IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v90y2004i3p281-294.html
   My bibliography  Save this article

Integrating resource and production decisions in a simple multi-stage assembly system

Author

Listed:
  • Dellaert, Nico
  • de Kok, Ton

Abstract

No abstract is available for this item.

Suggested Citation

  • Dellaert, Nico & de Kok, Ton, 2004. "Integrating resource and production decisions in a simple multi-stage assembly system," International Journal of Production Economics, Elsevier, vol. 90(3), pages 281-294, August.
  • Handle: RePEc:eee:proeco:v:90:y:2004:i:3:p:281-294
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00304-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Christopher S. Tang, 1992. "Note---Controlling Inventories in an Acyclic Assembly System," Management Science, INFORMS, vol. 38(5), pages 743-750, May.
    2. Diks, E. B. & de Kok, A. G., 1999. "Computational results for the control of a divergent N-echelon inventory system," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 327-336, March.
    3. Pinker, Edieal J. & Larson, Richard C., 2003. "Optimizing the use of contingent labor when demand is uncertain," European Journal of Operational Research, Elsevier, vol. 144(1), pages 39-55, January.
    4. de Kok, Ton G. & Visschers, Jeremy W. C. H., 1999. "Analysis of assembly systems with service level constraints," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 313-326, March.
    5. N. P. Dellaert & A. G. De Kok & Wang Wei, 2000. "Push and pull strategies in multi‐stage assembly systems," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 54(2), pages 175-189, July.
    6. Ma, Shihua & Wang, Wei & Liu, Liming, 2002. "Commonality and postponement in multistage assembly systems," European Journal of Operational Research, Elsevier, vol. 142(3), pages 523-538, November.
    7. Joseph M. Milner & Edieal J. Pinker, 2001. "Contingent Labor Contracting Under Demand and Supply Uncertainty," Management Science, INFORMS, vol. 47(8), pages 1046-1062, August.
    8. Kaj Rosling, 1989. "Optimal Inventory Policies for Assembly Systems Under Random Demands," Operations Research, INFORMS, vol. 37(4), pages 565-579, August.
    9. Fangruo Chen, 2000. "Optimal Policies for Multi-Echelon Inventory Problems with Batch Ordering," Operations Research, INFORMS, vol. 48(3), pages 376-389, June.
    10. Diks, E. B. & de Kok, A. G., 1998. "Optimal control of a divergent multi-echelon inventory system," European Journal of Operational Research, Elsevier, vol. 111(1), pages 75-97, November.
    11. Wild, Bernhard & Schneewei, Christoph, 1993. "Manpower capacity planning -- A hierarchical approach," International Journal of Production Economics, Elsevier, vol. 30(1), pages 95-106, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
    2. Jammernegg, Werner & Reiner, Gerald, 2007. "Performance improvement of supply chain processes by coordinated inventory and capacity management," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 183-190, July.
    3. Mayorga, Maria E. & Ahn, Hyun-Soo, 2011. "Joint management of capacity and inventory in make-to-stock production systems with multi-class demand," European Journal of Operational Research, Elsevier, vol. 212(2), pages 312-324, July.
    4. Fernandes, Rui & Gouveia, Borges & Pinho, Carlos, 2013. "A real options approach to labour shifts planning under different service level targets," European Journal of Operational Research, Elsevier, vol. 231(1), pages 182-189.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Susan Feng Lu & Lauren Xiaoyuan Lu, 2017. "Do Mandatory Overtime Laws Improve Quality? Staffing Decisions and Operational Flexibility of Nursing Homes," Management Science, INFORMS, vol. 63(11), pages 3566-3585, November.
    3. Zümbül Atan & Ton de Kok & Nico P. Dellaert & Richard van Boxel & Fred Janssen, 2016. "Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 122-140, February.
    4. Techawiboonwong, Atthawit & Yenradee, Pisal & Das, Sanchoy K., 2006. "A master scheduling model with skilled and unskilled temporary workers," International Journal of Production Economics, Elsevier, vol. 103(2), pages 798-809, October.
    5. Karaarslan, Gönül A. & Atan, Zümbül & de Kok, Ton & Kiesmüller, Gudrun P., 2018. "Optimal and heuristic policies for assemble-to-order systems with different review periods," European Journal of Operational Research, Elsevier, vol. 271(1), pages 80-96.
    6. Sandeep Rath & Kumar Rajaram, 2022. "Staff Planning for Hospitals with Implicit Cost Estimation and Stochastic Optimization," Production and Operations Management, Production and Operations Management Society, vol. 31(3), pages 1271-1289, March.
    7. Karaarslan, A.G. & Kiesmüller, G.P. & de Kok, A.G., 2013. "Analysis of an assemble-to-order system with different review periods," International Journal of Production Economics, Elsevier, vol. 143(2), pages 335-341.
    8. Marty Stuebs & Li Sun, 2010. "Business Reputation and Labor Efficiency, Productivity, and Cost," Journal of Business Ethics, Springer, vol. 96(2), pages 265-283, October.
    9. Albrecht, Martin, 2014. "Determining near optimal base-stock levels in two-stage general inventory systems," European Journal of Operational Research, Elsevier, vol. 232(2), pages 342-349.
    10. Gregory A. DeCroix, 2006. "Optimal Policy for a Multiechelon Inventory System with Remanufacturing," Operations Research, INFORMS, vol. 54(3), pages 532-543, June.
    11. Olof Stenius & Ayşe Gönül Karaarslan & Johan Marklund & A. G. de Kok, 2016. "Exact Analysis of Divergent Inventory Systems with Time-Based Shipment Consolidation and Compound Poisson Demand," Operations Research, INFORMS, vol. 64(4), pages 906-921, August.
    12. repec:dau:papers:123456789/4010 is not listed on IDEAS
    13. Huaxiao Shen & Tian Tian & Han Zhu, 2019. "A Two-Echelon Inventory System with a Minimum Order Quantity Requirement," Sustainability, MDPI, vol. 11(18), pages 1-22, September.
    14. Dellaert, Nico & Jeunet, Jully & Mincsovics, Gergely, 2011. "Budget allocation for permanent and contingent capacity under stochastic demand," International Journal of Production Economics, Elsevier, vol. 131(1), pages 128-138, May.
    15. Xiuli Chao & Sean X. Zhou, 2009. "Optimal Policy for a Multiechelon Inventory System with Batch Ordering and Fixed Replenishment Intervals," Operations Research, INFORMS, vol. 57(2), pages 377-390, April.
    16. Saravanan Kesavan & Bradley R. Staats & Wendell Gilland, 2014. "Volume Flexibility in Services: The Costs and Benefits of Flexible Labor Resources," Management Science, INFORMS, vol. 60(8), pages 1884-1906, August.
    17. Yao Zhao, 2008. "Evaluation and Optimization of Installation Base-Stock Policies in Supply Chains with Compound Poisson Demand," Operations Research, INFORMS, vol. 56(2), pages 437-452, April.
    18. Nasuh Buyukkaramikli & Henny Ooijen & J. Bertrand, 2015. "Integrating inventory control and capacity management at a maintenance service provider," Annals of Operations Research, Springer, vol. 231(1), pages 185-206, August.
    19. Yeu-Shiang Huang & Hau-Wen Lo & Jyh-Wen Ho, 2021. "Effects of component commonality and perishability on inventory control in assemble-to-order systems," Operational Research, Springer, vol. 21(1), pages 205-229, March.
    20. Eryn Juan He & Joel Goh, 2022. "Profit or Growth? Dynamic Order Allocation in a Hybrid Workforce," Management Science, INFORMS, vol. 68(8), pages 5891-5906, August.
    21. Woonghee Tim Huh & Ganesh Janakiraman, 2012. "Technical Note---On Optimal Policies for Inventory Systems with Batch Ordering," Operations Research, INFORMS, vol. 60(4), pages 797-802, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:90:y:2004:i:3:p:281-294. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.