Risk Management Challenges Of European Social Fund Under Current Programming Period 2014-2020 In Romania

Author

Listed:
  • Andrei LINU
  • Danut DUMITRASCU

Abstract

This paper aim first to inventor the actual situation of risk management in the implementation of ESF (European Social Fund) programmes in Romania. ESF is implemented in Romania in 2014-2020 programming period through Human Capital Operational Programme and Administrative Capacity Operational Programme. These Operational Programmes (OPs) are both now in the operational phase, with new projects just granted and starting, a lot of calls for proposals yet in the evaluation and contracting phase and many calls for proposals ongoing. Based on the previous published papers/works focused on the former Operational Programmes (OP) from 2007-2013 programming period as a starting point, this paper will translate their conclusions and update these under actual conditions for programmes and projects implementation. Romania has implemented in 2007-2015 two OP co-financed by ESF (Human Resource Development OP and Administrative Capacity Development OP). These OPs are now in the closing phase and actors involved in OPs and projects can draw some conclusions & lessons learned from risk management issues in order to avoid repeating it or to develop resiliency and recovering measurements. One of the main major issue in the 2007-2013 programming period was the lack of a scientific approach in risk management at the programmes and the projects levels since the beginning. Only in the last years were performed qualitative and quantitative analysis, with ongoing studies performed and thus the actual programming period could benefit from scientific inputs. Therefore the actors involved (ministries & agencies, beneficiaries) can access now academic studies and tools in order to perform a more suitable risk management.

Suggested Citation

  • Andrei LINU & Danut DUMITRASCU, 2017. "Risk Management Challenges Of European Social Fund Under Current Programming Period 2014-2020 In Romania," Proceedings of the INTERNATIONAL MANAGEMENT CONFERENCE, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 11(1), pages 107-119, November.
  • Handle: RePEc:rom:mancon:v:11:y:2017:i:1:p:107-119
    as

    Download full text from publisher

    File URL: https://conference.management.ase.ro/archives/2017/pdf/1_12.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Ciprian NICOLAE, 2015. "Qualitative Analysis Of The Risks Identified In The Management Of The Non-Reimbursable Funds In Romania In 2007-2013," Proceedings of Administration and Public Management International Conference, Research Centre in Public Administration and Public Services, Bucharest, Romania, vol. 11(1), pages 117-125, October.
    2. Madadi, M. & Iranmanesh, H., 2012. "A management oriented approach to reduce a project duration and its risk (variability)," European Journal of Operational Research, Elsevier, vol. 219(3), pages 751-761.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Tao, Liangyan & Wu, Desheng & Liu, Sifeng & Lambert, James H., 2017. "Schedule risk analysis for new-product development: The GERT method extended by a characteristic function," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 464-473.
    2. Martens, Annelies & Vanhoucke, Mario, 2019. "The impact of applying effort to reduce activity variability on the project time and cost performance," European Journal of Operational Research, Elsevier, vol. 277(2), pages 442-453.
    3. Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2022. "Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 297(2), pages 451-466.
    4. Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2020. "The impact of a limited budget on the corrective action taking process," European Journal of Operational Research, Elsevier, vol. 286(3), pages 1070-1086.
    5. Chen, Yang & Zhang, Xiaoling & Chau, K.W. & Yang, Linchuan, 2022. "How the institutional change in urban redevelopment affects the duration of land redevelopment approval in China?," Land Use Policy, Elsevier, vol. 119(C).
    6. Servranckx, Tom & Vanhoucke, Mario & Aouam, Tarik, 2021. "Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity," European Journal of Operational Research, Elsevier, vol. 295(3), pages 1161-1179.
    7. Cui, Nanfang & Demeulemeester, Erik & Bie, Li, 2016. "Incorporation of activity sensitivity measures into buffer management to manage project schedule riskAuthor-Name: Hu, Xuejun," European Journal of Operational Research, Elsevier, vol. 249(2), pages 717-727.
    8. Nicolae Ciprian & Badea Dumitru, 2017. "The importance of a project level risk management methodology for EU Structural and Investment Funds accession in Romania," Proceedings of the International Conference on Business Excellence, Sciendo, vol. 11(1), pages 927-936, July.
    9. Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2021. "Using Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 288(3), pages 736-752.
    10. Fernando Acebes & Javier Pajares & José M. González-Varona & Adolfo López-Paredes, 2021. "Project risk management from the bottom-up: Activity Risk Index," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1375-1396, December.
    11. Colin, Jeroen & Vanhoucke, Mario, 2014. "Setting tolerance limits for statistical project control using earned value management," Omega, Elsevier, vol. 49(C), pages 107-122.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:rom:mancon:v:11:y:2017:i:1:p:107-119. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ciocoiu Nadia Carmen (email available below). General contact details of provider: https://edirc.repec.org/data/mnasero.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.