300529X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2013.11.014?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Liao, Yi & Banerjee, Avijit & Yan, Changyuan, 2011. "A distribution-free newsvendor model with balking and lost sales penalty," International Journal of Production Economics, Elsevier, vol. 133(1), pages 224-227, September.
    2. B R Cobb, 2013. "Mixture distributions for modelling demand during lead time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 64(2), pages 217-228, February.
    3. Alfares, Hesham K. & Elmorra, Hassan H., 2005. "The distribution-free newsboy problem: Extensions to the shortage penalty case," International Journal of Production Economics, Elsevier, vol. 93(1), pages 465-477, January.
    4. Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
    5. Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    6. Lee, Wen-Chuan & Wu, Jong-Wuu & Hou, Wen-Bin, 2004. "A note on inventory model involving variable lead time with defective units for mixtures of distribution," International Journal of Production Economics, Elsevier, vol. 89(1), pages 31-44, May.
    7. Pan, Jason Chao-Hsien & Hsiao, Yu-Cheng, 2005. "Integrated inventory models with controllable lead time and backorder discount considerations," International Journal of Production Economics, Elsevier, vol. 93(1), pages 387-397, January.
    8. Pan, Jason Chao-Hsien & Lo, Ming-Cheng & Hsiao, Yu-Cheng, 2004. "Optimal reorder point inventory models with variable lead time and backorder discount considerations," European Journal of Operational Research, Elsevier, vol. 158(2), pages 488-505, October.
    9. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
    10. Lin, Yu-Jen, 2008. "Minimax distribution free procedure with backorder price discount," International Journal of Production Economics, Elsevier, vol. 111(1), pages 118-128, January.
    11. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    12. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    13. Lee, Chih-Ming & Hsu, Shu-Lu, 2011. "The effect of advertising on the distribution-free newsboy problem," International Journal of Production Economics, Elsevier, vol. 129(1), pages 217-224, January.
    14. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    15. Ouyang, Liang-Yuh & Wu, Kun-Shan, 1998. "A minimax distribution free procedure for mixed inventory model with variable lead time," International Journal of Production Economics, Elsevier, vol. 56(1), pages 511-516, September.
    16. Silver, Edward A., 1992. "Changing the givens in modelling inventory problems: the example of just-in-time systems," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 347-351, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Shaktipada Bhuniya & Biswajit Sarkar & Sarla Pareek, 2019. "Multi-Product Production System with the Reduced Failure Rate and the Optimum Energy Consumption under Variable Demand," Mathematics, MDPI, vol. 7(5), pages 1-20, May.
    2. Biswajit Sarkar & Muhammad Tayyab & Seok-Beom Choi, 2018. "Product Channeling in an O2O Supply Chain Management as Power Transmission in Electric Power Distribution Systems," Mathematics, MDPI, vol. 7(1), pages 1-12, December.
    3. Muhammad Tayyab & Biswajit Sarkar & Misbah Ullah, 2018. "Sustainable Lot Size in a Multistage Lean-Green Manufacturing Process under Uncertainty," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
    4. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "The Effect of O2O Retail Service Quality in Supply Chain Management," Mathematics, MDPI, vol. 8(10), pages 1-36, October.
    5. Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
    6. Biswajit Sarkar & Sharmila Saren & Mitali Sarkar & Yong Won Seo, 2016. "A Stackelberg Game Approach in an Integrated Inventory Model with Carbon-Emission and Setup Cost Reduction," Sustainability, MDPI, vol. 8(12), pages 1-23, December.
    7. Umakanta Mishra & Jei-Zheng Wu & Anthony Shun Fung Chiu, 2019. "Effects of Carbon-Emission and Setup Cost Reduction in a Sustainable Electrical Energy Supply Chain Inventory System," Energies, MDPI, vol. 12(7), pages 1-18, March.
    8. R. Uthayakumar & B. Karthick, 2023. "Analysis of several reduction strategies on a two-echelon sustainable supply chain model with triangular fuzzy demand," OPSEARCH, Springer;Operational Research Society of India, vol. 60(1), pages 393-419, March.
    9. R. Udayakumar & S. Priyan & Mandeep Mittal & Anuwat Jirawattanapanit & Grienggrai Rajchakit & Pramet Kaewmesri, 2022. "A Sustainable Production Scheduling with Backorders under Different Forms of Rework Process and Green Investment," Sustainability, MDPI, vol. 14(24), pages 1-38, December.
    10. Tufail Habib & Muhammad Omair & Muhammad Salman Habib & Muhammad Zeeshan Zahir & Sikandar Bilal Khattak & Se-Jin Yook & Muhammad Aamir & Rehman Akhtar, 2023. "Modular Product Architecture for Sustainable Flexible Manufacturing in Industry 4.0: The Case of 3D Printer and Electric Toothbrush," Sustainability, MDPI, vol. 15(2), pages 1-29, January.
    11. Sinisterra, Wilfrido Quiñones & Cavalcante, Cristiano Alexandre Virgínio, 2020. "An integrated model of production scheduling and inspection planning for resumable jobs," International Journal of Production Economics, Elsevier, vol. 227(C).
    12. Yong Zhang & Xingyu Yang & Weiguo Zhang & Weiwei Chen, 2020. "Online ordering rules for the multi-period newsvendor problem with quantity discounts," Annals of Operations Research, Springer, vol. 288(1), pages 495-524, May.
    13. Muhammad Omair & Biswajit Sarkar & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Minimum Quantity Lubrication and Carbon Footprint: A Step towards Sustainability," Sustainability, MDPI, vol. 9(5), pages 1-18, April.
    14. Pourmohammad Zia, Nadia & Taleizadeh, Ata Allah, 2015. "A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 82(C), pages 19-37.
    15. Golmohammadi, Amirmohsen & Taghavi, Majid & Farivar, Samira & Azad, Nader, 2018. "Three strategies for engaging a buyer in supplier development efforts," International Journal of Production Economics, Elsevier, vol. 206(C), pages 1-14.
    16. Sarkar, Biswajit & Sarkar, Mitali & Ganguly, Baishakhi & Cárdenas-Barrón, Leopoldo Eduardo, 2021. "Combined effects of carbon emission and production quality improvement for fixed lifetime products in a sustainable supply chain management," International Journal of Production Economics, Elsevier, vol. 231(C).
    17. Gong, Qiguo & Chen, Guohui & Zhang, Wen & Wang, Hui, 2022. "The role of humans in flexible smart factories," International Journal of Production Economics, Elsevier, vol. 254(C).
    18. Muhammad Tayyab & Biswajit Sarkar & Bernardo Nugroho Yahya, 2018. "Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
    19. Florian Johannsen & Hans-Georg Fill, 2017. "Meta Modeling for Business Process Improvement," Business & Information Systems Engineering: The International Journal of WIRTSCHAFTSINFORMATIK, Springer;Gesellschaft für Informatik e.V. (GI), vol. 59(4), pages 251-275, August.
    20. Naoufel Cheikhrouhou & Biswajit Sarkar & Baishakhi Ganguly & Asif Iqbal Malik & Rafael Batista & Young Hae Lee, 2018. "Optimization of sample size and order size in an inventory model with quality inspection and return of defective items," Annals of Operations Research, Springer, vol. 271(2), pages 445-467, December.
    21. Barun Khara & Jayanta Kumar Dey & Shyamal Kumar Mondal, 2021. "An integrated imperfect production system with advertisement dependent demand using branch and bound technique," Flexible Services and Manufacturing Journal, Springer, vol. 33(2), pages 508-546, June.
    22. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    23. Bikash Koli Dey & Biswajit Sarkar & Sarla Pareek, 2019. "A Two-Echelon Supply Chain Management With Setup Time and Cost Reduction, Quality Improvement and Variable Production Rate," Mathematics, MDPI, vol. 7(4), pages 1-25, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Soumya Kanti Hota & Biswajit Sarkar & Santanu Kumar Ghosh, 2020. "Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
    2. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    3. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    4. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
    5. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    6. Hoque, M.A., 2013. "A vendor–buyer integrated production–inventory model with normal distribution of lead time," International Journal of Production Economics, Elsevier, vol. 144(2), pages 409-417.
    7. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    8. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    9. Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
    10. Hsien-Jen Lin, 2015. "A stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributions," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 386-400, July.
    11. Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
    12. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    13. Sumon Sarkar & Bibhas C. Giri, 2022. "Safety stock management in a supply chain model with waiting time and price discount dependent backlogging rate in stochastic environment," Operational Research, Springer, vol. 22(2), pages 917-946, April.
    14. Asif Iqbal Malik & Biswajit Sarkar, 2019. "Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction," Mathematics, MDPI, vol. 7(5), pages 1-28, May.
    15. Li, Xiang, 2020. "Reducing channel costs by investing in smart supply chain technologies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 137(C).
    16. Raza, Syed Asif, 2015. "An integrated approach to price differentiation and inventory decisions with demand leakage," International Journal of Production Economics, Elsevier, vol. 164(C), pages 105-117.
    17. Su, Rung Hung & Pearn, Wen Lea, 2011. "Product selection for newsboy-type products with normal demands and unequal costs," International Journal of Production Economics, Elsevier, vol. 132(2), pages 214-222, August.
    18. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    19. Haider Ali & Reshma Nasreen & Neetu Arneja & Chandra K. Jaggi, 2023. "Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 241-266, February.
    20. Bai, Qingguo & Xu, Jianteng & Gong, Yeming & Chauhan, Satyaveer S., 2022. "Robust decisions for regulated sustainable manufacturing with partial demand information: Mandatory emission capacity versus emission tax," European Journal of Operational Research, Elsevier, vol. 298(3), pages 874-893.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:155:y:2014:i:c:p:204-213. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.