IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v125y2000i2p410-424.html
   My bibliography  Save this article

Hydro-electric unit commitment subject to uncertain demand

Author

Listed:
  • Philpott, A. B.
  • Craddock, M.
  • Waterer, H.

Abstract

No abstract is available for this item.

Suggested Citation

  • Philpott, A. B. & Craddock, M. & Waterer, H., 2000. "Hydro-electric unit commitment subject to uncertain demand," European Journal of Operational Research, Elsevier, vol. 125(2), pages 410-424, September.
  • Handle: RePEc:eee:ejores:v:125:y:2000:i:2:p:410-424
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00172-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Oliveira, P. & McKee, S. & Coles, C., 1993. "Optimal scheduling of a hydro thermal power generation system," European Journal of Operational Research, Elsevier, vol. 71(3), pages 334-340, December.
    2. Richard E. Rosenthal, 1981. "A Nonlinear Network Flow Algorithm for Maximization of Benefits in a Hydroelectric Power System," Operations Research, INFORMS, vol. 29(4), pages 763-786, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bosman, M.G.C. & Bakker, V. & Molderink, A. & Hurink, J.L. & Smit, G.J.M., 2012. "Planning the production of a fleet of domestic combined heat and power generators," European Journal of Operational Research, Elsevier, vol. 216(1), pages 140-151.
    2. Muche, Thomas, 2014. "Optimal operation and forecasting policy for pump storage plants in day-ahead markets," Applied Energy, Elsevier, vol. 113(C), pages 1089-1099.
    3. Fan, Lei & Pan, Kai & Guan, Yongpei, 2019. "A strengthened mixed-integer linear programming formulation for combined-cycle units," European Journal of Operational Research, Elsevier, vol. 275(3), pages 865-881.
    4. Wim Ackooij & Jérôme Malick, 2016. "Decomposition algorithm for large-scale two-stage unit-commitment," Annals of Operations Research, Springer, vol. 238(1), pages 587-613, March.
    5. Eduardo Faria & Stein-Erik Fleten, 2011. "Day-ahead market bidding for a Nordic hydropower producer: taking the Elbas market into account," Computational Management Science, Springer, vol. 8(1), pages 75-101, April.
    6. Niu, Shilei & Insley, Margaret, 2013. "On the economics of ramping rate restrictions at hydro power plants: Balancing profitability and environmental costs," Energy Economics, Elsevier, vol. 39(C), pages 39-52.
    7. Matt Thompson & Matt Davison & Henning Rasmussen, 2004. "Valuation and Optimal Operation of Electric Power Plants in Competitive Markets," Operations Research, INFORMS, vol. 52(4), pages 546-562, August.
    8. Wim Ackooij, 2014. "Decomposition approaches for block-structured chance-constrained programs with application to hydro-thermal unit commitment," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 80(3), pages 227-253, December.
    9. Luca Lena Jansen & Georg Thomaßen & Georgios Antonopoulos & Ľuboš Buzna, 2022. "An Efficient Framework to Estimate the State of Charge Profiles of Hydro Units for Large-Scale Zonal and Nodal Pricing Models," Energies, MDPI, vol. 15(12), pages 1-23, June.
    10. Michael L. Polemis, 2018. "A mixed integer linear programming model to regulate the electricity sector," Letters in Spatial and Resource Sciences, Springer, vol. 11(2), pages 183-208, July.
    11. Fleten, Stein-Erik & Kristoffersen, Trine Krogh, 2007. "Stochastic programming for optimizing bidding strategies of a Nordic hydropower producer," European Journal of Operational Research, Elsevier, vol. 181(2), pages 916-928, September.
    12. Séguin, Sara & Fleten, Stein-Erik & Côté, Pascal & Pichler, Alois & Audet, Charles, 2017. "Stochastic short-term hydropower planning with inflow scenario trees," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1156-1168.
    13. Jiang, Ruiwei & Zhang, Muhong & Li, Guang & Guan, Yongpei, 2014. "Two-stage network constrained robust unit commitment problem," European Journal of Operational Research, Elsevier, vol. 234(3), pages 751-762.
    14. Yonghan Feng & Sarah Ryan, 2016. "Solution sensitivity-based scenario reduction for stochastic unit commitment," Computational Management Science, Springer, vol. 13(1), pages 29-62, January.
    15. Maria Vespucci & Francesca Maggioni & Maria Bertocchi & Mario Innorta, 2012. "A stochastic model for the daily coordination of pumped storage hydro plants and wind power plants," Annals of Operations Research, Springer, vol. 193(1), pages 91-105, March.
    16. Wim Ackooij & Jérôme Malick, 2016. "Decomposition algorithm for large-scale two-stage unit-commitment," Annals of Operations Research, Springer, vol. 238(1), pages 587-613, March.
    17. Philip J. Neame & Andrew B. Philpott & Geoffrey Pritchard, 2003. "Offer Stack Optimization in Electricity Pool Markets," Operations Research, INFORMS, vol. 51(3), pages 397-408, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dunguo Mou, 2018. "Wind Power Development and Energy Storage under China’s Electricity Market Reform—A Case Study of Fujian Province," Sustainability, MDPI, vol. 10(2), pages 1-20, January.
    2. Fleten, Stein-Erik & Kristoffersen, Trine Krogh, 2007. "Stochastic programming for optimizing bidding strategies of a Nordic hydropower producer," European Journal of Operational Research, Elsevier, vol. 181(2), pages 916-928, September.
    3. Jiang, Ruiwei & Zhang, Muhong & Li, Guang & Guan, Yongpei, 2014. "Two-stage network constrained robust unit commitment problem," European Journal of Operational Research, Elsevier, vol. 234(3), pages 751-762.
    4. Antoine Gautier & Frieda Granot, 1996. "Ripples, complements, and substitutes in generalized networks," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(1), pages 1-21, February.
    5. Dunguo Mou, 2019. "Pumped storage hydro power’s function in the electricity market under the electricity deregulation background in China – A case study of Fujian province," Energy & Environment, , vol. 30(6), pages 951-968, September.
    6. Hannes Hobbie & Constantin Dierstein & Dominik Möst & Matthew Schmidt, 2023. "Learning by Doing: Insights from Power Market Modelling in Energy Economics Courses," SN Operations Research Forum, Springer, vol. 4(2), pages 1-28, June.
    7. Frederic H. Murphy & Zhong Xian Wang, 1993. "A network reformulation of an electric utility expansion planning model," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 451-457, June.
    8. Habib Akbari-Alashti & Omid Bozorg Haddad & Miguel Mariño, 2015. "Application of Fixed Length Gene Genetic Programming (FLGGP) in Hydropower Reservoir Operation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 29(9), pages 3357-3370, July.
    9. Mavrotas, G. & Diakoulaki, D., 1998. "A branch and bound algorithm for mixed zero-one multiple objective linear programming," European Journal of Operational Research, Elsevier, vol. 107(3), pages 530-541, June.
    10. Eduardo Faria & Stein-Erik Fleten, 2011. "Day-ahead market bidding for a Nordic hydropower producer: taking the Elbas market into account," Computational Management Science, Springer, vol. 8(1), pages 75-101, April.
    11. Matt Thompson & Matt Davison & Henning Rasmussen, 2004. "Valuation and Optimal Operation of Electric Power Plants in Competitive Markets," Operations Research, INFORMS, vol. 52(4), pages 546-562, August.
    12. Anibal Azevedo & Aurelio Oliveira & Secundino Soares, 2009. "Interior point method for long-term generation scheduling of large-scale hydrothermal systems," Annals of Operations Research, Springer, vol. 169(1), pages 55-80, July.
    13. Steffen, Bjarne & Weber, Christoph, 2016. "Optimal operation of pumped-hydro storage plants with continuous time-varying power prices," European Journal of Operational Research, Elsevier, vol. 252(1), pages 308-321.
    14. Mehrdad Taghian & Iman Ahmadianfar, 2018. "Maximizing the Firm Energy Yield Preserving Total Energy Generation Via an Optimal Reservoir Operation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 32(1), pages 141-154, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:125:y:2000:i:2:p:410-424. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.