IDEAS home Printed from https://ideas.repec.org/p/wbk/wboper/41978.html

Drivers of Delays in Procurement of Infrastructure Projects

Author

Listed:
  • World Bank

Abstract

No abstract is available for this item.

Suggested Citation

  • World Bank, 2024. "Drivers of Delays in Procurement of Infrastructure Projects," World Bank Publications - Reports 41978, The World Bank Group.
  • Handle: RePEc:wbk:wboper:41978
    as

    Download full text from publisher

    File URL: https://openknowledge.worldbank.org/bitstreams/62234fde-fbe8-4e31-a93d-51aab47e0634/download
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Yakubu Adisa Olawale & Ming Sun, 2010. "Cost and time control of construction projects: inhibiting factors and mitigating measures in practice," Construction Management and Economics, Taylor & Francis Journals, vol. 28(5), pages 509-526.
    2. Pablo Ballesteros-Pérez & Stefán Thor Smith & Josephine Gwen Lloyd-Papworth & Peter Cooke, 2018. "Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom," Construction Management and Economics, Taylor & Francis Journals, vol. 36(12), pages 666-682, December.
    3. Ismail Abdul Rahman & Aftab Memon & Ahmad Tarmizi Abd. Karim, 2013. "Relationship between Factors of Construction Resources Affecting Project Cost," Modern Applied Science, Canadian Center of Science and Education, vol. 7(1), pages 1-67, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Emad Mohamed & Parinaz Jafari & Adam Chehouri & Simaan AbouRizk, 2021. "Simulation-Based Approach for Lookahead Scheduling of Onshore Wind Projects Subject to Weather Risk," Sustainability, MDPI, vol. 13(18), pages 1-27, September.
    2. Vazquez, Alexei & Marasinou, Chrysostomos & Kalogridis, Georgios & Ellinas, Christos, 2024. "Activity delay patterns in project networks," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 637(C).
    3. Kwabena Asomanin Anaman & Irene Susana Egyir, 2019. "Economic Shocks and the Growth of the Construction Industry in Ghana Over the 50-Year Period From 1968 to 2017," Research in World Economy, Research in World Economy, Sciedu Press, vol. 10(1), pages 1-16, June.
    4. Nyoni, Thabani, 2019. "Cost overrun factors in construction industry: a case of Zimbabwe," MPRA Paper 96788, University Library of Munich, Germany.
    5. Petter Osmundsen & Kristin Helen Roll, 2016. "Rig Rates and Drilling Speed: Reinforcing Effects," CESifo Working Paper Series 5895, CESifo.
    6. Patrick Uwineza & Jean de Dieu Dushimimana, 2022. "Project Management Practices And Effectiveness Of Private Radio Station’S Projects A Case Of Selected Projects Of Energy Radio, In Musanze District, Rwanda (2017-2020)," Working papers 2022-42-08, Voice of Research.
    7. Jin Woo Won & Wooyong Jung & Seung Heon Han & Sungmin Yun & Bonsang Koo, 2019. "What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?," Sustainability, MDPI, vol. 11(21), pages 1-17, October.
    8. Leo-Olagbaye Feyisetan & Ogunjimi Olufisayo Samuel & Abass Adelayo Fasilat, 2025. "Cost Control Techniques on Civil Engineering Projects in Oyo State, Nigeria," International Journal of Research and Innovation in Applied Science, International Journal of Research and Innovation in Applied Science (IJRIAS), vol. 10(10), pages 1375-1391, October.
    9. Luciana Muthoki Nyamai, 2018. "Effect Of Fixed Assets Management And Investment Decisions On Performance Of Fruit Farming In Kenya: A Case Of Machakos County," European Journal of Business and Strategic Management, International Peer Review Journals and Books, vol. 3(2), pages 44-58.
    10. Byung-Yun Son & Eul-Bum Lee, 2019. "Using Text Mining to Estimate Schedule Delay Risk of 13 Offshore Oil and Gas EPC Case Studies During the Bidding Process," Energies, MDPI, vol. 12(10), pages 1-25, May.
    11. Zakari Mustapha & Benjamin Boahene Akomah & Samuel Kwame Ansah, 2023. "Construction Projects Success: Time, Cost, Quality and Safety," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 7(9), pages 680-688, September.
    12. Shahab Shoar & Nicholas Chileshe, 2021. "Exploring the Causes of Design Changes in Building Construction Projects: An Interpretive Structural Modeling Approach," Sustainability, MDPI, vol. 13(17), pages 1-23, August.
    13. Giuliano Marella & Valentina Antoniucci, 2019. "Time Overrun in Public Works—Evidence from North-East Italy," Sustainability, MDPI, vol. 11(24), pages 1-17, December.
    14. Steven J. Schuldt & Mathew R. Nicholson & Yaquarri A. Adams & Justin D. Delorit, 2021. "Weather-Related Construction Delays in a Changing Climate: A Systematic State-of-the-Art Review," Sustainability, MDPI, vol. 13(5), pages 1-25, March.
    15. Shenzhe Jiang & Junjie Xia & Jiajun Xu & Jianye Yan, 2023. "A theory of National Development Bank: long-term investment and the agency problem," Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 76(3), pages 995-1024, October.
    16. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
    17. Luciana Muthoki Nyamai, 2018. "Effect Of Financial Planning And Working Capital Management On The Performance Of Fruit Farming In Kenya: A Case Of Machakos County," International Journal of Finance and Accounting, IPRJB, vol. 3(1), pages 19-34.
    18. Øglend, Atle & Osmundsen, Petter & Lorentzen, Sindre, 2016. "Cost Overrun at the Norwegian Continental Shelf: The element of surprise," UiS Working Papers in Economics and Finance 2016/3, University of Stavanger.
    19. Zhou, Yifan & Miao, Jindan & Yan, Bin & Zhang, Zhisheng, 2020. "Bio-objective long-term maintenance scheduling for wind turbines in multiple wind farms," Renewable Energy, Elsevier, vol. 160(C), pages 1136-1147.
    20. Myung-Hun Kim & Eul-Bum Lee & Han-Suk Choi, 2019. "A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects," Sustainability, MDPI, vol. 11(5), pages 1-21, February.

    More about this item

    Keywords

    ;

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wbk:wboper:41978. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Tal Ayalon (email available below). General contact details of provider: https://edirc.repec.org/data/dvewbus.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.