Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2013.04.027
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Goyal, Suresh Kumar & Teng, Jinn-Tsair & Chang, Chun-Tao, 2007. "Optimal ordering policies when the supplier provides a progressive interest scheme," European Journal of Operational Research, Elsevier, vol. 179(2), pages 404-413, June.
- Petersen, Mitchell A & Rajan, Raghuram G, 1997.
"Trade Credit: Theories and Evidence,"
Review of Financial Studies, Society for Financial Studies, vol. 10(3), pages 661-691.
- Mitchell A. Petersen & Raghuram G. Rajan, "undated". "Trade Credit: Theories and Evidence," CRSP working papers 322, Center for Research in Security Prices, Graduate School of Business, University of Chicago.
- Mitchell A. Petersen & Raghuram G. Rajan, 1996. "Trade Credit: Theories and Evidence," NBER Working Papers 5602, National Bureau of Economic Research, Inc.
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
- Teng, Jinn-Tsair & Chang, Chun-Tao, 2009. "Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy," European Journal of Operational Research, Elsevier, vol. 195(2), pages 358-363, June.
- Teng, Jinn-Tsair & Chang, Chun-Tao & Goyal, Suresh Kumar, 2005. "Optimal pricing and ordering policy under permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 97(2), pages 121-129, August.
- Liao, Jui-Jung, 2008. "An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit," International Journal of Production Economics, Elsevier, vol. 113(2), pages 852-861, June.
- Chiu, Singa Wang, 2008. "Production lot size problem with failure in repair and backlogging derived without derivatives," European Journal of Operational Research, Elsevier, vol. 188(2), pages 610-615, July.
- Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
- Sana, Shib Sankar & Goyal, Suresh Kumar & Chaudhuri, Kripasindhu, 2007. "An imperfect production process in a volume flexible inventory model," International Journal of Production Economics, Elsevier, vol. 105(2), pages 548-559, February.
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
- Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
- Chang, Chun-Tao, 2004. "An EOQ model with deteriorating items under inflation when supplier credits linked to order quantity," International Journal of Production Economics, Elsevier, vol. 88(3), pages 307-316, April.
- Emery, Gary W., 1987. "An Optimal Financial Response to Variable Demand," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 22(2), pages 209-225, June.
- Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
- Musa, Abubakar & Sani, Babangida, 2012. "Inventory ordering policies of delayed deteriorating items under permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 136(1), pages 75-83.
- Ben-Daya, Mohamed, 2002. "The economic production lot-sizing problem with imperfect production processes and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 76(3), pages 257-264, April.
- Chang, Chun-Tao & Teng, Jinn-Tsair & Chern, Maw-Sheng, 2010. "Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits," International Journal of Production Economics, Elsevier, vol. 127(1), pages 197-202, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chen, Sheng-Chih & Teng, Jinn-Tsair, 2015. "Inventory and credit decisions for time-varying deteriorating items with up-stream and down-stream trade credit financing by discounted cash flow analysis," European Journal of Operational Research, Elsevier, vol. 243(2), pages 566-575.
- Mohsen Lashgari & Ata Allah Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
- Wu, Jiang & Skouri, Konstantina & Teng, Jinn-Tsair & Ouyang, Liang-Yuh, 2014. "A note on “optimal replenishment policies for non-instantaneous deteriorating items with price and stock sensitive demand under permissible delay in payment”," International Journal of Production Economics, Elsevier, vol. 155(C), pages 324-329.
- Wu, Jiang & Ouyang, Liang-Yuh & Cárdenas-Barrón, Leopoldo Eduardo & Goyal, Suresh Kumar, 2014. "Optimal credit period and lot size for deteriorating items with expiration dates under two-level trade credit financing," European Journal of Operational Research, Elsevier, vol. 237(3), pages 898-908.
- Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
- Xu, Xinhan & Chen, Xiangfeng & Jia, Fu & Brown, Steve & Gong, Yu & Xu, Yifan, 2018. "Supply chain finance: A systematic literature review and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 204(C), pages 160-173.
- Soni, Hardik N, 2013. "Optimal replenishment policies for non-instantaneous deteriorating items with price and stock sensitive demand under permissible delay in payment," International Journal of Production Economics, Elsevier, vol. 146(1), pages 259-268.
- Chen, Sheng-Chih & Teng, Jinn-Tsair & Skouri, Konstantina, 2014. "Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credit," International Journal of Production Economics, Elsevier, vol. 155(C), pages 302-309.
- Liang-Yuh Ouyang & Cheng-Ju Chuang & Chia-Huei Ho & Chien-Wei Wu, 2014. "An integrated inventory model with quality improvement and two-part credit policy," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 22(3), pages 1042-1061, October.
- San-José, Luis A. & Sicilia, Joaquín & García-Laguna, Juan, 2014. "Optimal lot size for a production–inventory system with partial backlogging and mixture of dispatching policies," International Journal of Production Economics, Elsevier, vol. 155(C), pages 194-203.
- Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
- Yu-Chung Tsao & Vu Thuy Linh, 2016. "Supply Chain Network Designs Developed for Deteriorating Items Under Conditions of Trade Credit and Partial Backordering," Networks and Spatial Economics, Springer, vol. 16(3), pages 933-956, September.
- Yu-Chung Tsao, 2015. "A piecewise nonlinear optimization for a production-inventory model under maintenance, variable setup costs, and trade credits," Annals of Operations Research, Springer, vol. 233(1), pages 465-481, October.
- Mohsen Lashgari & Ata Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
- A. Thangam, 2017. "Retailer’s optimal replenishment policy in a two-echelon supply chain under two-part delay in payments and disruption in delivery," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 26-46, January.
- Ruihai Li & Jinn-Tsair Teng & Yingfei Zheng, 2019. "Optimal credit term, order quantity and selling price for perishable products when demand depends on selling price, expiration date, and credit period," Annals of Operations Research, Springer, vol. 280(1), pages 377-405, September.
- Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
- Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Guchhait, Partha & Kumar Maiti, Manas & Maiti, Manoranjan, 2013. "Production-inventory models for a damageable item with variable demands and inventory costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 144(1), pages 180-188.
- Liang-Yuh Ouyang & Chun-Tao Chang & Philip Shum, 2012. "The EOQ with defective items and partially permissible delay in payments linked to order quantity derived algebraically," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 20(1), pages 141-160, March.
- Bakker, Monique & Riezebos, Jan & Teunter, Ruud H., 2012. "Review of inventory systems with deterioration since 2001," European Journal of Operational Research, Elsevier, vol. 221(2), pages 275-284.
- Lee, Sunghee & Kim, Daeki, 2014. "An optimal policy for a single-vendor single-buyer integrated production–distribution model with both deteriorating and defective items," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 161-170.
- Xu, Xinhan & Chen, Xiangfeng & Jia, Fu & Brown, Steve & Gong, Yu & Xu, Yifan, 2018. "Supply chain finance: A systematic literature review and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 204(C), pages 160-173.
- Seifert, Daniel & Seifert, Ralf W. & Protopappa-Sieke, Margarita, 2013. "A review of trade credit literature: Opportunities for research in operations," European Journal of Operational Research, Elsevier, vol. 231(2), pages 245-256.
- Chern, Maw-Sheng & Pan, Qinhua & Teng, Jinn-Tsair & Chan, Ya-Lan & Chen, Sheng-Chih, 2013. "Stackelberg solution in a vendor–buyer supply chain model with permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 144(1), pages 397-404.
- B. C. Giri & S. Sharma, 2016. "Optimal ordering policy for an inventory system with linearly increasing demand and allowable shortages under two levels trade credit financing," Operational Research, Springer, vol. 16(1), pages 25-50, April.
- A. Thangam, 2017. "Retailer’s optimal replenishment policy in a two-echelon supply chain under two-part delay in payments and disruption in delivery," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 26-46, January.
- Teng, Jinn-Tsair & Min, Jie & Pan, Qinhua, 2012. "Economic order quantity model with trade credit financing for non-decreasing demand," Omega, Elsevier, vol. 40(3), pages 328-335.
- Johari, Maryam & Hosseini-Motlagh, Seyyed-Mahdi & Nematollahi, Mohammadreza & Goh, Mark & Ignatius, Joshua, 2018. "Bi-level credit period coordination for periodic review inventory system with price-credit dependent demand under time value of money," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 270-291.
- Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
- Nita Shah & Monika Naik, 2019. "Coordinated production, ordering, shipment and pricing model for supplier-retailer inventory system under trade credit," Operations Research and Decisions, Wroclaw University of Technology, Institute of Organization and Management, vol. 2, pages 55-76.
- Chung, Kun-Jen & Eduardo Cárdenas-Barrón, Leopoldo & Ting, Pin-Shou, 2014. "An inventory model with non-instantaneous receipt and exponentially deteriorating items for an integrated three layer supply chain system under two levels of trade credit," International Journal of Production Economics, Elsevier, vol. 155(C), pages 310-317.
- Tsao, Yu-Chung, 2017. "Managing default risk under trade credit: Who should implement Big-Data analytics in supply chains?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 106(C), pages 276-293.
- Chen, Sheng-Chih & Cárdenas-Barrón, Leopoldo Eduardo & Teng, Jinn-Tsair, 2014. "Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity," International Journal of Production Economics, Elsevier, vol. 155(C), pages 284-291.
- Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
- Teng, Jinn-Tsair, 2009. "Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers," International Journal of Production Economics, Elsevier, vol. 119(2), pages 415-423, June.
- Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
- A. K. Manna & B. Das & J. K. Dey & S. K. Mondal, 0. "An EPQ model with promotional demand in random planning horizon: population varying genetic algorithm approach," Journal of Intelligent Manufacturing, Springer, vol. 0, pages 1-17.
More about this item
Keywords
Inventory; Imperfect production process; Complete backlogging; Permissible delay in payments; Arithmetic–geometric mean inequality;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:144:y:2013:i:2:p:610-617. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Haili He). General contact details of provider: http://www.elsevier.com/locate/ijpe .
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
Please note that corrections may take a couple of weeks to filter through the various RePEc services.