IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v123y2000i1p42-60.html
   My bibliography  Save this article

Production lot sizing in failure prone two-stage serial systems

Author

Listed:
  • Lee, S. D.
  • Rung, J. M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Lee, S. D. & Rung, J. M., 2000. "Production lot sizing in failure prone two-stage serial systems," European Journal of Operational Research, Elsevier, vol. 123(1), pages 42-60, May.
  • Handle: RePEc:eee:ejores:v:123:y:2000:i:1:p:42-60
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00089-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Leroy B. Schwarz & Linus Schrage, 1978. "Note--On Echelon Holding Costs," Management Science, INFORMS, vol. 24(8), pages 865-866, April.
    2. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
    3. Panayotis Afentakis & Bezalel Gavish, 1986. "Optimal Lot-Sizing Algorithms for Complex Product Structures," Operations Research, INFORMS, vol. 34(2), pages 237-249, April.
    4. Jensen, Paul A. & Pakath, Ramakrishnan & Wilson, James R., 1991. "Optimal buffer inventories for multistage production systems with failures," European Journal of Operational Research, Elsevier, vol. 51(3), pages 313-326, April.
    5. Hong, Yushin & Seong, Deokhyun, 1993. "The analysis of an unreliable two-machine production line with random processing times," European Journal of Operational Research, Elsevier, vol. 68(2), pages 228-235, July.
    6. Panayotis Afentakis & Bezalel Gavish & Uday Karmarkar, 1984. "Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems," Management Science, INFORMS, vol. 30(2), pages 222-239, February.
    7. Derek Atkins & Maurice Queyranne & Daning Sun, 1992. "Lot Sizing Policies for Finite Production Rate Assembly Systems," Operations Research, INFORMS, vol. 40(1), pages 126-141, February.
    8. Heavey, C. & Papadopoulos, H. T. & Browne, J., 1993. "The throughput rate of multistation unreliable production lines," European Journal of Operational Research, Elsevier, vol. 68(1), pages 69-89, July.
    9. Richard Conway & William Maxwell & John O. McClain & L. Joseph Thomas, 1988. "The Role of Work-in-Process Inventory in Serial Production Lines," Operations Research, INFORMS, vol. 36(2), pages 229-241, April.
    10. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Batching with Machine Breakdowns and Safety Stocks," Operations Research, INFORMS, vol. 40(5), pages 959-971, October.
    11. Robin O. Roundy & Daning Sun, 1994. "An Improved Algorithm for Finding Optimal Lot Sizing Policies for Finite Production Rate Assembly Systems," Operations Research, INFORMS, vol. 42(3), pages 562-565, June.
    12. Terry P. Harrison & Holly S. Lewis, 1996. "Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources," Management Science, INFORMS, vol. 42(1), pages 19-36, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Vickson, Raymond G. & Hassini, Elkafi, 2006. "Lot streaming for quality control in two-stage batch production," European Journal of Operational Research, Elsevier, vol. 170(3), pages 824-843, May.
    2. Shine-Der Lee & Chin-Ming Yang & Shu-Chuan Lan, 2016. "Economic lot sizing in a production system with random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1142-1154, April.
    3. Liu, Xuejuan & Wang, Wenbin & Peng, Rui, 2015. "An integrated production, inventory and preventive maintenance model for a multi-product production system," Reliability Engineering and System Safety, Elsevier, vol. 137(C), pages 76-86.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
    2. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    3. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    4. Mohebbi, E., 2008. "A note on a production control model for a facility with limited storage capacity in a random environment," European Journal of Operational Research, Elsevier, vol. 190(2), pages 562-570, October.
    5. Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
    6. Chen, Chin-Tai & Yuan, John, 2004. "Transient throughput analysis for a series type system of machines in terms of alternating renewal processes," European Journal of Operational Research, Elsevier, vol. 155(1), pages 178-197, May.
    7. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    8. N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
    9. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    10. Anantaram Balakrishnan & Joseph Geunes, 2000. "Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning," Manufacturing & Service Operations Management, INFORMS, vol. 2(2), pages 166-185, January.
    11. Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
    12. Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
    13. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    14. Jörg Homberger, 2008. "A Parallel Genetic Algorithm for the Multilevel Unconstrained Lot-Sizing Problem," INFORMS Journal on Computing, INFORMS, vol. 20(1), pages 124-132, February.
    15. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
    16. dos Santos-Meza, Elisangela & Oliveira dos Santos, Maristela & Nereu Arenales, Marcos, 2002. "A lot-sizing problem in an automated foundry," European Journal of Operational Research, Elsevier, vol. 139(3), pages 490-500, June.
    17. Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
    18. Dellaert, N. P. & Jeunet, J., 2003. "Randomized multi-level lot-sizing heuristics for general product structures," European Journal of Operational Research, Elsevier, vol. 148(1), pages 211-228, July.
    19. Tobias Harks & Felix G. König & Jannik Matuschke & Alexander T. Richter & Jens Schulz, 2016. "An Integrated Approach to Tactical Transportation Planning in Logistics Networks," Transportation Science, INFORMS, vol. 50(2), pages 439-460, May.
    20. Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:123:y:2000:i:1:p:42-60. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.