- Yuefeng Shi
(National Key Laboratory of High Speed Railway Track System, China Academy of Railway Sciences Corporation Limited, Beijing 100081, China
Railway Engineering Research Institute, China Academy of Railway Sciences Corporation Limited, Beijing 100081, China
China Academy of Railway Sciences Corporation Limited, Beijing 100081, China)
- Shiyu Tian
(School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing 102616, China)
- Yongjun Chen
(School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing 102616, China)
- Chaoxun Cai
(National Key Laboratory of High Speed Railway Track System, China Academy of Railway Sciences Corporation Limited, Beijing 100081, China
Railway Engineering Research Institute, China Academy of Railway Sciences Corporation Limited, Beijing 100081, China
China Academy of Railway Sciences Corporation Limited, Beijing 100081, China)
- Honghao Guan
(School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing 102616, China)
- Xiaojian Li
(School of Civil Engineering, Central South University, Changsha 410075, China)
Abstract
Extreme climatic conditions and active geological factors posed challenges in evaluating disaster risk trends in railway construction projects and identifying key influencing factors. Traditional technology is difficult to adapt to the exploration and unknown construction process of railway engineering in complex and difficult areas. Therefore, there is an urgent need for technological innovation. The study used the Vague set theory method to screen and determine a list of risk factors for railway engineering technology innovation in complex areas, including 5 primary risk indicators and 26 secondary risk indicators. Based on this, an evaluation system for risk factors of railway engineering technology innovation in complex areas was established. Secondly, this study combined the Analytic Hierarchy Process (AHP) and Entropy Weight Method (EWM) with a cloud model to comprehensively evaluate risks and create cloud maps. Based on the calculation results, the risk level of railway engineering technology innovation risk factors in complex areas is obtained as environmental factors > technological factors > social factors > management factors > resource factors. The “combination weighting-cloud model” framework adopted in this study effectively overcomes the problem of insufficient representation of traditional single weighting method by integrating subjective and objective weight optimization and dynamic risk coupling analysis and significantly improves the multidimensional adaptability and dynamic evaluation accuracy.
Suggested Citation
Yuefeng Shi & Shiyu Tian & Yongjun Chen & Chaoxun Cai & Honghao Guan & Xiaojian Li, 2025.
"Risk Assessment Method of Railway Engineering Technology Innovation in Complex Areas,"
Mathematics, MDPI, vol. 13(12), pages 1-23, June.
Handle:
RePEc:gam:jmathe:v:13:y:2025:i:12:p:1970-:d:1679281
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:13:y:2025:i:12:p:1970-:d:1679281. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.