Minimization of the Number of Tool Magazine Setups on Automated Machines: A Lagrangean Decomposition Approach
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.51.2.309.12784
Download full text from publisher
References listed on IDEAS
- Fred Shepardson & Roy E. Marsten, 1980. "A Lagrangean Relaxation Algorithm for the Two Duty Period Scheduling Problem," Management Science, INFORMS, vol. 26(3), pages 274-281, March.
- Christopher S. Tang & Eric V. Denardo, 1988. "Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants," Operations Research, INFORMS, vol. 36(5), pages 778-784, October.
- Barcia, Paulo & Jornsten, Kurt, 1990. "Improved Lagrangean decomposition: An application to the generalized assignment problem," European Journal of Operational Research, Elsevier, vol. 46(1), pages 84-92, May.
- D'Alfonso, Thomas H. & Ventura, Jose A., 1995. "Assignment of tools to machines in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 81(1), pages 115-133, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Konak, Abdullah & Kulturel-Konak, Sadan & Azizoglu, Meral, 2008. "Minimizing the number of tool switching instants in Flexible Manufacturing Systems," International Journal of Production Economics, Elsevier, vol. 116(2), pages 298-307, December.
- Marvizadeh, S. Zamiri & Choobineh, F.F., 2013. "Reducing the number of setups for CNC punch presses," Omega, Elsevier, vol. 41(2), pages 226-235.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yves Crama & Joris van de Klundert, 1999. "Worst‐case performance of approximation algorithms for tool management problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 445-462, August.
- Calmels, Dorothea, 2022. "An iterated local search procedure for the job sequencing and tool switching problem with non-identical parallel machines," European Journal of Operational Research, Elsevier, vol. 297(1), pages 66-85.
- Chakravarty, Amiya K. & Balakrishnan, Nagraj, 1997. "Job sequencing rules for minimizing the expected makespan in flexible machines," European Journal of Operational Research, Elsevier, vol. 96(2), pages 274-288, January.
- Pessoa, Artur Alves & Hahn, Peter M. & Guignard, Monique & Zhu, Yi-Rong, 2010. "Algorithms for the generalized quadratic assignment problem combining Lagrangean decomposition and the Reformulation-Linearization Technique," European Journal of Operational Research, Elsevier, vol. 206(1), pages 54-63, October.
- Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
- M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
- Yuceer, Umit, 1997. "A multi-product loading problem: a model and solution method," European Journal of Operational Research, Elsevier, vol. 101(3), pages 519-531, September.
- Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
- Moshe Dror & Mohamed Haouari, 2000. "Generalized Steiner Problems and Other Variants," Journal of Combinatorial Optimization, Springer, vol. 4(4), pages 415-436, December.
- Konak, Abdullah & Kulturel-Konak, Sadan & Azizoglu, Meral, 2008. "Minimizing the number of tool switching instants in Flexible Manufacturing Systems," International Journal of Production Economics, Elsevier, vol. 116(2), pages 298-307, December.
- Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
- Lawrence C. Leung & Yer Van Hui & Yong Wang & Gang Chen, 2009. "A 0--1 LP Model for the Integration and Consolidation of Air Cargo Shipments," Operations Research, INFORMS, vol. 57(2), pages 402-412, April.
- Rosenwein, Moshe B. & Wong, Richard T., 1995. "A constrained Steiner tree problem," European Journal of Operational Research, Elsevier, vol. 81(2), pages 430-439, March.
- Erdem Eskigun & Reha Uzsoy & Paul V. Preckel & George Beaujon & Subramanian Krishnan & Jeffrey D. Tew, 2007. "Outbound supply chain network design with mode selection and lead time considerations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(3), pages 282-300, April.
- Sodhi, Manbir S. & Lamond, Bernard F. & Gautier, Antoine & Noel, Martin, 2001. "Heuristics for determining economic processing rates in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(1), pages 105-115, February.
- Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
- Lancia, Giuseppe, 2000. "Scheduling jobs with release dates and tails on two unrelated parallel machines to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 120(2), pages 277-288, January.
- Renato de Matta & Vernon Ning Hsu & Timothy J. Lowe, 1999. "Capacitated selection problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 19-37, February.
- Larsson, Torbjörn & Patriksson, Michael, 1999. "Side constrained traffic equilibrium models-- analysis, computation and applications," Transportation Research Part B: Methodological, Elsevier, vol. 33(4), pages 233-264, May.
- S Özpeynirci & M Azizoğlu, 2010. "A Lagrangean relaxation based approach for the capacity allocation problem in flexible manufacturing systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 872-877, May.
More about this item
Keywords
Programming; integer; algorithms; relaxation: bin-packing problem with sharing; Lagrangean decomposition; Manufacturing; automated systems: tool-loading decision;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:51:y:2003:i:2:p:309-320. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.