Reinventing Crew Scheduling at Netherlands Railways

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Silke Jütte & Daniel Müller & Ulrich W. Thonemann, 2017. "Optimizing railway crew schedules with fairness preferences," Journal of Scheduling, Springer, vol. 20(1), pages 43-55, February.
  2. Breugem, T. & van Rossum, B.T.C. & Dollevoet, T. & Huisman, D., 2022. "A column generation approach for the integrated crew re-planning problem," Omega, Elsevier, vol. 107(C).
  3. Jespersen-Groth, J. & Potthoff, D. & Clausen, J. & Huisman, D. & Kroon, L.G. & Maróti, G. & Nielsen, M.N., 2007. "Disruption management in passenger railway transportation," Econometric Institute Research Papers EI 2007-05, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  4. Dollevoet, T.A.B. & Pecin, D. & Spliet, R., 2020. "The path programming problem and a partial path relaxation," Econometric Institute Research Papers EI-2020-04, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  5. Wolbeck, Lena Antonia, 2019. "Fairness aspects in personnel scheduling," Discussion Papers 2019/16, Free University Berlin, School of Business & Economics.
  6. Kroon, L.G. & Huisman, D., 2009. "Algorithmic Support for Railway Disruption Management," Econometric Institute Research Papers EI 2009-50, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  7. Leo Kroon & Dennis Huisman & Erwin Abbink & Pieter-Jan Fioole & Matteo Fischetti & Gábor Maróti & Alexander Schrijver & Adri Steenbeek & Roelof Ybema, 2009. "The New Dutch Timetable: The OR Revolution," Interfaces, INFORMS, vol. 39(1), pages 6-17, February.
  8. Huisman, D., 2005. "A column generation approach to solve the crew re-scheduling problem," Econometric Institute Research Papers EI 2005-54, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  9. Silke Jütte & Marc Albers & Ulrich W. Thonemann & Knut Haase, 2011. "Optimizing Railway Crew Scheduling at DB Schenker," Interfaces, INFORMS, vol. 41(2), pages 109-122, April.
  10. Cipriano Santos & Tere Gonzalez & Haitao Li & Kay-Yut Chen & Dirk Beyer & Sundaresh Biligi & Qi Feng & Ravindra Kumar & Shelen Jain & Ranga Ramanujam & Alex Zhang, 2013. "HP Enterprise Services Uses Optimization for Resource Planning," Interfaces, INFORMS, vol. 43(2), pages 152-169, April.
  11. Hartog, A. & Huisman, D. & Abbink, E.J.W. & Kroon, L.G., 2006. "Decision support for crew rostering at NS," Econometric Institute Research Papers EI 2006-04, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  12. Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
  13. Kroon, L.G. & Huisman, D. & Maróti, G., 2007. "Railway timetabling from an operations research," Econometric Institute Research Papers EI 2007-22, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  14. Breugem, T. & Dollevoet, T.A.B. & Huisman, D., 2019. "A Column Generation Approach for the Integrated Crew Re-Planning Problem," Econometric Institute Research Papers EI2019-31, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  15. Heil, Julia & Hoffmann, Kirsten & Buscher, Udo, 2020. "Railway crew scheduling: Models, methods and applications," European Journal of Operational Research, Elsevier, vol. 283(2), pages 405-425.
  16. Emir Hüseyin Özder & Evrencan Özcan & Tamer Eren, 2019. "Staff Task-Based Shift Scheduling Solution with an ANP and Goal Programming Method in a Natural Gas Combined Cycle Power Plant," Mathematics, MDPI, vol. 7(2), pages 1-26, February.
  17. Lucas P. Veelenturf & Daniel Potthoff & Dennis Huisman & Leo G. Kroon & Gábor Maróti & Albert P. M. Wagelmans, 2016. "A Quasi-Robust Optimization Approach for Crew Rescheduling," Transportation Science, INFORMS, vol. 50(1), pages 204-215, February.
  18. Dauzère-Pérès, Stéphane & De Almeida, David & Guyon, Olivier & Benhizia, Faten, 2015. "A Lagrangian heuristic framework for a real-life integrated planning problem of railway transportation resources," Transportation Research Part B: Methodological, Elsevier, vol. 74(C), pages 138-150.
  19. Breugem, T. & Dollevoet, T.A.B. & Huisman, D., 2017. "Is Equality always desirable?," Econometric Institute Research Papers EI2017-30, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  20. Veelenturf, L.P. & Potthoff, D. & Huisman, D. & Kroon, L.G. & Maróti, G. & Wagelmans, A.P.M., 2013. "A Quasi-Robust Optimization Approach for Resource Rescheduling," Econometric Institute Research Papers 50110, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  21. Liping Ge & Stefan Voß & Lin Xie, 2022. "Robustness and disturbances in public transport," Public Transport, Springer, vol. 14(1), pages 191-261, March.
  22. Kroon, L.G. & Huisman, D., 2011. "Algorithmic Support for Disruption Management at Netherlands Railways," Econometric Institute Research Papers EI 2011-06, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  23. Kroon, L.G. & Huisman, D. & Abbink, E.J.W. & Fioole, P-J. & Fischetti, M. & Maróti, G. & Schrijver, A. & Steenbeek, A. & Ybema, R., 2008. "The new Dutch timetable: The OR revolution," Econometric Institute Research Papers EI 2008-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  24. Brian Roth & Anantaram Balakrishnan & Pooja Dewan & April Kuo & Dasaradh Mallampati & Juan Morales, 2018. "Crew Decision Assist: System for Optimizing Crew Assignments at BNSF Railway," Interfaces, INFORMS, vol. 48(5), pages 436-448, October.
  25. Fuentes, Manuel & Cadarso, Luis & Marín, Ángel, 2019. "A hybrid model for crew scheduling in rail rapid transit networks," Transportation Research Part B: Methodological, Elsevier, vol. 125(C), pages 248-265.
  26. Lusby, Richard M. & Larsen, Jesper & Bull, Simon, 2018. "A survey on robustness in railway planning," European Journal of Operational Research, Elsevier, vol. 266(1), pages 1-15.
  27. Abbink, E.J.W., 2008. "Solving large scale crew scheduling problems by using iterative partitioning," Econometric Institute Research Papers EI 2008-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  28. Suyabatmaz, Ali Çetin & Şahin, Güvenç, 2015. "Railway crew capacity planning problem with connectivity of schedules," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 84(C), pages 88-100.
  29. F. Zeynep Sargut & Caner Altuntaş & Dilek Cetin Tulazoğlu, 2017. "Multi-objective integrated acyclic crew rostering and vehicle assignment problem in public bus transportation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(4), pages 1071-1096, October.
  30. de Matta, Renato & Peters, Emmanuel, 2009. "Developing work schedules for an inter-city transit system with multiple driver types and fleet types," European Journal of Operational Research, Elsevier, vol. 192(3), pages 852-865, February.
  31. Breugem, T. & Dollevoet, T.A.B. & Huisman, D., 2018. "Analyzing a Family of Formulations for Cyclic Crew Rostering," Econometric Institute Research Papers EI2018-35, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  32. Thomas Breugem & Twan Dollevoet & Dennis Huisman, 2022. "Is Equality Always Desirable? Analyzing the Trade-Off Between Fairness and Attractiveness in Crew Rostering," Management Science, INFORMS, vol. 68(4), pages 2619-2641, April.
  33. Abbink, E.J.W. & Albino, L. & Dollevoet, T.A.B. & Huisman, D. & Roussado, J. & Saldanha, R.L., 2010. "Solving Large Scale Crew Scheduling Problems in Practice," Econometric Institute Research Papers EI 2010-63, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  34. Masoud Yaghini & Mohammad Karimi & Mohadeseh Rahbar, 2015. "A set covering approach for multi-depot train driver scheduling," Journal of Combinatorial Optimization, Springer, vol. 29(3), pages 636-654, April.
  35. Huisman, Dennis, 2007. "A column generation approach for the rail crew re-scheduling problem," European Journal of Operational Research, Elsevier, vol. 180(1), pages 163-173, July.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.