IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v57y2006i1d10.1057_palgrave.jors.2601966.html
   My bibliography  Save this article

Bootstrapping to solve the limited data problem in production control: an application in batch process industries

Author

Listed:
  • V C Ivănescu

    (Technische Universiteit Eindhoven)

  • J W M Bertrand

    (Technische Universiteit Eindhoven)

  • J C Fransoo

    (Technische Universiteit Eindhoven)

  • J P C Kleijnen

    (Tilburg University)

Abstract

Batch process industries are characterized by complex precedence relationships among operations, which makes the estimation of an acceptable workload very difficult. Previous research indicated that a regression-based model that uses aggregate job set characteristics may be used to support order acceptance decisions. Applications of such models in real-life assume that sufficient historical data on job sets and the corresponding makespans are available. In practice, however, historical data maybe very limited and may not be sufficient to produce accurate regression estimates. This paper shows that such a lack of data significantly impacts the performance of regression-based order acceptance procedures. To resolve this problem, we devised a method that uses the bootstrap principle. A simulation study shows that performance improvements are obtained when using the parameters estimated from the bootstrapped data set, demonstrating that this bootstrapping procedure can indeed solve the limited data problem in production control.

Suggested Citation

  • V C Ivănescu & J W M Bertrand & J C Fransoo & J P C Kleijnen, 2006. "Bootstrapping to solve the limited data problem in production control: an application in batch process industries," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(1), pages 2-9, January.
  • Handle: RePEc:pal:jorsoc:v:57:y:2006:i:1:d:10.1057_palgrave.jors.2601966
    DOI: 10.1057/palgrave.jors.2601966
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2601966
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2601966?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Raaymakers, W. H. M. & Hoogeveen, J. A., 2000. "Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing," European Journal of Operational Research, Elsevier, vol. 126(1), pages 131-151, October.
    2. Carlier, Jacques, 1987. "Scheduling jobs with release dates and tails on identical machines to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 29(3), pages 298-306, June.
    3. Michael S. Lane & Ali H. Mansour & John L. Harpell, 1993. "Operations Research Techniques: A Longitudinal Update 1973–1988," Interfaces, INFORMS, vol. 23(2), pages 63-68, April.
    4. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Alessandro Agnetis & Alberto Coppi & Matteo Corsini & Gabriella Dellino & Carlo Meloni & Marco Pranzo, 2014. "A decomposition approach for the combined master surgical schedule and surgical case assignment problems," Health Care Management Science, Springer, vol. 17(1), pages 49-59, March.
    2. Kleijnen, J.P.C., 2007. "Simulation Experiments in Practice : Statistical Design and Regression Analysis," Discussion Paper 2007-09, Tilburg University, Center for Economic Research.
    3. Kleijnen, J.P.C., 2006. "Generalized Response Surface Methodology : A New Metaheuristic," Discussion Paper 2006-77, Tilburg University, Center for Economic Research.
    4. Kleijnen, J.P.C., 2006. "White Noise Assumptions Revisited : Regression Models and Statistical Designs for Simulation Practice," Discussion Paper 2006-50, Tilburg University, Center for Economic Research.
    5. M I Reis dos Santos & P M Reis dos Santos, 2011. "Construction and validation of distribution-based regression simulation metamodels," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(7), pages 1376-1384, July.
    6. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Raaymakers, W. H. M. & Weijters, A. J. M. M., 2003. "Makespan estimation in batch process industries: A comparison between regression analysis and neural networks," European Journal of Operational Research, Elsevier, vol. 145(1), pages 14-30, February.
    2. Raaymakers, Wenny H. M. & Fransoo, Jan C., 2000. "Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries," International Journal of Production Economics, Elsevier, vol. 68(2), pages 137-149, November.
    3. Nekoiemehr, Nooshin & Zhang, Guoqing & Selvarajah, Esaignani, 2019. "Due date quotation in a dual-channel supply chain," International Journal of Production Economics, Elsevier, vol. 215(C), pages 102-111.
    4. Philip Kaminsky & Onur Kaya, 2008. "Scheduling and due‐date quotation in a make‐to‐order supply chain," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 444-458, August.
    5. Mukherjee, Saral & Chatterjee, A.K., 2006. "The average shadow price for MILPs with integral resource availability and its relationship to the marginal unit shadow price," European Journal of Operational Research, Elsevier, vol. 169(1), pages 53-64, February.
    6. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    7. Kolahan, F. & Liang, M., 1998. "An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups," European Journal of Operational Research, Elsevier, vol. 109(1), pages 142-159, August.
    8. M Haouari & T Ladhari, 2007. "Minimizing maximum lateness in a flow shop subject to release dates," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 62-72, January.
    9. Zhi-Long Chen & Nicholas G. Hall, 2010. "The Coordination of Pricing and Scheduling Decisions," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 77-92, April.
    10. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    11. Xia, Yu & Chen, Bintong & Yue, Jinfeng, 2008. "Job sequencing and due date assignment in a single machine shop with uncertain processing times," European Journal of Operational Research, Elsevier, vol. 184(1), pages 63-75, January.
    12. Awi Federgruen & Gur Mosheiov, 1993. "Simultaneous optimization of efficiency and performance balance measures in single‐machine scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 951-970, December.
    13. Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
    14. Bernard Dickman & Yonah Wilamowsky & Sheldon Epstein, 2001. "Multiple common due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(4), pages 293-298, June.
    15. Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
    16. Min Ji & Sai Liu & Xiaolin Zhang & Keke Cao & T. C. E. Cheng, 2017. "Sequencing Games with Slack Due Windows and Group Technology Considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(2), pages 121-133, February.
    17. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    18. Patrick R. Philipoom & Lars Wiegmann & Loren Paul Rees, 1997. "Cost‐based due‐date assignment with the use of classical and neural‐network approaches," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(1), pages 21-46, February.
    19. Cai, X., 1995. "Minimization of agreeably weighted variance in single machine systems," European Journal of Operational Research, Elsevier, vol. 85(3), pages 576-592, September.
    20. Christoph Schuster, 2006. "No-wait Job Shop Scheduling: Tabu Search and Complexity of Subproblems," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 63(3), pages 473-491, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:57:y:2006:i:1:d:10.1057_palgrave.jors.2601966. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.