IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v179y2007i3p692-708.html

A balancing method and genetic algorithm for disassembly line balancing

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Bhattacharya, Sourabh & Govindan, Kannan & Ghosh Dastidar, Surajit & Sharma, Preeti, 2024. "Applications of artificial intelligence in closed-loop supply chains: Systematic literature review and future research agenda," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 184(C).
  2. Hu, Peng & Chu, Feng & Dolgui, Alexandre & Chu, Chengbin & Liu, Ming, 2024. "Integrated multi-product reverse supply chain design and disassembly line balancing under uncertainty," Omega, Elsevier, vol. 126(C).
  3. D. E. Ighravwe & S. A. Oke & K. A. Adebiyi, 2017. "Preventive maintenance task balancing with spare parts optimisation via big-bang big-crunch algorithm," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 811-822, November.
  4. Süleyman Mete & Faruk Serin & Zeynel Abidin Çil & Erkan Çelik & Eren Özceylan, 2023. "A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time," Annals of Operations Research, Springer, vol. 321(1), pages 371-408, February.
  5. Can B. Kalayci & Olcay Polat & Surendra M. Gupta, 2016. "A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem," Annals of Operations Research, Springer, vol. 242(2), pages 321-354, July.
  6. Yufan Huang & Binghai Zhou, 2025. "Trigonometric-based mechanisms hybridized African vulture optimization algorithm for multi-manned disassembly line balancing involving worker heterogeneity and collaboration," Journal of Intelligent Manufacturing, Springer, vol. 36(6), pages 4143-4199, August.
  7. Bingtao Hu & Yixiong Feng & Hao Zheng & Jianrong Tan, 2018. "Sequence Planning for Selective Disassembly Aiming at Reducing Energy Consumption Using a Constraints Relation Graph and Improved Ant Colony Optimization Algorithm," Energies, MDPI, vol. 11(8), pages 1-18, August.
  8. Özceylan, Eren & Paksoy, Turan & Bektaş, Tolga, 2014. "Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 61(C), pages 142-164.
  9. Ömer Faruk Yılmaz & Büşra Yazıcı, 2022. "Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches," Annals of Operations Research, Springer, vol. 319(2), pages 1793-1843, December.
  10. Shujin Qin & Jiaxin Wang & Jiacun Wang & Xiwang Guo & Liang Qi & Yaping Fu, 2024. "Linear Disassembly Line Balancing Problem with Tool Deterioration and Solution by Discrete Migratory Bird Optimizer," Mathematics, MDPI, vol. 12(2), pages 1-20, January.
  11. Lixia Zhu & Zeqiang Zhang & Yi Wang & Ning Cai, 2020. "On the end-of-life state oriented multi-objective disassembly line balancing problem," Journal of Intelligent Manufacturing, Springer, vol. 31(6), pages 1403-1428, August.
  12. Wanlin Yang & Zixiang Li & Chenyu Zheng & Zikai Zhang & Liping Zhang & Qiuhua Tang, 2024. "Multi-Objective Optimization for a Partial Disassembly Line Balancing Problem Considering Profit and Carbon Emission," Mathematics, MDPI, vol. 12(8), pages 1-19, April.
  13. Fang, Yilin & Liu, Quan & Li, Miqing & Laili, Yuanjun & Pham, Duc Truong, 2019. "Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations," European Journal of Operational Research, Elsevier, vol. 276(1), pages 160-174.
  14. Mehmet Ali Ilgin & Hakan Akçay & Ceyhun Araz, 2017. "Disassembly line balancing using linear physical programming," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 6108-6119, October.
  15. Shujin Qin & Xinkai Xie & Jiacun Wang & Xiwang Guo & Liang Qi & Weibiao Cai & Ying Tang & Qurra Tul Ann Talukder, 2024. "An Optimized Advantage Actor-Critic Algorithm for Disassembly Line Balancing Problem Considering Disassembly Tool Degradation," Mathematics, MDPI, vol. 12(6), pages 1-19, March.
  16. Wei Meng & Xiufen Zhang, 2020. "Optimization of Remanufacturing Disassembly Line Balance Considering Multiple Failures and Material Hazards," Sustainability, MDPI, vol. 12(18), pages 1-16, September.
  17. Jia Liu & Shuwei Wang, 2017. "Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment," Sustainability, MDPI, vol. 9(2), pages 1-15, February.
  18. Jianhua Cao & Xuhui Xia & Lei Wang & Zelin Zhang & Xiang Liu, 2019. "A Novel Multi-Efficiency Optimization Method for Disassembly Line Balancing Problem," Sustainability, MDPI, vol. 11(24), pages 1-16, December.
  19. Tian, Xiaoyu & Zhang, Zhi-Hai, 2019. "Capacitated disassembly scheduling and pricing of returned products with price-dependent yield," Omega, Elsevier, vol. 84(C), pages 160-174.
  20. Yusha Zhou & Xiuping Guo & Dong Li, 2022. "A dynamic programming approach to a multi-objective disassembly line balancing problem," Annals of Operations Research, Springer, vol. 311(2), pages 921-944, April.
  21. Ziyan Zhao & Pengkai Xiao & Jiacun Wang & Shixin Liu & Xiwang Guo & Shujin Qin & Ying Tang, 2023. "Improved Brain-Storm Optimizer for Disassembly Line Balancing Problems Considering Hazardous Components and Task Switching Time," Mathematics, MDPI, vol. 12(1), pages 1-19, December.
  22. Abdeljaouad, Mohamed Amine & Bahroun, Zied & Omrane, Anissa & Fondrevelle, Julien, 2015. "Job-shop production scheduling with reverse flows," European Journal of Operational Research, Elsevier, vol. 244(1), pages 117-128.
  23. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
  24. Ondemir, Onder & Gupta, Surendra M., 2014. "A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system," European Journal of Operational Research, Elsevier, vol. 233(2), pages 408-419.
  25. Kalaycılar, Eda Göksoy & Azizoğlu, Meral & Yeralan, Sencer, 2016. "A disassembly line balancing problem with fixed number of workstations," European Journal of Operational Research, Elsevier, vol. 249(2), pages 592-604.
  26. Xuhui Xia & Wei Liu & Zelin Zhang & Lei Wang & Jianhua Cao & Xiang Liu, 2019. "A Balancing Method of Mixed-model Disassembly Line in Random Working Environment," Sustainability, MDPI, vol. 11(8), pages 1-16, April.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.