Author
Listed:
- Fleuren, Tijn
- Merzifonluoglu, Yasemin
- Sotirov, Renata
- Hendriks, Maarten
Abstract
This paper studies production–inventory planning in high-tech low-volume manufacturing supply chains, where long production lead times, complex network structures, multiple capacity constraints, as well as non-stationary demand and supply uncertainty, complicate production and safety stock placement decisions. The majority of academic approaches considers these problems under limiting assumptions about the system, while practitioners mostly rely on suboptimal heuristic integration of plans. We bridge the gap between stylized stochastic inventory models and industrial production planning practices by developing novel practice-driven multi-stage stochastic programming models. We validate our methodology in the uncapacitated single-product setting without lead time uncertainty by benchmarking strategic safety stock levels against an approach based on the seminal stochastic service model, which we tailor to accommodate the non-stationary demand. Additionally, we analyze the impact of capacity constraints and lead time uncertainty on safety stock requirements, and demonstrate how the performance of the benchmark solution regresses under these complexities. Finally, to support production–inventory decisions in view of the short life cycles of high-tech products, we adapt our modeling framework to new product introduction planning under modular product design, motivated by the setting of our industry partner, ASML. Following a fast-time-to-market strategy, we investigate optimal ramp-up and phase-out plans given interdependent demand and supply uncertainty due to risks in technology development. This study highlights the flexibility of our approach in addressing specific challenges encountered in real-world planning problems.
Suggested Citation
Fleuren, Tijn & Merzifonluoglu, Yasemin & Sotirov, Renata & Hendriks, Maarten, 2025.
"Production–inventory planning in high-tech low-volume manufacturing supply chains,"
International Journal of Production Economics, Elsevier, vol. 288(C).
Handle:
RePEc:eee:proeco:v:288:y:2025:i:c:s0925527325001720
DOI: 10.1016/j.ijpe.2025.109687
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:288:y:2025:i:c:s0925527325001720. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.