IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v325y2025i1p1-19.html
   My bibliography  Save this article

Transportation and delivery in flow-shop scheduling problems: A systematic review

Author

Listed:
  • Fernandez-Viagas, Victor

Abstract

This paper presents a literature review of flow-shop scheduling problems with transportation or delivery of jobs. Flow-shop scheduling problems are one of the most widely studied optimisation problems in the literature on Operations Research. Although these have traditionally been studied assuming negligible or constant transport times, this does not correspond to real manufacturing scenarios in the industry. In fact, the extensive automation and synchronisation demanded by Industry 4.0 may well be a driving factor in the growing interest in the literature on flow-shop scheduling problems with transport constraints. Despite this interest, the literature is disjointed, and many terms have been used interchangeably. This review aims to organise the literature on the topic and propose a new notation for these problems. This contribution is expected to help structure advancements in the field, classifying them by problem type. Furthermore, a detailed study is carried out on the complexity and relationship between different variants. This provides a representation of the advances discovered in the literature while also demonstrating new theoretical results, before finally identifying the most promising research directions.

Suggested Citation

  • Fernandez-Viagas, Victor, 2025. "Transportation and delivery in flow-shop scheduling problems: A systematic review," European Journal of Operational Research, Elsevier, vol. 325(1), pages 1-19.
  • Handle: RePEc:eee:ejores:v:325:y:2025:i:1:p:1-19
    DOI: 10.1016/j.ejor.2024.11.034
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221724009032
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2024.11.034?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    References listed on IDEAS

    as
    1. En-da Jiang & Ling Wang, 2019. "An improved multi-objective evolutionary algorithm based on decomposition for energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1756-1771, March.
    2. Pessoa, Luciana S. & Andrade, Carlos E., 2018. "Heuristics for a flowshop scheduling problem with stepwise job objective function," European Journal of Operational Research, Elsevier, vol. 266(3), pages 950-962.
    3. Kim, Yeong-Dae & Lim, Hyeong-Gyu & Park, Moon-Won, 1996. "Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process," European Journal of Operational Research, Elsevier, vol. 91(1), pages 124-143, May.
    4. Li, Mingxing & Huang, George Q., 2021. "Production-intralogistics synchronization of industry 4.0 flexible assembly lines under graduation intelligent manufacturing system," International Journal of Production Economics, Elsevier, vol. 241(C).
    5. Neufeld, Janis S. & Schulz, Sven & Buscher, Udo, 2023. "A systematic review of multi-objective hybrid flow shop scheduling," European Journal of Operational Research, Elsevier, vol. 309(1), pages 1-23.
    6. Jianming Dong & Xueshi Wang & Jueliang Hu & Guohui Lin, 2016. "An improved two-machine flowshop scheduling with intermediate transportation," Journal of Combinatorial Optimization, Springer, vol. 31(3), pages 1316-1334, April.
    7. Hurink, Johann & Knust, Sigrid, 2005. "Tabu search algorithms for job-shop problems with a single transport robot," European Journal of Operational Research, Elsevier, vol. 162(1), pages 99-111, April.
    8. Victor Fernandez-Viagas & Luis Sanchez-Mediano & Alvaro Angulo-Cortes & David Gomez-Medina & Jose Manuel Molina-Pariente, 2022. "The Permutation Flow Shop Scheduling Problem with Human Resources: MILP Models, Decoding Procedures, NEH-Based Heuristics, and an Iterated Greedy Algorithm," Mathematics, MDPI, vol. 10(19), pages 1-32, September.
    9. Berghman, Lotte & Kergosien, Yannick & Billaut, Jean-Charles, 2023. "A review on integrated scheduling and outbound vehicle routing problems," European Journal of Operational Research, Elsevier, vol. 311(1), pages 1-23.
    10. G. M. Komaki & Shaya Sheikh & Behnam Malakooti, 2019. "Flow shop scheduling problems with assembly operations: a review and new trends," International Journal of Production Research, Taylor & Francis Journals, vol. 57(10), pages 2926-2955, May.
    11. Amir Ahmadi-Javid & Pedram Hooshangi-Tabrizi, 2015. "A mathematical formulation and anarchic society optimisation algorithms for integrated scheduling of processing and transportation operations in a flow-shop environment," International Journal of Production Research, Taylor & Francis Journals, vol. 53(19), pages 5988-6006, October.
    12. Nicholas G. Hall & 'Maseka Lesaoana & Chris N. Potts, 2001. "Scheduling with Fixed Delivery Dates," Operations Research, INFORMS, vol. 49(1), pages 134-144, February.
    13. Dev, Navin K. & Shankar, Ravi & Swami, Sanjeev, 2020. "Diffusion of green products in industry 4.0: Reverse logistics issues during design of inventory and production planning system," International Journal of Production Economics, Elsevier, vol. 223(C).
    14. Wang, Yuhang & Han, Yuyan & Wang, Yuting & Tasgetiren, M. Fatih & Li, Junqing & Gao, Kaizhou, 2023. "Intelligent optimization under the makespan constraint: Rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem," European Journal of Operational Research, Elsevier, vol. 311(3), pages 816-832.
    15. Ramesh Kumar & L. Ganapathy & Ravindra Gokhale & Manoj Kumar Tiwari, 2020. "Quantitative approaches for the integration of production and distribution planning in the supply chain: a systematic literature review," International Journal of Production Research, Taylor & Francis Journals, vol. 58(11), pages 3527-3553, June.
    16. Rossit, Daniel Alejandro & Tohmé, Fernando & Frutos, Mariano, 2018. "The Non-Permutation Flow-Shop scheduling problem: A literature review," Omega, Elsevier, vol. 77(C), pages 143-153.
    17. Harendra Kumar & Pankaj Kumar & Manisha Sharma, 2019. "A genetic algorithm for a flow shop scheduling problem with breakdown interval, transportation time and weights of jobs," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 35(4), pages 470-483.
    18. Alexander Ageev, 2020. "Approximating the 2-machine flow shop problem with exact delays taking two values," Journal of Global Optimization, Springer, vol. 76(3), pages 491-497, March.
    19. Tharma Ganesharajah & Nicholas Hall & Chelliah Sriskandarajah, 1998. "Design and operational issues in AGV-served manufacturing systems," Annals of Operations Research, Springer, vol. 76(0), pages 109-154, January.
    20. Lacomme, Philippe & Larabi, Mohand & Tchernev, Nikolay, 2013. "Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles," International Journal of Production Economics, Elsevier, vol. 143(1), pages 24-34.
    21. Yuan, Jinjiang & Soukhal, Ameur & Chen, Youjun & Lu, Lingfa, 2007. "A note on the complexity of flow shop scheduling with transportation constraints," European Journal of Operational Research, Elsevier, vol. 178(3), pages 918-925, May.
    22. Taillard, E., 1990. "Some efficient heuristic methods for the flow shop sequencing problem," European Journal of Operational Research, Elsevier, vol. 47(1), pages 65-74, July.
    23. Paul, Henrik J. & Bierwirth, Christian & Kopfer, Herbert, 2007. "A heuristic scheduling procedure for multi-item hoist production lines," International Journal of Production Economics, Elsevier, vol. 105(1), pages 54-69, January.
    24. Liou, Cheng-Dar & Hsieh, Yi-Chih, 2015. "A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 258-267.
    25. Soukhal, A. & Oulamara, A. & Martineau, P., 2005. "Complexity of flow shop scheduling problems with transportation constraints," European Journal of Operational Research, Elsevier, vol. 161(1), pages 32-41, February.
    26. E. Dhouib & J. Teghem & T. Loukil, 2018. "Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic," Annals of Operations Research, Springer, vol. 267(1), pages 101-134, August.
    27. Chevroton, Hugo & Kergosien, Yannick & Berghman, Lotte & Billaut, Jean-Charles, 2021. "Solving an integrated scheduling and routing problem with inventory, routing and penalty costs," European Journal of Operational Research, Elsevier, vol. 294(2), pages 571-589.
    28. Fernandez-Viagas, Victor & Talens, Carla & Framinan, Jose M., 2022. "Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation," European Journal of Operational Research, Elsevier, vol. 299(3), pages 869-882.
    29. M Haouari & T Ladhari, 2000. "Minimising maximum lateness in a two-machine flowshop," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(9), pages 1100-1106, September.
    30. Philip Kaminsky, 2003. "The effectiveness of the longest delivery time rule for the flow shop delivery time problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(3), pages 257-272, April.
    31. S. Porselvi & A.N. Balaji & N. Jawahar, 2018. "Artificial immune system and particle swarm optimisation algorithms for an integrated production and distribution scheduling problem," International Journal of Logistics Systems and Management, Inderscience Enterprises Ltd, vol. 30(1), pages 31-68.
    32. S. M. Johnson, 1954. "Optimal two‐ and three‐stage production schedules with setup times included," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 1(1), pages 61-68, March.
    33. Wlodzimierz Szwarc, 1983. "Flow Shop Problems with Time Lags," Management Science, INFORMS, vol. 29(4), pages 477-481, April.
    34. Fernandez-Viagas, Victor & Molina-Pariente, Jose M. & Framinan, Jose M., 2020. "Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 282(3), pages 858-872.
    35. Riezebos, J. & Gaalman, G. J. C., 1998. "Time lag size in multiple operations flow shop scheduling heuristics," European Journal of Operational Research, Elsevier, vol. 105(1), pages 72-90, February.
    36. Jinwei Gu & Manzhan Gu & Xingsheng Gu, 2015. "A Mutualism Quantum Genetic Algorithm to Optimize the Flow Shop Scheduling with Pickup and Delivery Considerations," Mathematical Problems in Engineering, Hindawi, vol. 2015, pages 1-17, March.
    37. Peter Brucker & Sigrid Knust & T.C. Cheng & Natalia Shakhlevich, 2004. "Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delays," Annals of Operations Research, Springer, vol. 129(1), pages 81-106, July.
    38. Shuaipeng Yuan & Tieke Li & Bailin Wang, 2021. "A discrete differential evolution algorithm for flow shop group scheduling problem with sequence-dependent setup and transportation times," Journal of Intelligent Manufacturing, Springer, vol. 32(2), pages 427-439, February.
    39. Nawaz, Muhammad & Enscore Jr, E Emory & Ham, Inyong, 1983. "A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem," Omega, Elsevier, vol. 11(1), pages 91-95.
    40. Mohamed Amine Mkadem & Aziz Moukrim & Mehdi Serairi, 2021. "Exact method for the two-machine flow-shop problem with time delays," Annals of Operations Research, Springer, vol. 298(1), pages 375-406, March.
    41. L. G. Mitten, 1959. "Sequencing n Jobs on Two Machines with Arbitrary Time Lags," Management Science, INFORMS, vol. 5(3), pages 293-298, April.
    42. Fondrevelle, J. & Oulamara, A. & Portmann, M.-C., 2008. "Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times," International Journal of Production Economics, Elsevier, vol. 112(1), pages 168-176, March.
    43. Yu, Wei & Liu, Zhaohui & Wang, Leiyang & Fan, Tijun, 2011. "Routing open shop and flow shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 213(1), pages 24-36, August.
    44. Xu Xin & Qiangqiang Jiang & Cui Li & Sihang Li & Kang Chen, 2023. "Permutation flow shop energy-efficient scheduling with a position-based learning effect," International Journal of Production Research, Taylor & Francis Journals, vol. 61(2), pages 382-409, January.
    45. Igor Averbakh & Oded Berman, 1999. "A Simple Heuristic for m-Machine Flow-Shop and its Applications in Routing-Scheduling Problems," Operations Research, INFORMS, vol. 47(1), pages 165-170, February.
    46. Igor Averbakh & Oded Berman, 1996. "Routing Two-Machine Flowshop Problems on Networks with Special Structure," Transportation Science, INFORMS, vol. 30(4), pages 303-314, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
    2. Fernandez-Viagas, Victor & Talens, Carla & Prata, Bruno de Athayde, 2025. "A speed-up procedure and new heuristics for the classical job shop scheduling problem: A computational evaluation," European Journal of Operational Research, Elsevier, vol. 322(3), pages 783-794.
    3. Brammer, Janis & Lutz, Bernhard & Neumann, Dirk, 2022. "Permutation flow shop scheduling with multiple lines and demand plans using reinforcement learning," European Journal of Operational Research, Elsevier, vol. 299(1), pages 75-86.
    4. Madiha Harrabi & Olfa Belkahla Driss & Khaled Ghedira, 2021. "A hybrid evolutionary approach to job-shop scheduling with generic time lags," Journal of Scheduling, Springer, vol. 24(3), pages 329-346, June.
    5. Fernandez-Viagas, Victor & Talens, Carla & Framinan, Jose M., 2022. "Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation," European Journal of Operational Research, Elsevier, vol. 299(3), pages 869-882.
    6. Berterottière, Lucas & Dauzère-Pérès, Stéphane & Yugma, Claude, 2024. "Flexible job-shop scheduling with transportation resources," European Journal of Operational Research, Elsevier, vol. 312(3), pages 890-909.
    7. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    8. Karimi-Mamaghan, Maryam & Mohammadi, Mehrdad & Pasdeloup, Bastien & Meyer, Patrick, 2023. "Learning to select operators in meta-heuristics: An integration of Q-learning into the iterated greedy algorithm for the permutation flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 304(3), pages 1296-1330.
    9. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    10. Vineet Jain & Tilak Raj, 2018. "An adaptive neuro-fuzzy inference system for makespan estimation of flexible manufacturing system assembly shop: a case study," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1302-1314, December.
    11. Li, Wei & Nault, Barrie R. & Ye, Honghan, 2019. "Trade-off balancing in scheduling for flow shop production and perioperative processes," European Journal of Operational Research, Elsevier, vol. 273(3), pages 817-830.
    12. Libralesso, Luc & Focke, Pablo Andres & Secardin, Aurélien & Jost, Vincent, 2022. "Iterative beam search algorithms for the permutation flowshop," European Journal of Operational Research, Elsevier, vol. 301(1), pages 217-234.
    13. J M Framinan & J N D Gupta & R Leisten, 2004. "A review and classification of heuristics for permutation flow-shop scheduling with makespan objective," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(12), pages 1243-1255, December.
    14. Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2020. "Coupled task scheduling with exact delays: Literature review and models," European Journal of Operational Research, Elsevier, vol. 282(1), pages 19-39.
    15. Bruno de Athayde Prata & Marcelo Seido Nagano & Nádia Junqueira Martarelli Fróes & Levi Ribeiro de Abreu, 2023. "The Seeds of the NEH Algorithm: An Overview Using Bibliometric Analysis," SN Operations Research Forum, Springer, vol. 4(4), pages 1-22, December.
    16. Mohamed Amine Mkadem & Aziz Moukrim & Mehdi Serairi, 2021. "Exact method for the two-machine flow-shop problem with time delays," Annals of Operations Research, Springer, vol. 298(1), pages 375-406, March.
    17. Said Aqil & Karam Allali, 2021. "On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time," Annals of Operations Research, Springer, vol. 296(1), pages 615-637, January.
    18. Martín Ravetti & Carlos Riveros & Alexandre Mendes & Mauricio Resende & Panos Pardalos, 2012. "Parallel hybrid heuristics for the permutation flow shop problem," Annals of Operations Research, Springer, vol. 199(1), pages 269-284, October.
    19. Wang, Yuhang & Han, Yuyan & Wang, Yuting & Tasgetiren, M. Fatih & Li, Junqing & Gao, Kaizhou, 2023. "Intelligent optimization under the makespan constraint: Rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem," European Journal of Operational Research, Elsevier, vol. 311(3), pages 816-832.
    20. Han, Yuyan & Wang, Yuting & Pan, Quan-ke & Wang, Ling & Tasgetiren, M. Fatih, 2024. "Accelerated evaluation of blocking flowshop scheduling with total flow time criteria using a generalized critical machine-based approach," European Journal of Operational Research, Elsevier, vol. 318(2), pages 424-441.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;
    ;
    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:325:y:2025:i:1:p:1-19. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.