IDEAS home Printed from https://ideas.repec.org/a/plo/pone00/0265972.html

Risk assessment model for international construction projects considering risk interdependence using the DEMATEL method

Author

Listed:
  • Fengfeng Zhu
  • Hao Hu
  • Feng Xu

Abstract

Given the complexity of international construction projects (ICP), risk management difficulties commonly cause cost overruns. This paper analyzes the problems of risk interdependence and subjective ratings in the application of the traditional risk assessment model in ICP. To solve the above problems, this paper proposes a risk assessment model for ICP that considers risk interdependence and obtains references from similar projects. The model applies the Decision-Making Trial and Evaluation Laboratory (DEMATEL) to determine the risk interdependence and its contribution to the overall project risk. Moreover, this model recalls the risks, probabilities, impacts, and risk events records of similar historical projects as the necessary inputs, thereby addressing the issue of subjectivity. An integrated framework is provided to identify, analyze, and prioritize ICP risks to incorporate risk interdependence into the risk management process. Finally, this paper demonstrates and validates the proposed model through a real project. The proposed model is useful for international construction companies to support project selection and bidding decisions in the early stage of ICP.

Suggested Citation

  • Fengfeng Zhu & Hao Hu & Feng Xu, 2022. "Risk assessment model for international construction projects considering risk interdependence using the DEMATEL method," PLOS ONE, Public Library of Science, vol. 17(5), pages 1-20, May.
  • Handle: RePEc:plo:pone00:0265972
    DOI: 10.1371/journal.pone.0265972
    as

    Download full text from publisher

    File URL: https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0265972
    Download Restriction: no

    File URL: https://journals.plos.org/plosone/article/file?id=10.1371/journal.pone.0265972&type=printable
    Download Restriction: no

    File URL: https://libkey.io/10.1371/journal.pone.0265972?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Alireza Valipour & Hadi Sarvari & Jolanta Tamošaitiene, 2018. "Risk Assessment in PPP Projects by Applying Different MCDM Methods and Comparative Results Analysis," Administrative Sciences, MDPI, vol. 8(4), pages 1-17, December.
    2. Fang, Chao & Marle, Franck & Zio, Enrico & Bocquet, Jean-Claude, 2012. "Network theory-based analysis of risk interactions in large engineering projects," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 1-10.
    3. Hamzeh Dehghani & Ali Hormozi & Mansour Nikpour, 2022. "Systematic risks assessment of precast concrete canal in irrigation projects using DEMATEL method," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(1), pages 123-130, February.
    4. Augustinas Maceika & Andrej Bugajev & Olga Regina Šostak & Tatjana Vilutienė, 2021. "Decision Tree and AHP Methods Application for Projects Assessment: A Case Study," Sustainability, MDPI, vol. 13(10), pages 1-33, May.
    5. Satish Kumar Viswanathan & Kamalendra Kumar Tripathi & Kumar Neeraj Jha, 2020. "Influence of risk mitigation measures on international construction project success criteria – a survey of Indian experiences," Construction Management and Economics, Taylor & Francis Journals, vol. 38(3), pages 207-222, March.
    6. Gholamreza Dehdasht & Rosli Mohamad Zin & M. Salim Ferwati & Mu’azu Mohammed Abdullahi & Ali Keyvanfar & Ronald McCaffer, 2017. "DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects," Sustainability, MDPI, vol. 9(8), pages 1-24, August.
    7. Rezaei, Jafar, 2016. "Best-worst multi-criteria decision-making method: Some properties and a linear model," Omega, Elsevier, vol. 64(C), pages 126-130.
    8. Georgios K. Koulinas & Alexandros S. Xanthopoulos & Konstantinos A. Sidas & Dimitrios E. Koulouriotis, 2021. "Risks Ranking in a Desalination Plant Construction Project with a Hybrid AHP, Risk Matrix, and Simulation-Based Approach," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(10), pages 3221-3233, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Milena Lakicevic & Bojan Srdjevic, 2022. "An Approach to Developing the Multicriteria Optimal Forest Management Plan: The “Fruska Gora” National Park Case Study," Land, MDPI, vol. 11(10), pages 1-14, September.
    2. Mohammad Khalilzadeh & Laleh Katoueizadeh & Edmundas Kazimieras Zavadskas, 2020. "Risk identification and prioritization in banking projects of payment service provider companies: an empirical study," Frontiers of Business Research in China, Springer, vol. 14(1), pages 1-27, December.
    3. James J. H. Liou & Perry C. Y. Liu & Huai-Wei Lo, 2020. "A Failure Mode Assessment Model Based on Neutrosophic Logic for Switched-Mode Power Supply Risk Analysis," Mathematics, MDPI, vol. 8(12), pages 1-19, December.
    4. Sueun Jung & Jihyun Lee, 2023. "Exploring a Conceptual Framework of Koreans’ Residential Satisfaction Based on Maslow’s Human Needs: A Qualitative and Quantitative Integrated Study," Sustainability, MDPI, vol. 15(19), pages 1-40, September.
    5. Michal Gluszak & Remigiusz Gawlik & Malgorzata Zieba, 2019. "Smart and Green Buildings Features in the Decision-Making Hierarchy of Office Space Tenants: An Analytic Hierarchy Process Study," Administrative Sciences, MDPI, vol. 9(3), pages 1-16, July.
    6. Liang, Fuqi & Brunelli, Matteo & Rezaei, Jafar, 2020. "Consistency issues in the best worst method: Measurements and thresholds," Omega, Elsevier, vol. 96(C).
    7. Salimi, Negin & Rezaei, Jafar, 2018. "Evaluating firms’ R&D performance using best worst method," Evaluation and Program Planning, Elsevier, vol. 66(C), pages 147-155.
    8. Ravindra Singh Saluja & Varinder Singh, 2023. "Attribute-based characterization, coding, and selection of joining processes using a novel MADM approach," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 616-655, June.
    9. Chen, Wenqiang & Dou, Yu & Zhang, Yin & Sun, Yongai & Yang, Jing, 2026. "Risk disturbance and recovery analysis of urban water supply systems based on social network," Reliability Engineering and System Safety, Elsevier, vol. 265(PB).
    10. Guo, Mengzhuo & Zhang, Qingpeng & Liao, Xiuwu & Chen, Frank Youhua & Zeng, Daniel Dajun, 2021. "A hybrid machine learning framework for analyzing human decision-making through learning preferences," Omega, Elsevier, vol. 101(C).
    11. Nejla Ould Daoud Ellili, 2024. "Bibliometric analysis of sustainability papers: Evidence from Environment, Development and sustainability," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 26(4), pages 8183-8209, April.
    12. Junli Zhang & Guoteng Wang & Zheng Xu & Zheren Zhang, 2022. "A Comprehensive Evaluation Method and Strengthening Measures for AC/DC Hybrid Power Grids," Energies, MDPI, vol. 15(12), pages 1-20, June.
    13. Hamzeh Soltanali & Mehdi Khojastehpour & Siamak Kheybari, 2023. "Evaluating the critical success factors for maintenance management in agro-industries using multi-criteria decision-making techniques," Operations Management Research, Springer, vol. 16(2), pages 949-968, June.
    14. Yossi Hadad & Baruch Keren & Dima Alberg, 2023. "An Expert System for Ranking and Matching Electric Vehicles to Customer Specifications and Requirements," Energies, MDPI, vol. 16(11), pages 1-18, May.
    15. Ebrahim Sharifi & Saman Hassanzadeh Amin & Liping Fang, 2025. "Assessing sustainability of food supply chains by using a novel method integrating group multi-criteria decision-making and interval Type-2 fuzzy set," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 27(2), pages 3665-3705, February.
    16. Vieira, Fabiana C. & Ferreira, Fernando A.F. & Govindan, Kannan & Ferreira, Neuza C.M.Q.F. & Banaitis, Audrius, 2022. "Measuring urban digitalization using cognitive mapping and the best worst method (BWM)," Technology in Society, Elsevier, vol. 71(C).
    17. Ridvan Ertugrul Yildirim & Aziz Sisman, 2025. "Spatial Decision Support for Determining Suitable Emergency Assembly Places Using GIS and MCDM Techniques," Sustainability, MDPI, vol. 17(5), pages 1-28, March.
    18. Besharati Fard, Moein & Moradian, Parisa & Emarati, Mohammadreza & Ebadi, Mehdi & Gholamzadeh Chofreh, Abdoulmohammad & Klemeŝ, Jiří Jaromír, 2022. "Ground-mounted photovoltaic power station site selection and economic analysis based on a hybrid fuzzy best-worst method and geographic information system: A case study Guilan province," Renewable and Sustainable Energy Reviews, Elsevier, vol. 169(C).
    19. Rafael Lizarralde & Jaione Ganzarain & Mikel Zubizarreta, 2020. "Assessment and Selection of Technologies for the Sustainable Development of an R&D Center," Sustainability, MDPI, vol. 12(23), pages 1-23, December.
    20. Amelia Bilbao-Terol & Verónica Cañal-Fernández & Carmen González-Pérez, 2026. "Improving the assessment of social and environmental impacts of RE projects for financial institutions," Operational Research, Springer, vol. 26(2), pages 1-54, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0265972. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.