IDEAS home Printed from https://ideas.repec.org/a/spr/jcomop/v31y2016i3d10.1007_s10878-014-9825-y.html
   My bibliography  Save this article

An improved two-machine flowshop scheduling with intermediate transportation

Author

Listed:
  • Jianming Dong

    (Zhejiang Sci-Tech University)

  • Xueshi Wang

    (Zhejiang Sci-Tech University)

  • Jueliang Hu

    (Zhejiang Sci-Tech University)

  • Guohui Lin

    (Zhejiang Sci-Tech University
    University of Alberta)

Abstract

A two-machine flowshop scheduling problem with intermediate transportation is investigated in this paper, where jobs of varying sizes finished on the first machine need to be transported to the other machine for further processing. One service vehicle of a limited capacity is used for transportation between the two machines. The problem objective is to minimize the makespan, that is the finishing time of the last job on the second machine. Using a better bin-packing algorithm and balancing between two schedules, we present an $$\frac{11}{5}$$ 11 5 -approximation algorithm for the problem, which improves the previously best $$\frac{7}{3}$$ 7 3 -approximation algorithm by Gong and Tang.

Suggested Citation

  • Jianming Dong & Xueshi Wang & Jueliang Hu & Guohui Lin, 2016. "An improved two-machine flowshop scheduling with intermediate transportation," Journal of Combinatorial Optimization, Springer, vol. 31(3), pages 1316-1334, April.
  • Handle: RePEc:spr:jcomop:v:31:y:2016:i:3:d:10.1007_s10878-014-9825-y
    DOI: 10.1007/s10878-014-9825-y
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10878-014-9825-y
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10878-014-9825-y?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Zhong, Weiya & Dosa, Gyorgy & Tan, Zhiyi, 2007. "On the machine scheduling problem with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1057-1072, November.
    2. Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
    3. Bayi Cheng & Shanlin Yang & Xiaoxuan Hu & Kai Li, 2014. "Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(3), pages 571-578.
    4. Cheng, T. C. Edwin & Gordon, Valery S. & Kovalyov, Mikhail Y., 1996. "Single machine scheduling with batch deliveries," European Journal of Operational Research, Elsevier, vol. 94(2), pages 277-283, October.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jason Pan & Chi-Shiang Su, 2015. "Two parallel machines problem with job delivery coordination and availability constraint," Annals of Operations Research, Springer, vol. 235(1), pages 653-664, December.
    2. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    3. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    4. Wan, Long & Zhang, An, 2014. "Coordinated scheduling on parallel machines with batch delivery," International Journal of Production Economics, Elsevier, vol. 150(C), pages 199-203.
    5. Low, Chinyao & Chang, Chien-Min & Li, Rong-Kwei & Huang, Chia-Ling, 2014. "Coordination of production scheduling and delivery problems with heterogeneous fleet," International Journal of Production Economics, Elsevier, vol. 153(C), pages 139-148.
    6. Liu, Peihai & Lu, Xiwen, 2016. "Integrated production and job delivery scheduling with an availability constraint," International Journal of Production Economics, Elsevier, vol. 176(C), pages 1-6.
    7. Zhong, Xueling & Fan, Jie & Ou, Jinwen, 2022. "Coordinated scheduling of the outsourcing, in-house production and distribution operations," European Journal of Operational Research, Elsevier, vol. 302(2), pages 427-437.
    8. Gao, Su & Qi, Lian & Lei, Lei, 2015. "Integrated batch production and distribution scheduling with limited vehicle capacity," International Journal of Production Economics, Elsevier, vol. 160(C), pages 13-25.
    9. Yinling Wang & Yan Lan & Xin Chen & Xin Han & Yong Piao, 2022. "A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$ P 2 → D | v = 1 , c = 1 | C max," Journal of Combinatorial Optimization, Springer, vol. 44(4), pages 2195-2206, November.
    10. Sun Lee, Ik & Yoon, S.H., 2010. "Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs," Omega, Elsevier, vol. 38(6), pages 509-521, December.
    11. Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
    12. Wang, Xiuli & Cheng, T.C.E., 2009. "Production scheduling with supply and delivery considerations to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 194(3), pages 743-752, May.
    13. Jianming Dong & Xueshi Wang & Jueliang Hu & Guohui Lin, 2018. "Single machine scheduling with job delivery to multiple customers," Journal of Scheduling, Springer, vol. 21(3), pages 337-348, June.
    14. Söhnke Maecker & Liji Shen, 2020. "Solving parallel machine problems with delivery times and tardiness objectives," Annals of Operations Research, Springer, vol. 285(1), pages 315-334, February.
    15. Yinling Wang & Yan Lan & Xin Chen & Xin Han & Yong Piao, 0. "A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$P2→D|v=1,c=1|Cmax," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-12.
    16. Guo, Zhaoxia & Shi, Leyuan & Chen, Longchao & Liang, Yong, 2017. "A harmony search-based memetic optimization model for integrated production and transportation scheduling in MTO manufacturing," Omega, Elsevier, vol. 66(PB), pages 327-343.
    17. Schmid, Verena & Doerner, Karl F. & Laporte, Gilbert, 2013. "Rich routing problems arising in supply chain management," European Journal of Operational Research, Elsevier, vol. 224(3), pages 435-448.
    18. Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
    19. Azeddine Cheref & Alessandro Agnetis & Christian Artigues & Jean-Charles Billaut, 2017. "Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence," Journal of Scheduling, Springer, vol. 20(6), pages 681-693, December.
    20. Wang, Guoqing & Cheng, T. C. Edwin, 2000. "Parallel machine scheduling with batch delivery costs," International Journal of Production Economics, Elsevier, vol. 68(2), pages 177-183, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jcomop:v:31:y:2016:i:3:d:10.1007_s10878-014-9825-y. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.