IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v262y2017i2p660-672.html
   My bibliography  Save this article

Capacity optimization under uncertainty: The impact of operational time lags

Author

Listed:
  • Boonman, Hettie J.
  • Siddiqui, Afzal S.

Abstract

Time lags in switching operational modes are typical in the manufacturing and power sectors but are not treated in most real options models. In this paper, we consider a firm that has the opportunity to suspend and to resume production infinitely many times subject to a time lag after each startup decision. We contribute to the literature by allowing the firm to determine its level of installed capacity in conjunction with its optimal investment timing. We find that an increase in the length of the time lag results in an increase in the optimal capacity level. Capacity optimization also interacts with the length of the time lag to affect investment timing and the triggers to suspend and resume production, thereby weakening the result about hysteresis from a standard real options model. Under the assumption of a fixed level of capacity, a longer lag speeds up the decision to resume operations due to a positive upside to the revenue but delays the suspension of operations. By contrast, with capacity optimization, a longer time lag results in a larger capacity choice, which can indirectly delay the investment decision and the timing to resume operations. This indirect effect dominates when the level of market uncertainty is low and the time lag is initially small.

Suggested Citation

  • Boonman, Hettie J. & Siddiqui, Afzal S., 2017. "Capacity optimization under uncertainty: The impact of operational time lags," European Journal of Operational Research, Elsevier, vol. 262(2), pages 660-672.
  • Handle: RePEc:eee:ejores:v:262:y:2017:i:2:p:660-672
    DOI: 10.1016/j.ejor.2017.04.006
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221717303399
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2017.04.006?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ryuta Takashima & Makoto Goto & Motoh Tsujimura, 2010. "Irreversible Investment, Operating Flexibility, And Time Lags," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 27(02), pages 271-286.
    2. Bar-Ilan, Avner & Strange, William C, 1996. "Investment Lags," American Economic Review, American Economic Association, vol. 86(3), pages 610-622, June.
    3. Dixit, Avinash K, 1989. "Entry and Exit Decisions under Uncertainty," Journal of Political Economy, University of Chicago Press, vol. 97(3), pages 620-638, June.
    4. Krishnan S. Anand & Karan Girotra, 2007. "The Strategic Perils of Delayed Differentiation," Management Science, INFORMS, vol. 53(5), pages 697-712, May.
    5. Tsekrekos, Andrianos E., 2010. "The effect of mean reversion on entry and exit decisions under uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 34(4), pages 725-742, April.
    6. Jiri Chod & Nils Rudi, 2005. "Resource Flexibility with Responsive Pricing," Operations Research, INFORMS, vol. 53(3), pages 532-548, June.
    7. Deneckere, Raymond & Marvel, Howard P & Peck, James, 1997. "Demand Uncertainty and Price Maintenance: Markdowns as Destructive Competition," American Economic Review, American Economic Association, vol. 87(4), pages 619-641, September.
    8. Jan A. Van Mieghem & Maqbool Dada, 1999. "Price Versus Production Postponement: Capacity and Competition," Management Science, INFORMS, vol. 45(12), pages 1639-1649, December.
    9. van der Weijde, Adriaan Hendrik & Hobbs, Benjamin F., 2012. "The economics of planning electricity transmission to accommodate renewables: Using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty," Energy Economics, Elsevier, vol. 34(6), pages 2089-2101.
    10. Dangl, Thomas, 1999. "Investment and capacity choice under uncertain demand," European Journal of Operational Research, Elsevier, vol. 117(3), pages 415-428, September.
    11. Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
    12. Brennan, Michael J & Schwartz, Eduardo S, 1985. "Evaluating Natural Resource Investments," The Journal of Business, University of Chicago Press, vol. 58(2), pages 135-157, April.
    13. Michail Chronopoulos & Afzal Siddiqui, 2015. "When is it better to wait for a new version? Optimal replacement of an emerging technology under uncertainty," Annals of Operations Research, Springer, vol. 235(1), pages 177-201, December.
    14. Etheridge,Alison, 2002. "A Course in Financial Calculus," Cambridge Books, Cambridge University Press, number 9780521890779, October.
    15. Hagspiel, Verena & Huisman, Kuno J.M. & Kort, Peter M., 2016. "Volume flexibility and capacity investment under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 178(C), pages 95-108.
    16. Boonman, H.J. & Hagspiel, V. & Kort, P.M., 2015. "Dedicated vs product flexible production technology: Strategic capacity investment choice," European Journal of Operational Research, Elsevier, vol. 244(1), pages 141-152.
    17. Etheridge,Alison, 2002. "A Course in Financial Calculus," Cambridge Books, Cambridge University Press, number 9780521813853, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Manuel Castriotta & Michela Loi & Elona Marku & Luca Naitana, 2019. "What’s in a name? Exploring the conceptual structure of emerging organizations," Scientometrics, Springer;Akadémiai Kiadó, vol. 118(2), pages 407-437, February.
    2. Haejun Jeon, 2023. "Time-to-build and capacity expansion," Annals of Operations Research, Springer, vol. 328(2), pages 1461-1494, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Huberts, Nick F.D. & Rossi Silveira, Rafael, 2023. "How economic depreciation shapes the relationship of uncertainty with investments’ size & timing," International Journal of Production Economics, Elsevier, vol. 260(C).
    2. Xingang Wen & Peter M. Kort & Dolf Talman, 2017. "Volume flexibility and capacity investment: a real options approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(12), pages 1633-1646, December.
    3. Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2017. "Stepwise investment and capacity sizing under uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 447-472, March.
    4. Joachim Gahungu and Yves Smeers, 2012. "A Real Options Model for Electricity Capacity Expansion," RSCAS Working Papers 2012/08, European University Institute.
    5. Hagspiel, Verena & Kort, Peter M. & Nunes, Cláudia & Pimentel, Rita & Støre, Kristian, 2021. "Capacity optimization of an innovating firm," International Journal of Production Economics, Elsevier, vol. 233(C).
    6. GAHUNGU, Joachim & SMEERS, Yves, 2011. "A real options model for electricity capacity expansion," LIDAM Discussion Papers CORE 2011044, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    7. Hagspiel, Verena & Huisman, Kuno J.M. & Kort, Peter M., 2016. "Volume flexibility and capacity investment under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 178(C), pages 95-108.
    8. Adkins, Roger & Paxson, Dean, 2019. "Rescaling-contraction with a lower cost technology when revenue declines," European Journal of Operational Research, Elsevier, vol. 277(2), pages 574-586.
    9. Kou, Ying & Luo, Meifeng, 2018. "Market driven ship investment decision using the real option approach," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 714-729.
    10. Andrianos Tsekrekos, 2013. "Irreversible exit decisions under mean-reverting uncertainty," Journal of Economics, Springer, vol. 110(1), pages 5-23, September.
    11. Ravi Anupindi & Li Jiang, 2008. "Capacity Investment Under Postponement Strategies, Market Competition, and Demand Uncertainty," Management Science, INFORMS, vol. 54(11), pages 1876-1890, November.
    12. Sødal, Sigbjørn & Koekebakker, Steen & Aadland, Roar, 2008. "Market switching in shipping -- A real option model applied to the valuation of combination carriers," Review of Financial Economics, Elsevier, vol. 17(3), pages 183-203, August.
    13. Sødal, Sigbjørn, 2001. "Entry, Exit And Scrapping Decisions With Investment Lags: A Series Of Investment Models Based On A New Approach," University of California at Santa Barbara, Economics Working Paper Series qt7wg8z42b, Department of Economics, UC Santa Barbara.
    14. Peter Ritchken & Qi Wu, 2021. "Capacity Investment, Production Flexibility, and Capital Structure," Production and Operations Management, Production and Operations Management Society, vol. 30(12), pages 4593-4613, December.
    15. Akamatsu, Takashi & Nagae, Takeshi, 2011. "A network of options: Evaluating complex interdependent decisions under uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 35(5), pages 714-729, May.
    16. Balliauw, Matteo & Kort, Peter M. & Zhang, Anming, 2019. "Capacity investment decisions of two competing ports under uncertainty: A strategic real options approach," Transportation Research Part B: Methodological, Elsevier, vol. 122(C), pages 249-264.
    17. Nagae, Takeshi & Akamatsu, Takashi, 2008. "A generalized complementarity approach to solving real option problems," Journal of Economic Dynamics and Control, Elsevier, vol. 32(6), pages 1754-1779, June.
    18. Marmer, Vadim & Slade, Margaret E., 2018. "Investment and uncertainty with time to build: Evidence from entry into U.S. copper mining," Journal of Economic Dynamics and Control, Elsevier, vol. 95(C), pages 233-254.
    19. Siddiqui, Afzal & Takashima, Ryuta, 2012. "Capacity switching options under rivalry and uncertainty," European Journal of Operational Research, Elsevier, vol. 222(3), pages 583-595.
    20. Sigbjørn Sødal & Steen Koekebakker & Roar Aadland, 2008. "Market switching in shipping — A real option model applied to the valuation of combination carriers," Review of Financial Economics, John Wiley & Sons, vol. 17(3), pages 183-203, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:262:y:2017:i:2:p:660-672. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.