Balancing U-Shaped Assembly Lines with Resource Dependent Task Times: A Simulated Annealing Approach

Listed author(s):
  • Jayaswal, Sachin
  • Agarwal, Prashant
Registered author(s):

    The advent of Just-in-Time (JIT) and Group Technology philosophies has popularized U- shaped assembly lines, which help overcome many of the disadvantages, like line inflexibility, job monotony, large inventories, etc., typically associated with straight assembly lines. Al- though U-shaped layout has demonstrated it supremacy over the traditional straight layout, the problem of U-shaped assembly line balancing (ULB) is much more complex. The extant literature on ULB assumes that each assembly task requires a fixed (or no) equipment and a fi xed number of workers. However, it is often desirable to reduce certain task times by assigning more workers or alternative equipments at a given workstation. The problem in such cases is to assign not only the task but also resource alternatives (number of workers and equipment type) to workstations. Research on such resource dependent U-shaped assembly line balancing (RDULB) is scarce. We address the problem of RDULB and propose a Simulated Annealing (SA) based metaheuristic, which gives optimal solution for most of the small-to-medium problem instances. For very large problems, while SA generates a good feasible solution within half an hour to 1.5 hours, Cplex is unable to find a single feasible solution even after 10 times the CPU time required by SA.

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

    File URL: https://web.iima.ac.in/assets/snippets/workingpaperpdf/7871207692013-11-06.pdf
    File Function: English Version
    Download Restriction: no

    Paper provided by Indian Institute of Management Ahmedabad, Research and Publication Department in its series IIMA Working Papers with number WP2013-11-06.

    as
    in new window

    Length:
    Date of creation: 07 Nov 2013
    Handle: RePEc:iim:iimawp:12142
    Contact details of provider: Phone: 91 79 2630 7241
    Fax: 91 79 2630 6896
    Web page: https://web.iima.ac.in/publications
    Email:


    More information through EDIRC

    References listed on IDEAS
    Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:

    as
    in new window


    1. Gokcen, Hadi & Ag[caron]pak, Kursad, 2006. "A goal programming approach to simple U-line balancing problem," European Journal of Operational Research, Elsevier, vol. 171(2), pages 577-585, June.
    2. Scholl, Armin, 1995. "Balancing and sequencing of assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 9690, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    3. G. J. Miltenburg & J. Wijngaard, 1994. "The U-line Line Balancing Problem," Management Science, INFORMS, vol. 40(10), pages 1378-1388, October.
    4. Corominas, Albert & Pastor, Rafael & Plans, Joan, 2008. "Balancing assembly line with skilled and unskilled workers," Omega, Elsevier, vol. 36(6), pages 1126-1132, December.
    5. Aase, Gerald R. & Olson, John R. & Schniederjans, Marc J., 2004. "U-shaped assembly line layouts and their impact on labor productivity: An experimental study," European Journal of Operational Research, Elsevier, vol. 156(3), pages 698-711, August.
    6. Chams, M. & Hertz, A. & de Werra, D., 1987. "Some experiments with simulated annealing for coloring graphs," European Journal of Operational Research, Elsevier, vol. 32(2), pages 260-266, November.
    7. Scholl, Armin & Klein, Robert, 1997. "ULINO: optimally balancing U-shaped JIT assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 10925, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    8. Peter A. Pinto & David G. Dannenbring & Basheer M. Khumawala, 1983. "Assembly Line Balancing with Processing Alternatives: An Application," Management Science, INFORMS, vol. 29(7), pages 817-830, July.
    9. Timothy L. Urban, 1998. "Note. Optimal Balancing of U-Shaped Assembly Lines," Management Science, INFORMS, vol. 44(5), pages 738-741, May.
    10. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
    11. Miltenburg, John, 2001. "U-shaped production lines: A review of theory and practice," International Journal of Production Economics, Elsevier, vol. 70(3), pages 201-214, April.
    12. Connolly, David T., 1990. "An improved annealing scheme for the QAP," European Journal of Operational Research, Elsevier, vol. 46(1), pages 93-100, May.
    Full references (including those not matched with items on IDEAS)

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    When requesting a correction, please mention this item's handle: RePEc:iim:iimawp:12142. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: ()

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    This information is provided to you by IDEAS at the Research Division of the Federal Reserve Bank of St. Louis using RePEc data.