The Effect of Workload Dependent Due-Dates on Job Shop Performance

Author

Listed:
  • J. W. M. Bertrand

    (Eindhoven University of Technology, Eindhoven, The Netherlands)

Abstract

This study explores the due-date performance of job shop control systems which base job due dates on a time-phased representation of the workload and the machine capacity in the shop. The performance is measured by the mean and the standard deviation of the lateness. Two parameters are used to vary the functioning of the due-date assignment system: a minimum allowance for waiting, denoted by SL, and a maximum fraction of the available capacity allowed for loading, denoted by CLL. The system increases the waiting lime allowance if congestion is observed when loading a new job. The capability of the system to observe congestion is determined by the parameters CLL and SL. Simulation experiments are used to investigate the performance of the assignment system. It is shown that the assignment system performs quite well with respect to reducing the standard deviation of the lateness; the performance is not very sensitive however to the parameter values used; with an expected capacity utilization of 90%, CLL should be set between 0.80 and 1.00 times the mean available capacity and SL should be set between 0.55 and 0.90 times the mean operation waiting time in the shop. The assignment system may also perform well with respect to controlling the mean lateness. If SL is set between 0.55 and 0.75 times the mean expected waiting time in the shop, a constant mean lateness is obtained independent of the utilization of the shop if CLL is set between 0.70 and 0.80 times of the mean available capacity. However, the mean lateness turns out to be quite sensitive to variations in the job-mix of the workload. Finally it is shown that if the values of the assignment parameters are adequate, the mean job lateness is independent of the number of operations in a job. This property can be used to monitor the correctness of the parameter values.

Suggested Citation

  • J. W. M. Bertrand, 1983. "The Effect of Workload Dependent Due-Dates on Job Shop Performance," Management Science, INFORMS, vol. 29(7), pages 799-816, July.
  • Handle: RePEc:inm:ormnsc:v:29:y:1983:i:7:p:799-816
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.29.7.799
    Download Restriction: no

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:29:y:1983:i:7:p:799-816. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Mirko Janc). General contact details of provider: http://edirc.repec.org/data/inforea.html .

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.