IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v37y1991i7p901-904.html
   My bibliography  Save this article

Note---Sequencing JIT Mixed-Model Assembly Lines

Author

Listed:
  • Robert R. Inman

    (Department of Industrial Engineering, Auburn University, Auburn, Alabama 36849)

  • Robert L. Bulfin

    (Department of Industrial Engineering, Auburn University, Auburn, Alabama 36849)

Abstract

We provide a new formulation and solution procedure to sequence a mixed model just-in-time (JIT) assembly system. Mixed model JIT assembly systems are a fundamental part of the well-known "Toyota Production System." The underlying idea in sequencing these systems is to maintain a constant usage rate of all parts on the line. We give a polynomial algorithm to determine the optimal sequence for an objective function that is mathematically different, but intuitively similar to the objective functions of previous researchers. Furthermore, a computational study indicates that the new algorithm is robust in that its sequences are as good as those generated by other algorithms when evaluated with respect to traditional objectives, but are found 200 times faster.

Suggested Citation

  • Robert R. Inman & Robert L. Bulfin, 1991. "Note---Sequencing JIT Mixed-Model Assembly Lines," Management Science, INFORMS, vol. 37(7), pages 901-904, July.
  • Handle: RePEc:inm:ormnsc:v:37:y:1991:i:7:p:901-904
    DOI: 10.1287/mnsc.37.7.901
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.37.7.901
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.37.7.901?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tamura, Takayoshi & Long, Hong & Ohno, Katsuhisa, 1999. "A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline," International Journal of Production Economics, Elsevier, vol. 60(1), pages 557-564, April.
    2. Jayashankar M. Swaminathan & Thomas R. Nitsch, 2007. "Managing Product Variety in Automobile Assembly: The Importance of the Sequencing Point," Interfaces, INFORMS, vol. 37(4), pages 324-333, August.
    3. Bautista, Joaquin & Companys, Ramon & Corominas, Albert, 2000. "Note on cyclic sequences in the product rate variation problem," European Journal of Operational Research, Elsevier, vol. 124(3), pages 468-477, August.
    4. Drexl, Andreas & Jordan, Carsten, 1994. "Materialflußorientierte Produktionssteuerung bei Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 362, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    5. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    6. Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
    7. McMullen, P.R. & Tarasewich, Peter, 2005. "A beam search heuristic method for mixed-model scheduling with setups," International Journal of Production Economics, Elsevier, vol. 96(2), pages 273-283, May.
    8. Matthießen, Lars & Drexl, Andreas & Kimms, Alf, 2000. "Constraint propagation algorithms for the car sequencing problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 531, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    9. Aigbedo, Henry, 2007. "An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain," European Journal of Operational Research, Elsevier, vol. 181(2), pages 704-715, September.
    10. Lebacque, Vassilissa & Jost, Vincent & Brauner, Nadia, 2007. "Simultaneous optimization of classical objectives in JIT scheduling," European Journal of Operational Research, Elsevier, vol. 182(1), pages 29-39, October.
    11. Bautista, J. & Companys, R. & Corominas, A., 1996. "Heuristics and exact algorithms for solving the Monden problem," European Journal of Operational Research, Elsevier, vol. 88(1), pages 101-113, January.
    12. Corominas, Albert & Kubiak, Wieslaw & Pastor, Rafael, 2010. "Mathematical programming modeling of the Response Time Variability Problem," European Journal of Operational Research, Elsevier, vol. 200(2), pages 347-357, January.
    13. Ding, Fong-Yuen & Zhu, Jin & Sun, Hui, 2006. "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives," International Journal of Production Economics, Elsevier, vol. 102(1), pages 108-131, July.
    14. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    15. Fliedner, Malte & Boysen, Nils, 2008. "Solving the car sequencing problem via Branch & Bound," European Journal of Operational Research, Elsevier, vol. 191(3), pages 1023-1042, December.
    16. Wieslaw Kubiak & Mesut Yavuz, 2008. "Just-in-Time Smoothing Through Batching," Manufacturing & Service Operations Management, INFORMS, vol. 10(3), pages 506-518, June.
    17. Andreas Drexl & Alf Kimms, 2001. "Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints," Management Science, INFORMS, vol. 47(3), pages 480-491, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:37:y:1991:i:7:p:901-904. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.