IDEAS home Printed from https://ideas.repec.org/r/wly/navlog/v1y1954i1p61-68.html
   My bibliography  Save this item

Optimal two‐ and three‐stage production schedules with setup times included

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Thierry Garaix & Salim Rostami & Xiaolan Xie, 2020. "Daily outpatient chemotherapy appointment scheduling with random deferrals," Flexible Services and Manufacturing Journal, Springer, vol. 32(1), pages 129-153, March.
  2. Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2020. "Coupled task scheduling with exact delays: Literature review and models," European Journal of Operational Research, Elsevier, vol. 282(1), pages 19-39.
  3. Li, Guo & Li, Na & Sambandam, Narayanasamy & Sethi, Suresh P. & Zhang, Faping, 2018. "Flow shop scheduling with jobs arriving at different times," International Journal of Production Economics, Elsevier, vol. 206(C), pages 250-260.
  4. Chen, Xin & Miao, Qian & Lin, Bertrand M.T. & Sterna, Malgorzata & Blazewicz, Jacek, 2022. "Two-machine flow shop scheduling with a common due date to maximize total early work," European Journal of Operational Research, Elsevier, vol. 300(2), pages 504-511.
  5. Mosheiov, Gur & Sarig, Assaf & Strusevich, Vitaly A & Mosheiff, Jonathan, 2018. "Two-machine flow shop and open shop scheduling problems with a single maintenance window," European Journal of Operational Research, Elsevier, vol. 271(2), pages 388-400.
  6. Asoo J. Vakharia & Yih‐Long Chang, 1990. "A simulated annealing approach to scheduling a manufacturing cell," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(4), pages 559-577, August.
  7. Nadjat Meziani & Ammar Oulamara & Mourad Boudhar, 2019. "Two-machine flowshop scheduling problem with coupled-operations," Annals of Operations Research, Springer, vol. 275(2), pages 511-530, April.
  8. Wenchang Luo & Lin Chen & Guochuan Zhang, 2012. "Approximation schemes for two-machine flow shop scheduling with two agents," Journal of Combinatorial Optimization, Springer, vol. 24(3), pages 229-239, October.
  9. Guo-Sheng Liu & Jin-Jin Li & Ying-Si Tang, 2018. "Minimizing Total Idle Energy Consumption in the Permutation Flow Shop Scheduling Problem," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 35(06), pages 1-19, December.
  10. Shabtay, Dvir & Gilenson, Miri, 2023. "A state-of-the-art survey on multi-scenario scheduling," European Journal of Operational Research, Elsevier, vol. 310(1), pages 3-23.
  11. Raja Awais Liaqait & Shermeen Hamid & Salman Sagheer Warsi & Azfar Khalid, 2021. "A Critical Analysis of Job Shop Scheduling in Context of Industry 4.0," Sustainability, MDPI, vol. 13(14), pages 1-19, July.
  12. Wlodzimierz Szwarc & Jatinder N. D. Gupta, 1987. "A flow‐shop problem with sequence‐dependent additive setup times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(5), pages 619-627, October.
  13. Li, Wei & Nault, Barrie R. & Ye, Honghan, 2019. "Trade-off balancing in scheduling for flow shop production and perioperative processes," European Journal of Operational Research, Elsevier, vol. 273(3), pages 817-830.
  14. Kang, Liujiang & Meng, Qiang & Tan, Kok Choon, 2020. "Tugboat scheduling under ship arrival and tugging process time uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 144(C).
  15. Miri Gilenson & Dvir Shabtay & Liron Yedidsion & Rohit Malshe, 2021. "Scheduling in multi-scenario environment with an agreeable condition on job processing times," Annals of Operations Research, Springer, vol. 307(1), pages 153-173, December.
  16. Rhonda Righter, 1997. "A generalized Johnson's rule for stochastic assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(2), pages 211-220, March.
  17. Jia, Beizhen & Tierney, Kevin & Reinhardt, Line Blander & Pahl, Julia, 2022. "Optimal dual cycling operations in roll-on roll-off terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 159(C).
  18. A Corominas & R Pastor, 2011. "Designing greedy algorithms for the flow-shop problem by means of Empirically Adjusted Greedy Heuristics (EAGH)," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1704-1710, September.
  19. Liqi Zhang & Lingfa Lu & Shisheng Li, 2016. "New results on two-machine flow-shop scheduling with rejection," Journal of Combinatorial Optimization, Springer, vol. 31(4), pages 1493-1504, May.
  20. Jianming Dong & Yong Chen & An Zhang & Qifan Yang, 2013. "A new three-machine shop scheduling: complexity and approximation algorithm," Journal of Combinatorial Optimization, Springer, vol. 26(4), pages 799-810, November.
  21. Bock, Felix & Bruhn, Henning, 2021. "Case study on scheduling cyclic conveyor belts," Omega, Elsevier, vol. 102(C).
  22. Yin, Yunqiang & Luo, Zunhao & Wang, Dujuan & Cheng, T.C.E., 2023. "Wasserstein distance‐based distributionally robust parallel‐machine scheduling," Omega, Elsevier, vol. 120(C).
  23. Yuan Yuan & Yan Lan & Ning Ding & Xin Han, 2022. "A PTAS for non-resumable open shop scheduling with an availability constraint," Journal of Combinatorial Optimization, Springer, vol. 43(2), pages 350-362, March.
  24. A.A. Gladky & Y.M. Shafransky & V.A. Strusevich, 2004. "Flow Shop Scheduling Problems Under Machine–Dependent Precedence Constraints," Journal of Combinatorial Optimization, Springer, vol. 8(1), pages 13-28, March.
  25. Abdennour Azerine & Mourad Boudhar & Djamal Rebaine, 2022. "A two-machine no-wait flow shop problem with two competing agents," Journal of Combinatorial Optimization, Springer, vol. 43(1), pages 168-199, January.
  26. S.S. Panwalkar & Christos Koulamas, 2015. "Scheduling research and the first decade of NRLQ: A historical perspective," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(4), pages 335-344, June.
  27. Brammer, Janis & Lutz, Bernhard & Neumann, Dirk, 2022. "Permutation flow shop scheduling with multiple lines and demand plans using reinforcement learning," European Journal of Operational Research, Elsevier, vol. 299(1), pages 75-86.
  28. Dar-Li Yang & Wen-Hung Kuo, 2019. "Minimizing Makespan in A Two-Machine Flowshop Problem with Processing Time Linearly Dependent on Job Waiting Time," Sustainability, MDPI, vol. 11(24), pages 1-18, December.
  29. Lee, Kangbok & Zheng, Feifeng & Pinedo, Michael L., 2019. "Online scheduling of ordered flow shops," European Journal of Operational Research, Elsevier, vol. 272(1), pages 50-60.
  30. Madiha Harrabi & Olfa Belkahla Driss & Khaled Ghedira, 2021. "A hybrid evolutionary approach to job-shop scheduling with generic time lags," Journal of Scheduling, Springer, vol. 24(3), pages 329-346, June.
  31. Baruch Mor & Gur Mosheiov, 2021. "Minmax due-date assignment on a two-machine flowshop," Annals of Operations Research, Springer, vol. 305(1), pages 191-209, October.
  32. Wu, Xueqi & Che, Ada, 2019. "A memetic differential evolution algorithm for energy-efficient parallel machine scheduling," Omega, Elsevier, vol. 82(C), pages 155-165.
  33. Yu, Tae-Sun & Han, Jun-Hee, 2021. "Scheduling proportionate flow shops with preventive machine maintenance," International Journal of Production Economics, Elsevier, vol. 231(C).
  34. S. S. Panwalkar & Christos Koulamas, 2019. "The evolution of schematic representations of flow shop scheduling problems," Journal of Scheduling, Springer, vol. 22(4), pages 379-391, August.
  35. Vincent T’kindt & Federico Della Croce & Mathieu Liedloff, 2022. "Moderate exponential-time algorithms for scheduling problems," 4OR, Springer, vol. 20(4), pages 533-566, December.
  36. Said Aqil & Karam Allali, 2021. "On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time," Annals of Operations Research, Springer, vol. 296(1), pages 615-637, January.
  37. Yong Chen & Yinhui Cai & Longcheng Liu & Guangting Chen & Randy Goebel & Guohui Lin & Bing Su & An Zhang, 2022. "Path cover with minimum nontrivial paths and its application in two-machine flow-shop scheduling with a conflict graph," Journal of Combinatorial Optimization, Springer, vol. 43(3), pages 571-588, April.
  38. Marcelo Seido Nagano & Adriano Seiko Komesu & Hugo Hissashi Miyata, 2019. "An evolutionary clustering search for the total tardiness blocking flow shop problem," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1843-1857, April.
  39. Jan Gmys, 2022. "Exactly Solving Hard Permutation Flowshop Scheduling Problems on Peta-Scale GPU-Accelerated Supercomputers," INFORMS Journal on Computing, INFORMS, vol. 34(5), pages 2502-2522, September.
  40. Fernando Luis Rossi & Marcelo Seido Nagano, 2022. "Beam search-based heuristics for the mixed no-idle flowshop with total flowtime criterion," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1311-1346, December.
  41. Stephan Kreipl & Jörg Dickersbach, 2008. "Scheduling coordination problems in supply chain planning," Annals of Operations Research, Springer, vol. 161(1), pages 103-122, July.
  42. Rossit, Daniel A. & Vásquez, Óscar C. & Tohmé, Fernando & Frutos, Mariano & Safe, Martín D., 2021. "A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 289(3), pages 841-854.
  43. Alexander Kononov & Julia Memar & Yakov Zinder, 2022. "On a borderline between the NP-hard and polynomial-time solvable cases of the flow shop with job-dependent storage requirements," Journal of Global Optimization, Springer, vol. 83(3), pages 445-456, July.
  44. S. Knust & N. V. Shakhlevich & S. Waldherr & C. Weiß, 2019. "Shop scheduling problems with pliable jobs," Journal of Scheduling, Springer, vol. 22(6), pages 635-661, December.
  45. Vineet Jain & Tilak Raj, 2018. "An adaptive neuro-fuzzy inference system for makespan estimation of flexible manufacturing system assembly shop: a case study," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1302-1314, December.
  46. Ruiz, Rubén & Pan, Quan-Ke & Naderi, Bahman, 2019. "Iterated Greedy methods for the distributed permutation flowshop scheduling problem," Omega, Elsevier, vol. 83(C), pages 213-222.
  47. Mohamed Amine Mkadem & Aziz Moukrim & Mehdi Serairi, 2021. "Exact method for the two-machine flow-shop problem with time delays," Annals of Operations Research, Springer, vol. 298(1), pages 375-406, March.
  48. Dawei Li & Xiwen Lu, 2020. "Two-machine flow shop scheduling with an operator non-availability period to minimize makespan," Journal of Combinatorial Optimization, Springer, vol. 39(4), pages 1060-1078, May.
  49. Alfaro-Fernández, Pedro & Ruiz, Rubén & Pagnozzi, Federico & Stützle, Thomas, 2020. "Automatic Algorithm Design for Hybrid Flowshop Scheduling Problems," European Journal of Operational Research, Elsevier, vol. 282(3), pages 835-845.
  50. Bo Liu & Ling Wang & Ying Liu & Shouyang Wang, 2011. "A unified framework for population-based metaheuristics," Annals of Operations Research, Springer, vol. 186(1), pages 231-262, June.
  51. Danny Hermelin & Dvir Shabtay & Chen Zelig & Michael Pinedo, 2022. "A general scheme for solving a large set of scheduling problems with rejection in FPT time," Journal of Scheduling, Springer, vol. 25(2), pages 229-255, April.
  52. Goodchild, Anne V. & Daganzo, Carlos, 2005. "Performance Comparison of Crane Double CyclingStrategies," Institute of Transportation Studies, Research Reports, Working Papers, Proceedings qt65s0d62v, Institute of Transportation Studies, UC Berkeley.
  53. Sterna, Małgorzata, 2021. "Late and early work scheduling: A survey," Omega, Elsevier, vol. 104(C).
  54. Arshad Ali & Yuvraj Gajpal & Tarek Y. Elmekkawy, 2021. "Distributed permutation flowshop scheduling problem with total completion time objective," OPSEARCH, Springer;Operational Research Society of India, vol. 58(2), pages 425-447, June.
  55. Yakov Zinder & Alexandr Kononov & Joey Fung, 2021. "A 5-parameter complexity classification of the two-stage flow shop scheduling problem with job dependent storage requirements," Journal of Combinatorial Optimization, Springer, vol. 42(2), pages 276-309, August.
  56. Christos Koulamas, 1996. "A total tardiness problem with preprocessing included," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(5), pages 721-735, August.
  57. Vincent T’kindt & Karima Bouibede-Hocine & Carl Esswein, 2007. "Counting and enumeration complexity with application to multicriteria scheduling," Annals of Operations Research, Springer, vol. 153(1), pages 215-234, September.
  58. Peng-Yeng Yin & Hsin-Min Chen & Yi-Lung Cheng & Ying-Chieh Wei & Ya-Lin Huang & Rong-Fuh Day, 2021. "Minimizing the Makespan in Flowshop Scheduling for Sustainable Rubber Circular Manufacturing," Sustainability, MDPI, vol. 13(5), pages 1-18, February.
  59. Kameng Nip & Zhenbo Wang & Fabrice Talla Nobibon & Roel Leus, 2015. "A combination of flow shop scheduling and the shortest path problem," Journal of Combinatorial Optimization, Springer, vol. 29(1), pages 36-52, January.
  60. Fernandez-Viagas, Victor & Talens, Carla & Framinan, Jose M., 2022. "Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation," European Journal of Operational Research, Elsevier, vol. 299(3), pages 869-882.
  61. Yaliang Wang & Xinyu Fan & Chendi Ni & Kanghong Gao & Shousong Jin, 2023. "Collaborative optimization of workshop layout and scheduling," Journal of Scheduling, Springer, vol. 26(1), pages 43-59, February.
  62. Joanna Berlińska, 2020. "Heuristics for scheduling data gathering with limited base station memory," Annals of Operations Research, Springer, vol. 285(1), pages 149-159, February.
  63. Jian Zhang & Guofu Ding & Yisheng Zou & Shengfeng Qin & Jianlin Fu, 2019. "Review of job shop scheduling research and its new perspectives under Industry 4.0," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1809-1830, April.
  64. Kim, T.Y., 2018. "Improving warehouse responsiveness by job priority management," Econometric Institute Research Papers EI2018-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  65. C.T. Ng & Mikhail Y. Kovalyov, 2004. "An FPTAS for scheduling a two‐machine flowshop with one unavailability interval," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 307-315, April.
  66. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
  67. Yakov Shafransky & Viktor Shinkarevich, 2020. "On the complexity of constructing a minmax regret solution for the two-machine flow shop problem under the interval uncertainty," Journal of Scheduling, Springer, vol. 23(6), pages 745-749, December.
  68. Golpîra, Hêriş, 2020. "Smart Energy-Aware Manufacturing Plant Scheduling under Uncertainty: A Risk-Based Multi-Objective Robust Optimization Approach," Energy, Elsevier, vol. 209(C).
  69. Levorato, Mario & Figueiredo, Rosa & Frota, Yuri, 2022. "Exact solutions for the two-machine robust flow shop with budgeted uncertainty," European Journal of Operational Research, Elsevier, vol. 300(1), pages 46-57.
  70. Alexander Grigoriev & Martijn Holthuijsen & Joris van de Klundert, 2005. "Basic scheduling problems with raw material constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 527-535, September.
  71. Minghui Zhang & Yan Lan & Xin Han, 2020. "Approximation algorithms for two-stage flexible flow shop scheduling," Journal of Combinatorial Optimization, Springer, vol. 39(1), pages 1-14, January.
  72. Karimi-Mamaghan, Maryam & Mohammadi, Mehrdad & Pasdeloup, Bastien & Meyer, Patrick, 2023. "Learning to select operators in meta-heuristics: An integration of Q-learning into the iterated greedy algorithm for the permutation flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 304(3), pages 1296-1330.
  73. Abdelhamid Boudjelida, 2019. "On the robustness of joint production and maintenance scheduling in presence of uncertainties," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1515-1530, April.
  74. Xiao, Yiyong & Zhang, Siyue & Yang, Pei & You, Meng & Huang, Jiaoying, 2019. "A two-stage flow-shop scheme for the multi-satellite observation and data-downlink scheduling problem considering weather uncertainties," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 263-275.
  75. Yen-Shing Tsai & Bertrand Lin, 2016. "Flow shop non-idle scheduling and resource-constrained scheduling," Annals of Operations Research, Springer, vol. 238(1), pages 577-585, March.
  76. Christoph Hertrich & Christian Weiß & Heiner Ackermann & Sandy Heydrich & Sven O. Krumke, 2020. "Scheduling a proportionate flow shop of batching machines," Journal of Scheduling, Springer, vol. 23(5), pages 575-593, October.
  77. Martín Ravetti & Carlos Riveros & Alexandre Mendes & Mauricio Resende & Panos Pardalos, 2012. "Parallel hybrid heuristics for the permutation flow shop problem," Annals of Operations Research, Springer, vol. 199(1), pages 269-284, October.
  78. A. G. Leeftink & R. J. Boucherie & E. W. Hans & M. A. M. Verdaasdonk & I. M. H. Vliegen & P. J. Diest, 2018. "Batch scheduling in the histopathology laboratory," Flexible Services and Manufacturing Journal, Springer, vol. 30(1), pages 171-197, June.
  79. S.S. Panwalkar & Milton L. Smith & Christos Koulamas, 2013. "Review of the ordered and proportionate flow shop scheduling research," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(1), pages 46-55, February.
  80. Federico Della Croce & Andrea Grosso & Fabio Salassa, 2021. "Minimizing total completion time in the two-machine no-idle no-wait flow shop problem," Journal of Heuristics, Springer, vol. 27(1), pages 159-173, April.
  81. F. Hwang & M. Kovalyov & B. Lin, 2014. "Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence," Annals of Operations Research, Springer, vol. 217(1), pages 263-279, June.
  82. Wu, Xueqi & Che, Ada, 2020. "Energy-efficient no-wait permutation flow shop scheduling by adaptive multi-objective variable neighborhood search," Omega, Elsevier, vol. 94(C).
  83. Byung-Cheon Choi & Joseph Y.-T. Leung & Michael L. Pinedo, 2011. "Minimizing makespan in an ordered flow shop with machine-dependent processing times," Journal of Combinatorial Optimization, Springer, vol. 22(4), pages 797-818, November.
  84. J.-C. Billaut & F. Della Croce & F. Salassa & V. T’kindt, 2019. "No-idle, no-wait: when shop scheduling meets dominoes, Eulerian paths and Hamiltonian paths," Journal of Scheduling, Springer, vol. 22(1), pages 59-68, February.
  85. Javad Seif & Mohammad Dehghanimohammadabadi & Andrew Junfang Yu, 2020. "Integrated preventive maintenance and flow shop scheduling under uncertainty," Flexible Services and Manufacturing Journal, Springer, vol. 32(4), pages 852-887, December.
  86. Gmys, Jan & Mezmaz, Mohand & Melab, Nouredine & Tuyttens, Daniel, 2020. "A computationally efficient Branch-and-Bound algorithm for the permutation flow-shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 284(3), pages 814-833.
  87. Yadong Wang & Baoqiang Fan & Jingang Zhai & Wei Xiong, 2019. "Two-machine flowshop scheduling in a physical examination center," Journal of Combinatorial Optimization, Springer, vol. 37(1), pages 363-374, January.
  88. Feifeng Zheng & Yaxin Pang & Ming Liu & Yinfeng Xu, 2020. "Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles," Journal of Combinatorial Optimization, Springer, vol. 39(3), pages 708-724, April.
  89. Elisa Negri & Vibhor Pandhare & Laura Cattaneo & Jaskaran Singh & Marco Macchi & Jay Lee, 2021. "Field-synchronized Digital Twin framework for production scheduling with uncertainty," Journal of Intelligent Manufacturing, Springer, vol. 32(4), pages 1207-1228, April.
  90. Deepak Gupta & Sonia Goel & Neeraj Mangla, 2022. "Optimization of production scheduling in two stage Flow Shop Scheduling problem with m equipotential machines at first stage," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(3), pages 1162-1169, June.
  91. Zongxu Mu & Minming Li, 2015. "DVS scheduling in a line or a star network of processors," Journal of Combinatorial Optimization, Springer, vol. 29(1), pages 16-35, January.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.