IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v200y2010i2p347-357.html
   My bibliography  Save this article

Mathematical programming modeling of the Response Time Variability Problem

Author

Listed:
  • Corominas, Albert
  • Kubiak, Wieslaw
  • Pastor, Rafael

Abstract

The Response Time Variability Problem (RTVP) is a scheduling problem that has recently been defined in the literature. The RTVP has a broad range of real-life applications from manufacturing to services and information technology. A previous study developed a position exchange heuristic to apply to initial sequences for the RTVP, and a MILP (Mixed Integer Linear Programming) to obtain optimal solutions with a practical limit of 25 units to be scheduled. This paper aims to improve the best mathematical programming model developed thus far in order to solve larger instances up to 40 units to optimality. The contribution of this paper is 4-fold: (i) larger instances can be solved to optimality by the off the shelf standard software; (ii) the new optimal solutions of the RTVP can be used to compare the results of heuristic procedures; (iii) the importance of modeling is demonstrated, as well as the huge impact that reformulation, redundant constraints and the elimination of symmetries have on the efficiency of MILPs is clearly established; finally (iv) a challenge to develop a customized optimization algorithm to rival the MILP solution efficiency for the RTVP is put forward.

Suggested Citation

  • Corominas, Albert & Kubiak, Wieslaw & Pastor, Rafael, 2010. "Mathematical programming modeling of the Response Time Variability Problem," European Journal of Operational Research, Elsevier, vol. 200(2), pages 347-357, January.
  • Handle: RePEc:eee:ejores:v:200:y:2010:i:2:p:347-357
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00027-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. George Steiner & Scott Yeomans, 1993. "Level Schedules for Mixed-Model, Just-in-Time Processes," Management Science, INFORMS, vol. 39(6), pages 728-735, June.
    2. M J Brusco, 2008. "Scheduling advertising slots for television," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(10), pages 1363-1372, October.
    3. John Miltenburg, 1989. "Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems," Management Science, INFORMS, vol. 35(2), pages 192-207, February.
    4. Robert R. Inman & Robert L. Bulfin, 1991. "Note---Sequencing JIT Mixed-Model Assembly Lines," Management Science, INFORMS, vol. 37(7), pages 901-904, July.
    5. Joaquín Bautista & Ramon Companys & Albert Corominas, 1997. "Modelling and solving the production rate variation problem (PRVP)," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 5(2), pages 221-239, December.
    6. Amotz Bar-Noy & Randeep Bhatia & Joseph (Seffi) Naor & Baruch Schieber, 2002. "Minimizing Service and Operation Costs of Periodic Scheduling," Mathematics of Operations Research, INFORMS, vol. 27(3), pages 518-544, August.
    7. Srinivas Bollapragada & Michael R. Bussieck & Suman Mallik, 2004. "Scheduling Commercial Videotapes in Broadcast Television," Operations Research, INFORMS, vol. 52(5), pages 679-689, October.
    8. Kubiak, Wieslaw, 1993. "Minimizing variation of production rates in just-in-time systems: A survey," European Journal of Operational Research, Elsevier, vol. 66(3), pages 259-271, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ranaboldo, Matteo & Lega, Bruno Domenech & Ferrenbach, David Vilar & Ferrer-Martí, Laia & Moreno, Rafael Pastor & García-Villoria, Alberto, 2014. "Renewable energy projects to electrify rural communities in Cape Verde," Applied Energy, Elsevier, vol. 118(C), pages 280-291.
    2. Albert Corominas & Alberto García-Villoria & Rafael Pastor, 2013. "Metaheuristic algorithms hybridised with variable neighbourhood search for solving the response time variability problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 21(2), pages 296-312, July.
    3. Núñez-del-Toro, Cristina & Fernández, Elena & Kalcsics, Jörg & Nickel, Stefan, 2016. "Scheduling policies for multi-period services," European Journal of Operational Research, Elsevier, vol. 251(3), pages 751-770.
    4. García-Villoria, Alberto & Salhi, Said & Corominas, Albert & Pastor, Rafael, 2011. "Hyper-heuristic approaches for the response time variability problem," European Journal of Operational Research, Elsevier, vol. 211(1), pages 160-169, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
    2. García-Villoria, Alberto & Salhi, Said & Corominas, Albert & Pastor, Rafael, 2011. "Hyper-heuristic approaches for the response time variability problem," European Journal of Operational Research, Elsevier, vol. 211(1), pages 160-169, May.
    3. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    4. García-Villoria, Alberto & Pastor, Rafael, 2010. "Solving the response time variability problem by means of a genetic algorithm," European Journal of Operational Research, Elsevier, vol. 202(2), pages 320-327, April.
    5. Ding, Fong-Yuen & Zhu, Jin & Sun, Hui, 2006. "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives," International Journal of Production Economics, Elsevier, vol. 102(1), pages 108-131, July.
    6. Albert Corominas & Alberto García-Villoria & Rafael Pastor, 2013. "Metaheuristic algorithms hybridised with variable neighbourhood search for solving the response time variability problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 21(2), pages 296-312, July.
    7. Andreas Drexl & Alf Kimms, 2001. "Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints," Management Science, INFORMS, vol. 47(3), pages 480-491, March.
    8. Matthießen, Lars & Drexl, Andreas & Kimms, Alf, 2000. "Constraint propagation algorithms for the car sequencing problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 531, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    9. Fliedner, Malte & Boysen, Nils, 2008. "Solving the car sequencing problem via Branch & Bound," European Journal of Operational Research, Elsevier, vol. 191(3), pages 1023-1042, December.
    10. Lebacque, Vassilissa & Jost, Vincent & Brauner, Nadia, 2007. "Simultaneous optimization of classical objectives in JIT scheduling," European Journal of Operational Research, Elsevier, vol. 182(1), pages 29-39, October.
    11. N. Brauner & Y. Crama & A. Grigoriev & J. Klundert, 2005. "A Framework for the Complexity of High-Multiplicity Scheduling Problems," Journal of Combinatorial Optimization, Springer, vol. 9(3), pages 313-323, May.
    12. Drexl, Andreas & Jordan, Carsten, 1994. "Materialflußorientierte Produktionssteuerung bei Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 362, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    13. Steiner, George & Yeomans, Julian Scott, 1996. "Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging," European Journal of Operational Research, Elsevier, vol. 95(1), pages 38-52, November.
    14. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    15. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "The product rate variation problem and its relevance in real world mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 197(2), pages 818-824, September.
    16. Zhu, Jin & Ding, Fong-Yuen, 2000. "A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 127(1), pages 203-216, November.
    17. Bautista, Joaquin & Companys, Ramon & Corominas, Albert, 2000. "Note on cyclic sequences in the product rate variation problem," European Journal of Operational Research, Elsevier, vol. 124(3), pages 468-477, August.
    18. Bautista, J. & Companys, R. & Corominas, A., 1996. "Heuristics and exact algorithms for solving the Monden problem," European Journal of Operational Research, Elsevier, vol. 88(1), pages 101-113, January.
    19. Aigbedo, Henry, 2007. "An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain," European Journal of Operational Research, Elsevier, vol. 181(2), pages 704-715, September.
    20. Balinski, Michel & Ramirez, Victoriano, 1999. "Parametric methods of apportionment, rounding and production," Mathematical Social Sciences, Elsevier, vol. 37(2), pages 107-122, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:200:y:2010:i:2:p:347-357. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.