IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v76y2002i1p1-12.html
   My bibliography  Save this article

A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales

Author

Listed:
  • Ouyang, Liang-Yuh
  • Chang, Hung-Chi

Abstract

No abstract is available for this item.

Suggested Citation

  • Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
  • Handle: RePEc:eee:proeco:v:76:y:2002:i:1:p:1-12
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(01)00142-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. אסתר טולידנו, 1996. "מקבלי דמי אבטלה בשנת 1995," Working Papers 509, National Insurance Institute of Israel.
    2. יעקב צדקה, 1991. "משפחתונים לקשישים בטבריה," Working Papers 80, National Insurance Institute of Israel.
    3. חנה וייל, 1995. "סיעוד במגזר הערבי," Working Papers 397, National Insurance Institute of Israel.
    4. אסתר טולידנו, 1995. "מקבלי דמי אבטלה בשנת 1994," Working Papers 444, National Insurance Institute of Israel.
    5. Moon, Ilkyeong & Choi, Sangjin, 1997. "Distribution free procedures for make-to-order (MTO), make-in-advance (MIA), and composite policies," International Journal of Production Economics, Elsevier, vol. 48(1), pages 21-28, January.
    6. הנק הבסי ובלהה זיסלין, 1996. "תב"ל - תעסוקת בית למרותקים," Working Papers 162, National Insurance Institute of Israel.
    7. אסתר טולידנו, 1991. "מקבלי דמי אבטלה בשנת 1990," Working Papers 514, National Insurance Institute of Israel.
    8. Chang, San-Chyi & Yao, Jing-Shing & Lee, Huey-Ming, 1998. "Economic reorder point for fuzzy backorder quantity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 183-202, August.
    9. Roy, T.K. & Maiti, M., 1997. "A fuzzy EOQ model with demand-dependent unit cost under limited storage capacity," European Journal of Operational Research, Elsevier, vol. 99(2), pages 425-432, June.
    10. דבי עובדיה, 1991. "קו חירום לנשים מוכות," Working Papers 203, National Insurance Institute of Israel.
    11. תמר אליאב, 1996. "גמלאות אמהות 1995‎-1992," Working Papers 395, National Insurance Institute of Israel.
    12. רבקה פריאור, 1991. "גמלאות נפגעי עבודה, 1989," Working Papers 496, National Insurance Institute of Israel.
    13. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    14. Ouyang, Liang-Yuh & Wu, Kun-Shan, 1998. "A minimax distribution free procedure for mixed inventory model with variable lead time," International Journal of Production Economics, Elsevier, vol. 56(1), pages 511-516, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chen, Chen-Tung & Huang, Sue-Fen, 2006. "Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times," International Journal of Production Economics, Elsevier, vol. 101(1), pages 185-193, May.
    2. Debdulal Panda & Mahendra Rong & Manoranjan Maiti, 2014. "Fuzzy mixture two warehouse inventory model involving fuzzy random variable lead time demand and fuzzy total demand," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 22(1), pages 187-209, March.
    3. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    4. Wang, Charles X. & Webster, Scott & Zhang, Sidong, 2014. "Robust price-setting newsvendor model with interval market size and consumer willingness-to-pay," International Journal of Production Economics, Elsevier, vol. 154(C), pages 100-112.
    5. Mostard, Julien & de Koster, Rene & Teunter, Ruud, 2005. "The distribution-free newsboy problem with resalable returns," International Journal of Production Economics, Elsevier, vol. 97(3), pages 329-342, September.
    6. Lin, Yu-Jen, 2008. "Minimax distribution free procedure with backorder price discount," International Journal of Production Economics, Elsevier, vol. 111(1), pages 118-128, January.
    7. Chang, Hung-Chi & Yao, Jing-Shing & Ouyang, Liang-Yuh, 2006. "Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand," European Journal of Operational Research, Elsevier, vol. 169(1), pages 65-80, February.
    8. Ghatee, Mehdi & Hashemi, S. Mehdi, 2009. "Traffic assignment model with fuzzy level of travel demand: An efficient algorithm based on quasi-Logit formulas," European Journal of Operational Research, Elsevier, vol. 194(2), pages 432-451, April.
    9. Su, Rung Hung & Pearn, Wen Lea, 2011. "Product selection for newsboy-type products with normal demands and unequal costs," International Journal of Production Economics, Elsevier, vol. 132(2), pages 214-222, August.
    10. Saldanha, John P., 2022. "Estimating the reorder point for a fill-rate target under a continuous review policy in the presence of non-standard lead-time demand distributions," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    11. Björk, Kaj-Mikael, 2012. "A multi-item fuzzy economic production quantity problem with a finite production rate," International Journal of Production Economics, Elsevier, vol. 135(2), pages 702-707.
    12. Zhongwei Feng & Yan Ma & Yuzhong Yang, 2023. "Credibilistic Cournot Game with Risk Aversion under a Fuzzy Environment," Mathematics, MDPI, vol. 11(4), pages 1-18, February.
    13. Chakrabortty, Susovan & Pal, Madhumangal & Nayak, Prasun Kumar, 2013. "Intuitionistic fuzzy optimization technique for Pareto optimal solution of manufacturing inventory models with shortages," European Journal of Operational Research, Elsevier, vol. 228(2), pages 381-387.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
    2. Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
    3. Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.
    4. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
    5. Hinterhuber, Hans H. & Friedrich, Stephan A., 2002. "The technology dimension of strategic leadership : The leadership challenge for production economists," International Journal of Production Economics, Elsevier, vol. 77(3), pages 191-203, June.
    6. Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo, 2002. "Inventory management in supply chains: a reinforcement learning approach," International Journal of Production Economics, Elsevier, vol. 78(2), pages 153-161, July.
    7. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    8. Kangasharju, Aki & Nijkamp, Peter, 2001. "Innovation dynamics in space: local actors and local factors," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 31-56, March.
    9. Petroni, Alberto & Rizzi, Antonio, 2002. "A fuzzy logic based methodology to rank shop floor dispatching rules," International Journal of Production Economics, Elsevier, vol. 76(1), pages 99-108, March.
    10. Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
    11. Nasierowski, W. & Arcelus, F. J., 2003. "On the efficiency of national innovation systems," Socio-Economic Planning Sciences, Elsevier, vol. 37(3), pages 215-234, September.
    12. Banerjee, Snehamay & Banerjee, Avijit & Burton, Jonathan & Bistline, William, 2001. "Controlled partial shipments in two-echelon supply chain networks: a simulation study," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 91-100, May.
    13. Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2014. "Network DEA II," International Series in Operations Research & Management Science, in: Wade D. Cook & Joe Zhu (ed.), Data Envelopment Analysis, edition 127, chapter 0, pages 307-327, Springer.
    14. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
    15. Percy, David F. & Kobbacy, Khairy A. H. & Fawzi, Bahir B., 1997. "Setting preventive maintenance schedules when data are sparse," International Journal of Production Economics, Elsevier, vol. 51(3), pages 223-234, September.
    16. Muda, Shaladdin & Hendry, Linda, 2002. "Developing a new world class model for small and medium sized make-to-order companies," International Journal of Production Economics, Elsevier, vol. 78(3), pages 295-310, August.
    17. Ammar, Salwa & Wright, Ronald, 2000. "Applying fuzzy-set theory to performance evaluation," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 285-302, December.
    18. Huiskonen, Janne & Pirttila, Timo, 2002. "Lateral coordination in a logistics outsourcing relationship," International Journal of Production Economics, Elsevier, vol. 78(2), pages 177-185, July.
    19. Lillrank, Paul & Holopainen, Sami & Paavola, Teemu, 2002. "Analyzing productivity with the enabler-effect map," International Journal of Production Economics, Elsevier, vol. 78(1), pages 69-78, July.
    20. Avkiran, Necmi K., 2001. "Investigating technical and scale efficiencies of Australian Universities through data envelopment analysis," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 57-80, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:76:y:2002:i:1:p:1-12. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.