IDEAS home Printed from https://ideas.repec.org/a/bla/stanee/v54y2000i2p175-189.html
   My bibliography  Save this article

Push and pull strategies in multi‐stage assembly systems

Author

Listed:
  • N. P. Dellaert
  • A. G. De Kok
  • Wang Wei

Abstract

In convergent multi‐stage systems usually a pull strategy is assumed, where demand at the end stock‐point triggers demands (or production) at the proceeding stock‐point, whereas in the push strategy demand is triggered at the initial stock‐point. We will extensively describe the calculation procedure for the push strategy. For analyzing the pull strategy we will use existing methods. The equivalence and differences between these two strategies will be illustrated for a two‐stage assembly case.

Suggested Citation

  • N. P. Dellaert & A. G. De Kok & Wang Wei, 2000. "Push and pull strategies in multi‐stage assembly systems," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 54(2), pages 175-189, July.
  • Handle: RePEc:bla:stanee:v:54:y:2000:i:2:p:175-189
    DOI: 10.1111/1467-9574.00135
    as

    Download full text from publisher

    File URL: https://doi.org/10.1111/1467-9574.00135
    Download Restriction: no

    File URL: https://libkey.io/10.1111/1467-9574.00135?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dellaert, Nico & de Kok, Ton, 2004. "Integrating resource and production decisions in a simple multi-stage assembly system," International Journal of Production Economics, Elsevier, vol. 90(3), pages 281-294, August.
    2. Taş, D. & Gendreau, M. & Dellaert, N. & van Woensel, T. & de Kok, A.G., 2014. "Vehicle routing with soft time windows and stochastic travel times: A column generation and branch-and-price solution approach," European Journal of Operational Research, Elsevier, vol. 236(3), pages 789-799.
    3. Taş, Duygu & Gendreau, Michel & Jabali, Ola & Jans, Raf, 2019. "A capacitated lot sizing problem with stochastic setup times and overtime," European Journal of Operational Research, Elsevier, vol. 273(1), pages 146-159.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bla:stanee:v:54:y:2000:i:2:p:175-189. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: http://www.blackwellpublishing.com/journal.asp?ref=0039-0402 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.