IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v190y2019ic20.html
   My bibliography  Save this article

Portfolio optimization of safety measures for the prevention of time-dependent accident scenarios

Author

Listed:
  • Mancuso, A.
  • Compare, M.
  • Salo, A.
  • Zio, E.

Abstract

This paper presents a methodology to support the selection of optimal portfolios of preventive safety measures for time-dependent accident scenarios. This methodology captures the dynamics of accident scenarios through Dynamic Bayesian Networks which represent the temporal evolution of component failures that can lead to system failure. An optimization model is presented to determine all Pareto optimal portfolios for which the residual risk of the system at different time stages is minimized, subject to budget and technical constraints on the set of feasible portfolios. The resulting portfolios are then analyzed to support the optimal selection of preventive safety measures. We also develop a computationally efficient algorithm for solving the multi-objective optimization model. The method is illustrated by revisiting the accident scenario of a vapour cloud ignition which occurred at Universal Form Clamp in Bellwood (Illinois, U.S.) on 14 June 2006. Results are presented for different cost levels of implementing preventive safety measures, which provides additional management insights.

Suggested Citation

  • Mancuso, A. & Compare, M. & Salo, A. & Zio, E., 2019. "Portfolio optimization of safety measures for the prevention of time-dependent accident scenarios," Reliability Engineering and System Safety, Elsevier, vol. 190(C), pages 1-1.
  • Handle: RePEc:eee:reensy:v:190:y:2019:i:c:20
    DOI: 10.1016/j.ress.2019.106500
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832018300942
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2019.106500?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Khakzad, Nima & Khan, Faisal & Amyotte, Paul, 2013. "Risk-based design of process systems using discrete-time Bayesian networks," Reliability Engineering and System Safety, Elsevier, vol. 109(C), pages 5-17.
    2. Mancuso, A. & Compare, M. & Salo, A. & Zio, E., 2017. "Portfolio optimization of safety measures for reducing risks in nuclear systems," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 20-29.
    3. Edwards, Ward & Barron, F. Hutton, 1994. "SMARTS and SMARTER: Improved Simple Methods for Multiattribute Utility Measurement," Organizational Behavior and Human Decision Processes, Elsevier, vol. 60(3), pages 306-325, December.
    4. Zio, Enrico & Di Maio, Francesco, 2010. "A data-driven fuzzy approach for predicting the remaining useful life in dynamic failure scenarios of a nuclear system," Reliability Engineering and System Safety, Elsevier, vol. 95(1), pages 49-57.
    5. Janne Gustafsson & Ahti Salo, 2005. "Contingent Portfolio Programming for the Management of Risky Projects," Operations Research, INFORMS, vol. 53(6), pages 946-956, December.
    6. Kabir, Golam & Tesfamariam, Solomon & Francisque, Alex & Sadiq, Rehan, 2015. "Evaluating risk of water mains failure using a Bayesian belief network model," European Journal of Operational Research, Elsevier, vol. 240(1), pages 220-234.
    7. Liesiö, Juuso & Mild, Pekka & Salo, Ahti, 2008. "Robust portfolio modeling with incomplete cost information and project interdependencies," European Journal of Operational Research, Elsevier, vol. 190(3), pages 679-695, November.
    8. Liesio, Juuso & Mild, Pekka & Salo, Ahti, 2007. "Preference programming for robust portfolio modeling and project selection," European Journal of Operational Research, Elsevier, vol. 181(3), pages 1488-1505, September.
    9. Poropudas, Jirka & Virtanen, Kai, 2011. "Simulation metamodeling with dynamic Bayesian networks," European Journal of Operational Research, Elsevier, vol. 214(3), pages 644-655, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Euan Barlow & Alec Morton & Saudamini Dabak & Sven Engels & Wanrudee Isaranuwatchai & Yot Teerawattananon & Kalipso Chalkidou, 2022. "What is the value of explicit priority setting for health interventions? A simulation study," Health Care Management Science, Springer, vol. 25(3), pages 460-483, September.
    2. Mancuso, A. & Compare, M. & Salo, A. & Zio, E., 2021. "Optimal Prognostics and Health Management-driven inspection and maintenance strategies for industrial systems," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
    3. Xing, Jinduo & Zeng, Zhiguo & Zio, Enrico, 2020. "Joint optimization of safety barriers for enhancing business continuity of nuclear power plants against steam generator tube ruptures accidents," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
    4. Salo, Ahti & Andelmin, Juho & Oliveira, Fabricio, 2022. "Decision programming for mixed-integer multi-stage optimization under uncertainty," European Journal of Operational Research, Elsevier, vol. 299(2), pages 550-565.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Marttunen, Mika & Haara, Arto & Hjerppe, Turo & Kurttila, Mikko & Liesiö, Juuso & Mustajoki, Jyri & Saarikoski, Heli & Tolvanen, Anne, 2023. "Parallel and comparative use of three multicriteria decision support methods in an environmental portfolio problem," European Journal of Operational Research, Elsevier, vol. 307(2), pages 842-859.
    2. Compare, Michele & Bellani, Luca & Zio, Enrico, 2019. "Optimal allocation of prognostics and health management capabilities to improve the reliability of a power transmission network," Reliability Engineering and System Safety, Elsevier, vol. 184(C), pages 164-180.
    3. Liesiö, Juuso & Salo, Ahti, 2012. "Scenario-based portfolio selection of investment projects with incomplete probability and utility information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 162-172.
    4. Tom Pape, 2020. "Value of agreement in decision analysis: Concept, measures and application," Papers 2012.13816, arXiv.org.
    5. Salo, Ahti & Andelmin, Juho & Oliveira, Fabricio, 2022. "Decision programming for mixed-integer multi-stage optimization under uncertainty," European Journal of Operational Research, Elsevier, vol. 299(2), pages 550-565.
    6. Liesiö, Juuso & Kallio, Markku & Argyris, Nikolaos, 2023. "Incomplete risk-preference information in portfolio decision analysis," European Journal of Operational Research, Elsevier, vol. 304(3), pages 1084-1098.
    7. Pape, Tom, 2017. "Value of agreement in decision analysis: concept, measures and application," LSE Research Online Documents on Economics 68682, London School of Economics and Political Science, LSE Library.
    8. Vilkkumaa, Eeva & Liesiö, Juuso & Salo, Ahti, 2014. "Optimal strategies for selecting project portfolios using uncertain value estimates," European Journal of Operational Research, Elsevier, vol. 233(3), pages 772-783.
    9. Panos Xidonas & Haris Doukas & George Mavrotas & Olena Pechak, 2016. "Environmental corporate responsibility for investments evaluation: an alternative multi-objective programming model," Annals of Operations Research, Springer, vol. 247(2), pages 395-413, December.
    10. Baker, Erin & Bosetti, Valentina & Salo, Ahti, 2016. "Finding Common Ground when Experts Disagree: Belief Dominance over Portfolios of Alternatives," MITP: Mitigation, Innovation and Transformation Pathways 243147, Fondazione Eni Enrico Mattei (FEEM).
    11. Ali Tlili & Oumaima Khaled & Vincent Mousseau & Wassila Ouerdane, 2023. "Interactive portfolio selection involving multicriteria sorting models," Annals of Operations Research, Springer, vol. 325(2), pages 1169-1195, June.
    12. Barbati, Maria & Greco, Salvatore & Kadziński, Miłosz & Słowiński, Roman, 2018. "Optimization of multiple satisfaction levels in portfolio decision analysis," Omega, Elsevier, vol. 78(C), pages 192-204.
    13. Yael Grushka-Cockayne & Bert De Reyck & Zeger Degraeve, 2008. "An Integrated Decision-Making Approach for Improving European Air Traffic Management," Management Science, INFORMS, vol. 54(8), pages 1395-1409, August.
    14. Liesiö, Juuso & Andelmin, Juho & Salo, Ahti, 2020. "Efficient allocation of resources to a portfolio of decision making units," European Journal of Operational Research, Elsevier, vol. 286(2), pages 619-636.
    15. Mikko Kurttila & Arto Haara & Artti Juutinen & Jouni Karhu & Paavo Ojanen & Jouni Pykäläinen & Miia Saarimaa & Oili Tarvainen & Sakari Sarkkola & Anne Tolvanen, 2020. "Applying a Multi-Criteria Project Portfolio Tool in Selecting Energy Peat Production Areas," Sustainability, MDPI, vol. 12(5), pages 1-16, February.
    16. Toppila, Antti & Salo, Ahti, 2017. "Binary decision diagrams for generating and storing non-dominated project portfolios with interval-valued project scores," European Journal of Operational Research, Elsevier, vol. 260(1), pages 244-254.
    17. Mancuso, A. & Compare, M. & Salo, A. & Zio, E. & Laakso, T., 2016. "Risk-based optimization of pipe inspections in large underground networks with imprecise information," Reliability Engineering and System Safety, Elsevier, vol. 152(C), pages 228-238.
    18. Marques, Adriana Cavalcante & Frej, Eduarda Asfora & de Almeida, Adiel Teixeira, 2022. "Multicriteria decision support for project portfolio selection with the FITradeoff method," Omega, Elsevier, vol. 111(C).
    19. Baker, Erin & Bosetti, Valentina & Salo, Ahti, 2020. "Robust portfolio decision analysis: An application to the energy research and development portfolio problem," European Journal of Operational Research, Elsevier, vol. 284(3), pages 1107-1120.
    20. Harju, Mikko & Liesiö, Juuso & Virtanen, Kai, 2019. "Spatial multi-attribute decision analysis: Axiomatic foundations and incomplete preference information," European Journal of Operational Research, Elsevier, vol. 275(1), pages 167-181.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:190:y:2019:i:c:20. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.