IDEAS home Printed from https://ideas.repec.org/a/spr/topjnl/v23y2015i2p386-400.html
   My bibliography  Save this article

A stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributions

Author

Listed:
  • Hsien-Jen Lin

Abstract

A mixture inventory system analyzed in this paper explores the problem that the lead time and ordering cost reductions are inter-dependent in a periodic review inventory model with back-order price discounts for protection interval demand with the mixture of normal distributions. The objectives of this paper are twofold. First, we want to correct and improve the recently studied model by optimizing the review period, back-order price discount, target level and lead time simultaneously to achieve significant savings in the total related cost and higher service level. Second, we consider that the demands of the different customers are not identical in the protection interval to accommodate more practical features of the real inventory systems. For the proposed model, a computational algorithm with the help of the software Mathematica 7 is furnished to derive the optimal solution. Finally, we provide numerical examples to illustrate the results. Copyright Sociedad de Estadística e Investigación Operativa 2015

Suggested Citation

  • Hsien-Jen Lin, 2015. "A stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributions," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 386-400, July.
  • Handle: RePEc:spr:topjnl:v:23:y:2015:i:2:p:386-400
    DOI: 10.1007/s11750-014-0345-9
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1007/s11750-014-0345-9
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1007/s11750-014-0345-9?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lin, Yu-Jen, 2008. "Minimax distribution free procedure with backorder price discount," International Journal of Production Economics, Elsevier, vol. 111(1), pages 118-128, January.
    2. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    3. M A Hoque & S K Goyal, 2004. "Some comments on ‘Inventory models with fixed and variable lead time crash costs consideration’," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 674-676, June.
    4. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    5. Lee, Wen-Chuan & Wu, Jong-Wuu & Hou, Wen-Bin, 2004. "A note on inventory model involving variable lead time with defective units for mixtures of distribution," International Journal of Production Economics, Elsevier, vol. 89(1), pages 31-44, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Haider Ali & Reshma Nasreen & Neetu Arneja & Chandra K. Jaggi, 2023. "Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 241-266, February.
    2. Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
    3. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    4. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
    5. Yu-Jen Lin & Chia-Huei Ho, 2011. "Integrated inventory model with quantity discount and price-sensitive demand," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 19(1), pages 177-188, July.
    6. Qiu, Ruozhen & Sun, Minghe & Lim, Yun Fong, 2017. "Optimizing (s, S) policies for multi-period inventory models with demand distribution uncertainty: Robust dynamic programing approaches," European Journal of Operational Research, Elsevier, vol. 261(3), pages 880-892.
    7. Rabin Kumar Mallick & Kartik Patra & Shyamal Kumar Mondal, 2020. "Mixture inventory model of lost sale and back-order with stochastic lead time demand on permissible delay in payments," Annals of Operations Research, Springer, vol. 292(1), pages 341-369, September.
    8. Guo Li & Mengqi Liu & Xu Guan, 2017. "Diversity of payment contracts in a decentralized assembly system," Annals of Operations Research, Springer, vol. 257(1), pages 613-639, October.
    9. Dipak Barman & Gour Chandra Mahata, 2022. "Two-echelon production inventory model with imperfect quality items with ordering cost reduction depending on controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(5), pages 2656-2671, October.
    10. Lee, Jun-Yeon & Schwarz, Leroy B., 2009. "Leadtime management in a periodic-review inventory system: A state-dependent base-stock policy," European Journal of Operational Research, Elsevier, vol. 199(1), pages 122-129, November.
    11. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    12. Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
    13. Riezebos, Jan & Zhu, Stuart X., 2020. "Inventory control with seasonality of lead times," Omega, Elsevier, vol. 92(C).
    14. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
    15. Soumya Kanti Hota & Biswajit Sarkar & Santanu Kumar Ghosh, 2020. "Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
    16. Yue, Jinfeng & Wang, Min-Chiang & Chen, Bintong, 2007. "Mean-range based distribution-free procedures to minimize "overage" and "underage" costs," European Journal of Operational Research, Elsevier, vol. 176(2), pages 1103-1116, January.
    17. Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
    18. Ting-Chen Hu & Kuo-Chen Hung & Kuo-Lung Yang, 2019. "The Convergence of Gallego’s Iterative Method for Distribution-Free Inventory Models," Mathematics, MDPI, vol. 7(5), pages 1-10, May.
    19. Chandra, Charu & Grabis, Janis, 2008. "Inventory management with variable lead-time dependent procurement cost," Omega, Elsevier, vol. 36(5), pages 877-887, October.
    20. Hum, Sin-Hoon & Parlar, Mahmut & Zhou, Yun, 2018. "Measurement and optimization of responsiveness in supply chain networks with queueing structures," European Journal of Operational Research, Elsevier, vol. 264(1), pages 106-118.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:topjnl:v:23:y:2015:i:2:p:386-400. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.