IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v293y2021i3p926-940.html
   My bibliography  Save this article

Long-term resource planning in the high-tech industry: Capacity or inventory?

Author

Listed:
  • Smirnov, Dina
  • van Jaarsveld, Willem
  • Atan, Zümbül
  • de Kok, Ton

Abstract

Volatile and non-stationary demand, very complex production processes, long production and capacity acquisition leadtimes, and extremely high and rarely reversible capacity acquisition costs make capacity planning in the high-tech industry a particularly challenging managerial task. To cope with demand surges and hedge against its uncertainty, firms can invest in order to expand their capacity for the long-term. For the short-term, however, demand is often fixed due to committed orders, and excess capacity might be available that may be used to build up inventory as a complementary means of hedging against these demand surges and uncertainty. In multi-echelon systems, these decisions need to be made simultaneously and must be aligned over the echelons. We address the strategic problem of determining the optimal inventory buildup and capacity expansion timing and amount across locations of a multi-echelon supply chain, as well as the operational problem of production planning. We model the problem as a two-stage stochastic program (SP), with strategic decisions at the first stage and operational decisions at the second stage. We enumerate the capacity expansion timing and use the deterministic equivalent formulation to optimize the other strategic decisions. Through an extensive numerical study, we provide practical managerial insights into the system behavior.

Suggested Citation

  • Smirnov, Dina & van Jaarsveld, Willem & Atan, Zümbül & de Kok, Ton, 2021. "Long-term resource planning in the high-tech industry: Capacity or inventory?," European Journal of Operational Research, Elsevier, vol. 293(3), pages 926-940.
  • Handle: RePEc:eee:ejores:v:293:y:2021:i:3:p:926-940
    DOI: 10.1016/j.ejor.2020.12.062
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221720311243
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2020.12.062?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Karl G. Kempf & Feryal Erhun & Erik F. Hertzler & Timothy R. Rosenberg & Chen Peng, 2013. "Optimizing Capital Investment Decisions at Intel Corporation," Interfaces, INFORMS, vol. 43(1), pages 62-78, February.
    2. Swaminathan, Jayashankar M., 2000. "Tool capacity planning for semiconductor fabrication facilities under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 545-558, February.
    3. Wang, S.M. & Chen, J.C. & Wang, K.-J., 2007. "Resource portfolio planning of make-to-stock products using a constraint programming-based genetic algorithm," Omega, Elsevier, vol. 35(2), pages 237-246, April.
    4. Stephen C. Graves & Sean P. Willems, 2000. "Optimizing Strategic Safety Stock Placement in Supply Chains," Manufacturing & Service Operations Management, INFORMS, vol. 2(1), pages 68-83, June.
    5. Stefan Woerner & Marco Laumanns & Stephan M. Wagner, 2018. "Joint optimisation of capacity and safety stock allocation," International Journal of Production Research, Taylor & Francis Journals, vol. 56(13), pages 4612-4628, July.
    6. Bex George Thomas & Srinivas Bollapragada, 2010. "General Electric Uses an Integrated Framework for Product Costing, Demand Forecasting, and Capacity Planning of New Photovoltaic Technology Products," Interfaces, INFORMS, vol. 40(5), pages 353-367, October.
    7. Paul Glasserman & Sridhar Tayur, 1994. "The Stability of a Capacitated, Multi-Echelon Production-Inventory System Under a Base-Stock Policy," Operations Research, INFORMS, vol. 42(5), pages 913-925, October.
    8. Geng, Na & Jiang, Zhibin & Chen, Feng, 2009. "Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity," European Journal of Operational Research, Elsevier, vol. 198(3), pages 899-908, November.
    9. Lars Mönch & Reha Uzsoy & John W. Fowler, 2018. "A survey of semiconductor supply chain models part III: master planning, production planning, and demand fulfilment," International Journal of Production Research, Taylor & Francis Journals, vol. 56(13), pages 4565-4584, July.
    10. Stephen C. Graves & Tor Schoenmeyr, 2016. "Strategic Safety-Stock Placement in Supply Chains with Capacity Constraints," Manufacturing & Service Operations Management, INFORMS, vol. 18(3), pages 445-460, July.
    11. Lin, James T. & Chen, Tzu-Li & Chu, Hsiao-Ching, 2014. "A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 148(C), pages 21-36.
    12. Paul Glasserman & Sridhar Tayur, 1995. "Sensitivity Analysis for Base-Stock Levels in Multiechelon Production-Inventory Systems," Management Science, INFORMS, vol. 41(2), pages 263-281, February.
    13. Martínez-Costa, Carme & Mas-Machuca, Marta & Benedito, Ernest & Corominas, Albert, 2014. "A review of mathematical programming models for strategic capacity planning in manufacturing," International Journal of Production Economics, Elsevier, vol. 153(C), pages 66-85.
    14. Ralf Bihlmaier & Achim Koberstein & René Obst, 2009. "Modeling and optimazing of strategic and tactical production planning in the automotive industry under uncertainty," Springer Books, in: Herbert Meyr & Hans-Otto Günther (ed.), Supply Chain Planning, pages 367-392, Springer.
    15. Francisco Barahona & Stuart Bermon & Oktay Günlük & Sarah Hood, 2005. "Robust capacity planning in semiconductor manufacturing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 459-468, August.
    16. Alexandar Angelus & Evan L. Porteus, 2002. "Simultaneous Capacity and Production Management of Short-Life-Cycle, Produce-to-Stock Goods Under Stochastic Demand," Management Science, INFORMS, vol. 48(3), pages 399-413, March.
    17. Nina Linn Ulstein & Marielle Christiansen & Roar Grønhaug & Nick Magnussen & Marius M. Solomon, 2006. "Elkem Uses Optimization in Redesigning Its Supply Chain," Interfaces, INFORMS, vol. 36(4), pages 314-325, August.
    18. James R. Bradley & Peter W. Glynn, 2002. "Managing Capacity and Inventory Jointly in Manufacturing Systems," Management Science, INFORMS, vol. 48(2), pages 273-288, February.
    19. Placido dos Santos, Felipe Silva & Oliveira, Fabricio, 2019. "An enhanced L-Shaped method for optimizing periodic-review inventory control problems modeled via two-stage stochastic programming," European Journal of Operational Research, Elsevier, vol. 275(2), pages 677-693.
    20. Rapine, Christophe & Penz, Bernard & Gicquel, Céline & Akbalik, Ayse, 2018. "Capacity acquisition for the single-item lot sizing problem under energy constraints," Omega, Elsevier, vol. 81(C), pages 112-122.
    21. Reha Uzsoy & John W. Fowler & Lars Mönch, 2018. "A survey of semiconductor supply chain models Part II: demand planning, inventory management, and capacity planning," International Journal of Production Research, Taylor & Francis Journals, vol. 56(13), pages 4546-4564, July.
    22. Jan A. Van Mieghem, 2003. "Commissioned Paper: Capacity Management, Investment, and Hedging: Review and Recent Developments," Manufacturing & Service Operations Management, INFORMS, vol. 5(4), pages 269-302, July.
    23. Kai Huang & Shabbir Ahmed, 2009. "The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty," Operations Research, INFORMS, vol. 57(4), pages 893-904, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Martínez-Costa, Carme & Mas-Machuca, Marta & Benedito, Ernest & Corominas, Albert, 2014. "A review of mathematical programming models for strategic capacity planning in manufacturing," International Journal of Production Economics, Elsevier, vol. 153(C), pages 66-85.
    2. Hongmin Li & Stephen C. Graves & Woonghee Tim Huh, 2014. "Optimal Capacity Conversion for Product Transitions Under High Service Requirements," Manufacturing & Service Operations Management, INFORMS, vol. 16(1), pages 46-60, February.
    3. Ghadimi, Foad & Aouam, Tarik, 2021. "Planning capacity and safety stocks in a serial production–distribution system with multiple products," European Journal of Operational Research, Elsevier, vol. 289(2), pages 533-552.
    4. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    5. Jodlbauer, Herbert & Altendorfer, Klaus, 2010. "Trade-off between capacity invested and inventory needed," European Journal of Operational Research, Elsevier, vol. 203(1), pages 118-133, May.
    6. Sabet, Ehsan & Yazdani, Baback & Kian, Ramez & Galanakis, Kostas, 2020. "A strategic and global manufacturing capacity management optimisation model: A Scenario-based multi-stage stochastic programming approach," Omega, Elsevier, vol. 93(C).
    7. Bian, Yuan & Lemoine, David & Yeung, Thomas G. & Bostel, Nathalie & Hovelaque, Vincent & Viviani, Jean-laurent & Gayraud, Fabrice, 2018. "A dynamic lot-sizing-based profit maximization discounted cash flow model considering working capital requirement financing cost with infinite production capacity," International Journal of Production Economics, Elsevier, vol. 196(C), pages 319-332.
    8. Wu, Xiaole & Kouvelis, Panos & Matsuo, Hirofumi & Sano, Hiroki, 2014. "Horizontal coordinating contracts in the semiconductor industry," European Journal of Operational Research, Elsevier, vol. 237(3), pages 887-897.
    9. Jan A. Van Mieghem, 2003. "Commissioned Paper: Capacity Management, Investment, and Hedging: Review and Recent Developments," Manufacturing & Service Operations Management, INFORMS, vol. 5(4), pages 269-302, July.
    10. Torres-Rincón, Samuel & Sánchez-Silva, Mauricio & Bastidas-Arteaga, Emilio, 2021. "A multistage stochastic program for the design and management of flexible infrastructure networks," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
    11. Tan Wang & L. Jeff Hong, 2023. "Large-Scale Inventory Optimization: A Recurrent Neural Networks–Inspired Simulation Approach," INFORMS Journal on Computing, INFORMS, vol. 35(1), pages 196-215, January.
    12. Lin, James T. & Chen, Tzu-Li & Chu, Hsiao-Ching, 2014. "A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 148(C), pages 21-36.
    13. Tamer Boyacı & Özalp Özer, 2010. "Information Acquisition for Capacity Planning via Pricing and Advance Selling: When to Stop and Act?," Operations Research, INFORMS, vol. 58(5), pages 1328-1349, October.
    14. Liu, Kanglin & Liu, Changchun & Xiang, Xi & Tian, Zhili, 2023. "Testing facility location and dynamic capacity planning for pandemics with demand uncertainty," European Journal of Operational Research, Elsevier, vol. 304(1), pages 150-168.
    15. Stephen C. Graves & Tor Schoenmeyr, 2016. "Strategic Safety-Stock Placement in Supply Chains with Capacity Constraints," Manufacturing & Service Operations Management, INFORMS, vol. 18(3), pages 445-460, July.
    16. Phuc Hong Nguyen & Kung-Jeng Wang, 2019. "Strategic capacity portfolio planning under demand uncertainty and technological change," Flexible Services and Manufacturing Journal, Springer, vol. 31(4), pages 926-944, December.
    17. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    18. Majid Taghavi & Kai Huang, 2020. "A Lagrangian relaxation approach for stochastic network capacity expansion with budget constraints," Annals of Operations Research, Springer, vol. 284(2), pages 605-621, January.
    19. Jan A. Van Mieghem & Nils Rudi, 2002. "Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 313-335, August.
    20. Jianxin Fang & Brenda Cheang & Andrew Lim, 2023. "Problems and Solution Methods of Machine Scheduling in Semiconductor Manufacturing Operations: A Survey," Sustainability, MDPI, vol. 15(17), pages 1-44, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:293:y:2021:i:3:p:926-940. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.