IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v281y2025ics0925527325000167.html
   My bibliography  Save this article

Contracting for system availability with zero ownership cost via redundancy, maintenance and repairable inventory

Author

Listed:
  • Jin, Tongdan

Abstract

Though various types of availability-based contract models have been developed, there is a lack of studies in which reliability-redundancy and maintenance service logistics are jointly considered. This paper proposes a principal-agent model to manage performance-based contract for zero ownership cost and no moral hazard. The equipment supplier plays as an agent who determines redundant units, maintenance time, spares inventory and repair capacity to maximize the service profit. The customer plays as a principal who stipulates system availability target and the payment scheme for attaining zero cost of asset ownership. The novelty of the model lies in two aspects: a) it represents a first-of-its-kind in designing system availability-based contract in an integrated redundancy-maintenance-inventory optimization framework; and b) the customer bears zero ownership cost while the supplier's profit margin is guaranteed. Three major findings are obtained. First, the supplier's actions are proved to be fully observable to the customer, hence a first-best contract solution is obtained. Second, if the customer imposes the cost limit on individual systems, the supplier opts to increase the system availability for reaping a larger profit. Third, one emergency repair server is generally sufficient to remedy the spares stockout situation regardless of the fleet size.

Suggested Citation

  • Jin, Tongdan, 2025. "Contracting for system availability with zero ownership cost via redundancy, maintenance and repairable inventory," International Journal of Production Economics, Elsevier, vol. 281(C).
  • Handle: RePEc:eee:proeco:v:281:y:2025:i:c:s0925527325000167
    DOI: 10.1016/j.ijpe.2025.109531
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527325000167
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2025.109531?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    References listed on IDEAS

    as
    1. Jing-Sheng Song & Yue Zhang, 2020. "Stock or Print? Impact of 3-D Printing on Spare Parts Logistics," Management Science, INFORMS, vol. 66(9), pages 3860-3878, September.
    2. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    3. Sleptchenko, Andrei & van der Heijden, Matthieu, 2016. "Joint optimization of redundancy level and spare part inventories," Reliability Engineering and System Safety, Elsevier, vol. 153(C), pages 64-74.
    4. Zheng, Meimei & Lin, Jie & Xia, Tangbin & Liu, Yu & Pan, Ershun, 2023. "Joint condition-based maintenance and spare provisioning policy for a K-out-of-N system with failures during inspection intervals," European Journal of Operational Research, Elsevier, vol. 308(3), pages 1220-1232.
    5. Shimon Bitton & Izack Cohen & Morris Cohen, 2019. "Joint repair sourcing and stocking policies for repairables using Erlang-A and Erlang-B queueing models," IISE Transactions, Taylor & Francis Journals, vol. 51(10), pages 1151-1166, October.
    6. Wang, Yukun & Gao, Weizheng & Li, Xiaopeng & Liu, Yiliu, 2024. "Joint optimization of performance-based contracting, condition-based maintenance and spare parts inventory for degrading production systems," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
    7. Pradipta Patra & U. Dinesh Kumar, 2024. "Availability contracts under hierarchical maintenance," Annals of Operations Research, Springer, vol. 340(1), pages 389-423, September.
    8. Wang, Wenbin, 2012. "A stochastic model for joint spare parts inventory and planned maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 216(1), pages 127-139.
    9. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    10. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
    11. Tongdan Jin & Wenjin Zhu & Ziqi Jiang, 2023. "Integration of Reliability Design, Installed Base, and After-Sales Services for System Availability," Springer Series in Reliability Engineering, in: Yu Liu & Dong Wang & Jinhua Mi & He Li (ed.), Advances in Reliability and Maintainability Methods and Engineering Applications, pages 239-263, Springer.
    12. Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
    13. D Nowicki & U D Kumar & H J Steudel & D Verma, 2008. "Spares provisioning under performance-based logistics contract: profit-centric approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(3), pages 342-352, March.
    14. Kostas Selviaridis & Finn Wynstra, 2015. "Performance-based contracting: a literature review and future research directions," International Journal of Production Research, Taylor & Francis Journals, vol. 53(12), pages 3505-3540, June.
    15. Coit, David W. & Zio, Enrico, 2019. "The evolution of system reliability optimization," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    16. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    17. Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2014. "Integrated spare parts logistics and operations planning for maintenance service providers," International Journal of Production Economics, Elsevier, vol. 158(C), pages 44-53.
    18. Alaswad, Suzan & Xiang, Yisha, 2017. "A review on condition-based maintenance optimization models for stochastically deteriorating system," Reliability Engineering and System Safety, Elsevier, vol. 157(C), pages 54-63.
    19. Jing Cai & Yibing Yin & Li Zhang & Xi Chen, 2017. "Joint Optimization of Preventive Maintenance and Spare Parts Inventory with Appointment Policy," Mathematical Problems in Engineering, Hindawi, vol. 2017, pages 1-12, March.
    20. Xia, Tangbin & Cao, Lei & Xu, Yuhui & Zhang, Kaigan & Chen, Zhen & Pan, Ershun & Xi, Lifeng, 2024. "Multi-level maintenance and inventory joint optimization for a k-out-of-n hyper-system considering the selection of suppliers with incentive discount policies," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    21. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
    22. Li, Ai Qiang & Kumar, Maneesh & Claes, Björn & Found, Pauline, 2020. "The state-of-the-art of the theory on Product-Service Systems," International Journal of Production Economics, Elsevier, vol. 222(C).
    23. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    24. Wang, Jingjing & Zhao, Xian & Guo, Xiaoxin, 2019. "Optimizing wind turbine's maintenance policies under performance-based contract," Renewable Energy, Elsevier, vol. 135(C), pages 626-634.
    25. Hu, Yang & Miao, Xuewen & Si, Yong & Pan, Ershun & Zio, Enrico, 2022. "Prognostics and health management: A review from the perspectives of design, development and decision," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
    26. Van Horenbeek, Adriaan & Buré, Jasmine & Cattrysse, Dirk & Pintelon, Liliane & Vansteenwegen, Pieter, 2013. "Joint maintenance and inventory optimization systems: A review," International Journal of Production Economics, Elsevier, vol. 143(2), pages 499-508.
    27. Peiravi, Abdossaber & Nourelfath, Mustapha & Zanjani, Masoumeh Kazemi, 2022. "Redundancy strategies assessment and optimization of k-out-of-n systems based on Markov chains and genetic algorithms," Reliability Engineering and System Safety, Elsevier, vol. 221(C).
    28. Joachim Arts & Rob Basten, 2018. "Design of multi-component periodic maintenance programs with single-component models," IISE Transactions, Taylor & Francis Journals, vol. 50(7), pages 606-615, July.
    29. Settanni, Ettore & Thenent, Nils Elias & Newnes, Linda B. & Parry, Glenn & Goh, Yee Mey, 2017. "Mapping a product-service-system delivering defence avionics availability," International Journal of Production Economics, Elsevier, vol. 186(C), pages 21-32.
    30. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
    31. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2009. "Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems," International Journal of Production Economics, Elsevier, vol. 118(1), pages 260-268, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wang, Yukun & Gao, Weizheng & Li, Xiaopeng & Liu, Yiliu, 2024. "Joint optimization of performance-based contracting, condition-based maintenance and spare parts inventory for degrading production systems," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
    2. Pradipta Patra & U. Dinesh Kumar, 2024. "Availability contracts under hierarchical maintenance," Annals of Operations Research, Springer, vol. 340(1), pages 389-423, September.
    3. Yujie Zhang & Yukun Wang & Xiaopeng Li & Yiliu Liu & Weizheng Gao, 2024. "Condition-based maintenance optimization for deteriorating systems considering performance-based contracting and destructive inspections," Journal of Risk and Reliability, , vol. 238(2), pages 247-259, April.
    4. Zheng, Meimei & Lin, Jie & Xia, Tangbin & Liu, Yu & Pan, Ershun, 2023. "Joint condition-based maintenance and spare provisioning policy for a K-out-of-N system with failures during inspection intervals," European Journal of Operational Research, Elsevier, vol. 308(3), pages 1220-1232.
    5. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    6. Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
    7. Zhao, Sangqi & Wei, Yian & Cheng, Yao & Li, Yang, 2025. "A state-specific joint size, maintenance, and inventory policy for a k-out-of-n load-sharing system subject to self-announcing failures," Reliability Engineering and System Safety, Elsevier, vol. 257(PB).
    8. de Jonge, Bram & Scarf, Philip A., 2020. "A review on maintenance optimization," European Journal of Operational Research, Elsevier, vol. 285(3), pages 805-824.
    9. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    10. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    11. Zhang, Wenyu & He, Shuguang & Zhang, Xiaohong & Zhao, Xing, 2024. "Joint optimization of job scheduling, condition-based maintenance planning, and spare parts ordering for degrading production systems," Reliability Engineering and System Safety, Elsevier, vol. 252(C).
    12. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
    13. KarabaÄŸ, Oktay & Eruguz, Ayse Sena & Basten, Rob, 2020. "Integrated optimization of maintenance interventions and spare part selection for a partially observable multi-component system," Reliability Engineering and System Safety, Elsevier, vol. 200(C).
    14. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    15. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    16. Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
    17. Zahedi-Hosseini, Farhad & Scarf, Philip & Syntetos, Aris, 2017. "Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 306-316.
    18. Boujarif, Abdelhamid & Coit, David W. & Jouini, Oualid & Zeng, Zhiguo & Heidsieck, Robert, 2025. "Repairing smarter: Opportunistic maintenance for a closed-loop supply chain with spare parts dependency," Reliability Engineering and System Safety, Elsevier, vol. 255(C).
    19. Wang, Jingjing & Qiu, Qingan & Wang, Huanhuan, 2021. "Joint optimization of condition-based and age-based replacement policy and inventory policy for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    20. Zheng, Meimei & Ye, Hongqing & Wang, Dong & Pan, Ershun, 2021. "Joint Optimization of Condition-Based Maintenance and Spare Parts Orders for Multi-Unit Systems with Dual Sourcing," Reliability Engineering and System Safety, Elsevier, vol. 210(C).

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:281:y:2025:i:c:s0925527325000167. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.