IDEAS home Printed from https://ideas.repec.org/a/spr/ijsaem/v14y2023i1d10.1007_s13198-022-01784-1.html
   My bibliography  Save this article

Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items

Author

Listed:
  • Haider Ali

    (Jamia Hamdard)

  • Reshma Nasreen

    (Jamia Hamdard)

  • Neetu Arneja

    (University of Delhi)

  • Chandra K. Jaggi

    (University of Delhi)

Abstract

The study deals with periodic inventory model, wherein for deteriorating items back-order price rebate can be given to the end customer. Here under the service category constraint, the paper examines manageable lead time. Deterioration can take the form of decay, spoilage, damage, obsolescence and loss of original value of the product. The service level constraints have been defined as the expected demand shortages at the end of the cycle for a given safety factor divided by quantity available for satisfying the demand per cycle. The paper attempts to calculate the overall cost reduction in sourcing the products if the lead time in procurement is crashed component wise. This crashing cost is considered as a linear function and has been dealt with under two cases, viz, case (1) demand-distribution is known (approach of Gaussian-distribution); case (2) demand-distribution is un-known (approach of mini-max-distribution). An algorithm which jointly-optimises backorder-price-rebate, review-period and lead-time under the known service level for deteriorating-items has been developed. The basic assumption in the above calculations is that shortages are partially backlogged. The results show that considerable savings could be accomplished with manageable lead time, which can be passed on to the customers in the form of rebate.

Suggested Citation

  • Haider Ali & Reshma Nasreen & Neetu Arneja & Chandra K. Jaggi, 2023. "Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 241-266, February.
  • Handle: RePEc:spr:ijsaem:v:14:y:2023:i:1:d:10.1007_s13198-022-01784-1
    DOI: 10.1007/s13198-022-01784-1
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s13198-022-01784-1
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s13198-022-01784-1?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chang, Hung-Chi & Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2006. "Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction," European Journal of Operational Research, Elsevier, vol. 170(2), pages 481-495, April.
    2. Sana, S. & Goyal, S. K. & Chaudhuri, K. S., 2004. "A production-inventory model for a deteriorating item with trended demand and shortages," European Journal of Operational Research, Elsevier, vol. 157(2), pages 357-371, September.
    3. Chern, Maw-Sheng & Yang, Hui-Ling & Teng, Jinn-Tsair & Papachristos, Sotiris, 2008. "Partial backlogging inventory lot-size models for deteriorating items with fluctuating demand under inflation," European Journal of Operational Research, Elsevier, vol. 191(1), pages 127-141, November.
    4. Chandra, Charu & Grabis, Janis, 2008. "Inventory management with variable lead-time dependent procurement cost," Omega, Elsevier, vol. 36(5), pages 877-887, October.
    5. Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
    6. Goyal, S. K. & Giri, B. C., 2003. "The production-inventory problem of a product with time varying demand, production and deterioration rates," European Journal of Operational Research, Elsevier, vol. 147(3), pages 549-557, June.
    7. S. Priyan & R. Uthayakumar, 2016. "Economic Design of Multi-echelon Inventory System with Variable Lead Time and Service Level Constraint in a Fuzzy Cost Environment," Fuzzy Information and Engineering, Taylor & Francis Journals, vol. 8(4), pages 465-511, December.
    8. Lee, Wen-Chuan & Wu, Jong-Wuu & Hou, Wen-Bin, 2004. "A note on inventory model involving variable lead time with defective units for mixtures of distribution," International Journal of Production Economics, Elsevier, vol. 89(1), pages 31-44, May.
    9. Masae, Makusee & Glock, C. H. & Vichitkunakorn, Panupong, 2019. "Optimal Order Picker Routing in the Chevron Warehouse," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 117712, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    10. Masae, Makusee & Glock, C. H. & Vichitkunakorn, Panupong, 2019. "Optimal order picker routing in the chevron warehouse," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 119772, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    11. Sanjey Kumar & Neeraj Kumar, 2016. "An inventory model for deteriorating items under inflation and permissible delay in payments by genetic algorithm," Cogent Business & Management, Taylor & Francis Journals, vol. 3(1), pages 1239605-123, December.
    12. Goyal, S. K. & Giri, B. C., 2001. "Recent trends in modeling of deteriorating inventory," European Journal of Operational Research, Elsevier, vol. 134(1), pages 1-16, October.
    13. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    14. Aref Gholami & Abolfazl Mirzazadeh, 2018. "An inventory model with controllable lead time and ordering cost, log-normal-distributed demand, and gamma-distributed available capacity," Cogent Business & Management, Taylor & Francis Journals, vol. 5(1), pages 1469182-146, January.
    15. Lin, Yu-Jen, 2008. "Minimax distribution free procedure with backorder price discount," International Journal of Production Economics, Elsevier, vol. 111(1), pages 118-128, January.
    16. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    17. Douglas C. Montgomery & M. S. Bazaraa & Ajit K. Keswani, 1973. "Inventory models with a mixture of backorders and lost sales," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 20(2), pages 255-263, June.
    18. Wakhid Ahmad Jauhari, 2014. "Lot Size Decisions for Vendor-Buyer System with Quantity Discount, Partial Backorder, and Stochastic Demand," Advances in Operations Research, Hindawi, vol. 2014, pages 1-7, November.
    19. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
    20. Lodree Jr., Emmett J. & Uzochukwu, Benedict M., 2008. "Production planning for a deteriorating item with stochastic demand and consumer choice," International Journal of Production Economics, Elsevier, vol. 116(2), pages 219-232, December.
    21. Marcello Braglia & Davide Castellano & Marco Frosolini, 2016. "A novel approach to safety stock management in a coordinated supply chain with controllable lead time using present value," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 32(1), pages 99-112, January.
    22. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    23. Masae, Makusee & Glock, C. H., 2019. "Optimal Order Picker Routing in the Chevron Warehouse," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 116148, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    24. Masae, Makusee & Panupong, Vichitkunakorn & Glock, C. H., 2019. "Optimal routing of order pickers in the leaf warehouse," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 115506, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    25. Masae, M. & Glock, C. H. & Grosse, E. H., 2019. "Order picker routing in warehouses: A systematic literature review," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 118016, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Maria Giuffrida & Riccardo Mangiaracina & Umar Burki, 2021. "Cloud-Based Booking Platforms in Warehouse Operations," Sustainability, MDPI, vol. 13(20), pages 1-16, October.
    2. Bakker, Monique & Riezebos, Jan & Teunter, Ruud H., 2012. "Review of inventory systems with deterioration since 2001," European Journal of Operational Research, Elsevier, vol. 221(2), pages 275-284.
    3. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
    4. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    5. Hsien-Jen Lin, 2015. "A stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributions," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 386-400, July.
    6. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    7. Taleizadeh, Ata Allah & Noori-daryan, Mahsa & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items," International Journal of Production Economics, Elsevier, vol. 159(C), pages 285-295.
    8. Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
    9. Yu-Jen Lin & Chia-Huei Ho, 2011. "Integrated inventory model with quantity discount and price-sensitive demand," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 19(1), pages 177-188, July.
    10. Manish Shukla & Sanjay Jharkharia, 2014. "An inventory model for continuously deteriorating agri-fresh produce: an artificial immune system-based solution approach," International Journal of Integrated Supply Management, Inderscience Enterprises Ltd, vol. 9(1/2), pages 110-135.
    11. Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
    12. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    13. Wang, Wan-Chih & Teng, Jinn-Tsair & Lou, Kuo-Ren, 2014. "Seller’s optimal credit period and cycle time in a supply chain for deteriorating items with maximum lifetime," European Journal of Operational Research, Elsevier, vol. 232(2), pages 315-321.
    14. Dobson, Gregory & Pinker, Edieal J. & Yildiz, Ozlem, 2017. "An EOQ model for perishable goods with age-dependent demand rate," European Journal of Operational Research, Elsevier, vol. 257(1), pages 84-88.
    15. S. Hemapriya & R. Uthayakumar, 2017. "An inventory model with uncertain demand and lost sales reduction under service level constraint," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1399-1418, November.
    16. R. Udayakumar & K. V. Geetha, 2017. "Economic ordering policy for single item inventory model over finite time horizon," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 734-757, November.
    17. Bernstein, Fernando & Gürhan Kök, A. & Meca, Ana, 2015. "Cooperation in assembly systems: The role of knowledge sharing networks," European Journal of Operational Research, Elsevier, vol. 240(1), pages 160-171.
    18. Li, Xiang, 2020. "Reducing channel costs by investing in smart supply chain technologies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 137(C).
    19. Ghiami, Yousef & Beullens, Patrick, 2016. "Planning for shortages? Net Present Value analysis for a deteriorating item with partial backlogging," International Journal of Production Economics, Elsevier, vol. 178(C), pages 1-11.
    20. Massonnet, G. & Gayon, J.-P. & Rapine, C., 2014. "Approximation algorithms for deterministic continuous-review inventory lot-sizing problems with time-varying demand," European Journal of Operational Research, Elsevier, vol. 234(3), pages 641-649.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v:14:y:2023:i:1:d:10.1007_s13198-022-01784-1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.