Dispute boards in Turkey for infrastructure projects
Author
Abstract
Suggested Citation
DOI: 10.1016/j.jup.2019.100958
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Bruzelius, Nils & Flyvbjerg, Bent & Rothengatter, Werner, 2002. "Big decisions, big risks. Improving accountability in mega projects," Transport Policy, Elsevier, vol. 9(2), pages 143-154, April.
- Flyvbjerg,Bent & Bruzelius,Nils & Rothengatter,Werner, 2003. "Megaprojects and Risk," Cambridge Books, Cambridge University Press, number 9780521009461, October.
- Bert van Wee, 2007. "Large Infrastructure Projects: A Review of the Quality of Demand Forecasts and Cost Estimations," Environment and Planning B, , vol. 34(4), pages 611-625, August.
- Jacqueline de Bony, 2010. "Project Management and National Culture: A Dutch-French Case Study," Post-Print hal-00740138, HAL.
- Peter Fenn & David Lowe & Christopher Speck, 1997. "Conflict and dispute in construction," Construction Management and Economics, Taylor & Francis Journals, vol. 15(6), pages 513-518.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Macário, Rosário & Ribeiro, Joana & Costa, Joana Duarte, 2015. "Understanding pitfalls in the application of PPPs in transport infrastructure in Portugal," Transport Policy, Elsevier, vol. 41(C), pages 90-99.
- Cantarelli, C.C. & Molin, E.J.E. & van Wee, B. & Flyvbjerg, B., 2012.
"Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases,"
Transport Policy, Elsevier, vol. 22(C), pages 49-56.
- Chantal C. Cantarelli & Eric J. E. Molin & Bert van Wee & Bent Flyvbjerg, 2013. "Characteristics of Cost Overruns for Dutch Transport Infrastructure Projects and the Importance of the Decision to Build and Project Phases," Papers 1307.2178, arXiv.org, revised Jan 2015.
- Brookes, Naomi J. & Locatelli, Giorgio, 2015. "Power plants as megaprojects: Using empirics to shape policy, planning, and construction management," Utilities Policy, Elsevier, vol. 36(C), pages 57-66.
- Locatelli, Giorgio & Invernizzi, Diletta Colette & Brookes, Naomi J., 2017. "Project characteristics and performance in Europe: An empirical analysis for large transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 98(C), pages 108-122.
- Lehtonen, Markku, 2019. "Ecological Economics and Opening up of Megaproject Appraisal: Lessons From Megaproject Scholarship and Topics for a Research Programme," Ecological Economics, Elsevier, vol. 159(C), pages 148-156.
- Bert van Wee & Jan Anne Annema & Hugo Priemus, 2013. "Model building for infrastructure initiatives," Chapters, in: Peter Karl Kresl & Jaime Sobrino (ed.), Handbook of Research Methods and Applications in Urban Economies, chapter 17, pages 423-441, Edward Elgar Publishing.
- Andrius Montrimas & Jurgita Bruneckienė & Vaidas Gaidelys, 2021. "Beyond the Socio-Economic Impact of Transport Megaprojects," Sustainability, MDPI, vol. 13(15), pages 1-29, July.
- Josef Wijk & Itay Fischhendler, 2017. "The construction of urgency discourse around mega-projects: the Israeli case," Policy Sciences, Springer;Society of Policy Sciences, vol. 50(3), pages 469-494, September.
- Marcus Hübscher, 2022. "Planning behind Closed Doors: Unlocking Large-Scale Urban Development Projects Using the Stakeholder Approach on Tenerife, Spain," Land, MDPI, vol. 11(3), pages 1-25, March.
- Beria, Paolo & Grimaldi, Raffaele & Albalate, Daniel & Bel, Germà, 2018. "Delusions of success: Costs and demand of high-speed rail in Italy and Spain," Transport Policy, Elsevier, vol. 68(C), pages 63-79.
- Van Wee, Bert & Molin, Eric, 2012. "Transport and ethics: Dilemmas for CBA researchers. An interview-based study from the Netherlands," Transport Policy, Elsevier, vol. 24(C), pages 30-36.
- Geneviève Zembri-Mary & Virginie Engrand-Linder, 2023. "Urban planning law in the face of the Olympic challenge: Between innovation and criticism of exceptional urban regeneration," Local Economy, London South Bank University, vol. 38(4), pages 369-388, June.
- Schreiner, Lena & Madlener, Reinhard, 2022.
"Investing in power grid infrastructure as a flexibility option: A DSGE assessment for Germany,"
Energy Economics, Elsevier, vol. 107(C).
- Schreiner, Lena & Madlener, Reinhard, 2019. "Investing in power grid infrastructure as a flexibility option: A DSGE assessment for Germany," FCN Working Papers 11/2019, E.ON Energy Research Center, Future Energy Consumer Needs and Behavior (FCN), revised 01 Apr 2020.
- Ahsan Nawaz & Xing Su & Qaiser Mohi Ud Din & Muhammad Irslan Khalid & Muhammad Bilal & Syyed Adnan Raheel Shah, 2020. "Identification of the H&S (Health and Safety Factors) Involved in Infrastructure Projects in Developing Countries-A Sequential Mixed Method Approach of OLMT-Project," IJERPH, MDPI, vol. 17(2), pages 1-18, January.
- Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012.
"Geographical variation in project cost performance: the Netherlands versus worldwide,"
Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
- Chantal C. Cantarelli & Bent Flyvbjerg & S{o}ren L. Buhl, 2013. "Geographical Variation in Project Cost Performance: The Netherlands versus Worldwide," Papers 1307.2181, arXiv.org.
- Zhao, Na, 2019. "Managing interactive collaborative mega project supply chains under infectious risks," International Journal of Production Economics, Elsevier, vol. 218(C), pages 275-286.
- Michael Regan, 2013. "Public project procurement and the case for public–private partnerships," Chapters, in: John Farrar & David G. Mayes (ed.), Globalisation, the Global Financial Crisis and the State, chapter 8, pages 172-196, Edward Elgar Publishing.
- Holz-Rau, Christian & Scheiner, Joachim, 2011. "Safety and travel time in cost-benefit analysis: A sensitivity analysis for North Rhine-Westphalia," Transport Policy, Elsevier, vol. 18(2), pages 336-346, March.
- Leheis, Stéphanie, 2012. "High-speed train planning in France: Lessons from the Mediterranean TGV-line," Transport Policy, Elsevier, vol. 21(C), pages 37-44.
- Morgenroth, Edgar & FitzGerald, John & FitzGerald, John, 2006.
"Summary and Conclusions,"
Book Chapters, in: Morgenroth, Edgar (ed.),Ex-Ante Evaluation of the Investment Priorities for the National Development Plan 2007-2013, chapter 24, pages 317-333,
Economic and Social Research Institute (ESRI).
- Baker, Terence J. & FitzGerald, John & Honohan, Patrick & FitzGerald, John & Honohan, Patrick, 1996. "Summary and Conclusions," Book Chapters, in: Baker, Terence J. (ed.),Economic Implications for Ireland of EMU, chapter 12, pages 339-352, Economic and Social Research Institute (ESRI).
More about this item
Keywords
Dispute resolution; Dispute adjudication board; Dispute cases; Megaprojects; Turkey;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:juipol:v:60:y:2019:i:c:8. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.sciencedirect.com/journal/utilities-policy .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.