IDEAS home Printed from https://ideas.repec.org/a/eee/energy/v135y2017icp23-31.html

Efficiency evaluation of hydropower station operation: A case study of Longyangxia station in the Yellow River, China

Author

Listed:
  • Chang, Jianxia
  • Li, Yunyun
  • Yuan, Meng
  • Wang, Yimin

Abstract

Hydropower plays a major role in the Chinese electricity generation industry. It is of significant importance to perform efficiency evaluation of the economic operation in a power station, which can help promote better water resources management and create more benefits for power network. Therefore, the main goal of this study is to establish a set of evaluation indexes and investigate the evaluation method to assess the economic operation in a power station. Based on the operation chart, three evaluation indexes including the Relative Water Consumption Rate (RC), the Relative Hydropower Utilization Rate (RU), and the Relative Hydropower Utilization Increasing Rate (RI) were proposed. The Longyangxia power station, as the biggest peak regulation source in the Northwest Power Network in China and the largest reservoir in the Yellow River Basin, was selected to perform an efficiency evaluation of economic operation. The result showed that the economic operation of this power station was not reasonable with RC > 1, RU < 1 and RI < 0. And the rationality of the evaluation result was illustrated through analyzing the actual operation situation of the Longyangxia reservoir.

Suggested Citation

  • Chang, Jianxia & Li, Yunyun & Yuan, Meng & Wang, Yimin, 2017. "Efficiency evaluation of hydropower station operation: A case study of Longyangxia station in the Yellow River, China," Energy, Elsevier, vol. 135(C), pages 23-31.
  • Handle: RePEc:eee:energy:v:135:y:2017:i:c:p:23-31
    DOI: 10.1016/j.energy.2017.06.049
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0360544217310435
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.energy.2017.06.049?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    References listed on IDEAS

    as
    1. Huang, Hailun & Yan, Zheng, 2009. "Present situation and future prospect of hydropower in China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 13(6-7), pages 1652-1656, August.
    2. Hong, Lixuan & Zhou, Nan & Fridley, David & Raczkowski, Chris, 2013. "Assessment of China's renewable energy contribution during the 12th Five Year Plan," Energy Policy, Elsevier, vol. 62(C), pages 1533-1543.
    3. Inglesi-Lotz, Roula & Blignaut, James N., 2014. "Improving the electricity efficiency in South Africa through a benchmark-and-trade system," Renewable and Sustainable Energy Reviews, Elsevier, vol. 30(C), pages 833-840.
    4. Barros, Carlos Pestana, 2008. "Efficiency analysis of hydroelectric generating plants: A case study for Portugal," Energy Economics, Elsevier, vol. 30(1), pages 59-75, January.
    5. Jian-xia Chang & Tao Bai & Qiang Huang & Da-wen Yang, 2013. "Optimization of Water Resources Utilization by PSO-GA," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 27(10), pages 3525-3540, August.
    6. Kahraman, Gökhan & Yücel, Halit Lütfi & Öztop, Hakan F., 2009. "Evaluation of energy efficiency using thermodynamics analysis in a hydropower plant: A case study," Renewable Energy, Elsevier, vol. 34(6), pages 1458-1465.
    7. Barros, Carlos P. & Peypoch, Nicolas, 2007. "The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach," Energy Policy, Elsevier, vol. 35(9), pages 4463-4470, September.
    8. Liu, Liwei & Zong, Haijing & Zhao, Erdong & Chen, Chuxiang & Wang, Jianzhou, 2014. "Can China realize its carbon emission reduction goal in 2020: From the perspective of thermal power development," Applied Energy, Elsevier, vol. 124(C), pages 199-212.
    9. Bing Wang & Ioan Nistor & Tad Murty & Yi-Ming Wei, 2014. "Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach," CEEP-BIT Working Papers 66, Center for Energy and Environmental Policy Research (CEEP), Beijing Institute of Technology.
    10. Sözen, Adnan & Alp, İhsan & Kilinc, Cuma, 2012. "Efficiency assessment of the hydro-power plants in Turkey by using Data Envelopment Analysis," Renewable Energy, Elsevier, vol. 46(C), pages 192-202.
    11. Y. Bolouri-Yazdeli & O. Bozorg Haddad & E. Fallah-Mehdipour & M. Mariño, 2014. "Evaluation of Real-Time Operation Rules in Reservoir Systems Operation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 28(3), pages 715-729, February.
    12. Marie Minville & François Brissette & Stéphane Krau & Robert Leconte, 2009. "Adaptation to Climate Change in the Management of a Canadian Water-Resources System Exploited for Hydropower," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 23(14), pages 2965-2986, November.
    13. Wang, Bing & Nistor, Ioan & Murty, Tad & Wei, Yi-Ming, 2014. "Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach," Energy Economics, Elsevier, vol. 46(C), pages 112-121.
    14. Lin, Boqiang & Wu, Ya & Zhang, Li, 2012. "Electricity saving potential of the power generation industry in China," Energy, Elsevier, vol. 40(1), pages 307-316.
    15. Zeng, Ming & Li, Chen & Zhou, Lisha, 2013. "Progress and prospective on the police system of renewable energy in China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 20(C), pages 36-44.
    16. Ma, Hengyun & Oxley, Les & Gibson, John, 2009. "China's energy situation in the new millennium," Renewable and Sustainable Energy Reviews, Elsevier, vol. 13(8), pages 1781-1799, October.
    17. Hennig, Thomas & Wang, Wenling & Feng, Yan & Ou, Xiaokun & He, Daming, 2013. "Review of Yunnan's hydropower development. Comparing small and large hydropower projects regarding their environmental implications and socio-economic consequences," Renewable and Sustainable Energy Reviews, Elsevier, vol. 27(C), pages 585-595.
    18. Cheng, Chuntian & Liu, Benxi & Chau, Kwok-Wing & Li, Gang & Liao, Shengli, 2015. "China׳s small hydropower and its dispatching management," Renewable and Sustainable Energy Reviews, Elsevier, vol. 42(C), pages 43-55.
    19. Zheng, Tengfei & Qiang, Maoshan & Chen, Wenchao & Xia, Bingqing & Wang, Jianing, 2016. "An externality evaluation model for hydropower projects: A case study of the Three Gorges Project," Energy, Elsevier, vol. 108(C), pages 74-85.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Cheng, Chuntian & Liu, Benxi & Chau, Kwok-Wing & Li, Gang & Liao, Shengli, 2015. "China׳s small hydropower and its dispatching management," Renewable and Sustainable Energy Reviews, Elsevier, vol. 42(C), pages 43-55.
    2. Liu, Benxi & Liao, Shengli & Cheng, Chuntian & Chen, Fu & Li, Weidong, 2018. "Hydropower curtailment in Yunnan Province, southwestern China: Constraint analysis and suggestions," Renewable Energy, Elsevier, vol. 121(C), pages 700-711.
    3. Sai, Rockson & Lin, Boqiang, 2022. "Productivity assessment of power generation in Kenya: What are the impacts?," Energy, Elsevier, vol. 254(PA).
    4. Bing Wang & Ioan Nistor & Tad Murty & Yi-Ming Wei, 2014. "Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach," CEEP-BIT Working Papers 66, Center for Energy and Environmental Policy Research (CEEP), Beijing Institute of Technology.
    5. Wang, Bing & Nistor, Ioan & Murty, Tad & Wei, Yi-Ming, 2014. "Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach," Energy Economics, Elsevier, vol. 46(C), pages 112-121.
    6. Pang, Mingyue & Zhang, Lixiao & Bahaj, AbuBakr S. & Xu, Kaipeng & Hao, Yan & Wang, Changbo, 2018. "Small hydropower development in Tibet: Insight from a survey in Nagqu Prefecture," Renewable and Sustainable Energy Reviews, Elsevier, vol. 81(P2), pages 3032-3040.
    7. Bortoluzzi, Mirian & Furlan, Marcelo & dos Reis Neto, José Francisco, 2022. "Assessing the impact of hydropower projects in Brazil through data envelopment analysis and machine learning," Renewable Energy, Elsevier, vol. 200(C), pages 1316-1326.
    8. Wang, Feifei & Chen, Diyi & Xu, Beibei & Zhang, Hao, 2016. "Nonlinear dynamics of a novel fractional-order Francis hydro-turbine governing system with time delay," Chaos, Solitons & Fractals, Elsevier, vol. 91(C), pages 329-338.
    9. Ming, Zeng & Song, Xue & Mingjuan, Ma & Lingyun, Li & Min, Cheng & Yuejin, Wang, 2013. "Historical review of demand side management in China: Management content, operation mode, results assessment and relative incentives," Renewable and Sustainable Energy Reviews, Elsevier, vol. 25(C), pages 470-482.
    10. Priyanka Majumder & Mrinmoy Majumder & Apu Kumar Saha & Soumitra Nath, 2020. "Selection of features for analysis of reliability of performance in hydropower plants: a multi-criteria decision making approach," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 22(4), pages 3239-3265, April.
    11. Michael O. Ukoba & Ogheneruona E. Diemuodeke & Mohammed Alghassab & Henry I. Njoku & Muhammad Imran & Zafar A. Khan, 2020. "Composite Multi-Criteria Decision Analysis for Optimization of Hybrid Renewable Energy Systems for Geopolitical Zones in Nigeria," Sustainability, MDPI, vol. 12(14), pages 1-27, July.
    12. Natalia Walczak & Zbigniew Walczak & Tomasz Tymiński, 2022. "Laboratory Research on Hydraulic Losses on SHP Inlet Channel Trash Racks," Energies, MDPI, vol. 15(20), pages 1-18, October.
    13. Liu, C.H. & Lin, Sue J. & Lewis, Charles, 2010. "Evaluation of thermal power plant operational performance in Taiwan by data envelopment analysis," Energy Policy, Elsevier, vol. 38(2), pages 1049-1058, February.
    14. Tao Bai & Lianzhou Wu & Jian-xia Chang & Qiang Huang, 2015. "Multi-Objective Optimal Operation Model of Cascade Reservoirs and Its Application on Water and Sediment Regulation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 29(8), pages 2751-2770, June.
    15. Lan Feng & Pan Hu & Haisen Wang & Ming-ming Chen & Jiangang Han, 2022. "Improving City Water Quality through Pollution Reduction with Urban Floodgate Infrastructure and Design Solutions: A Case Study in Wuxi, China," IJERPH, MDPI, vol. 19(17), pages 1-18, September.
    16. Barros, Carlos Pestana & Wanke, Peter, 2015. "An analysis of African airlines efficiency with two-stage TOPSIS and neural networks," Journal of Air Transport Management, Elsevier, vol. 44, pages 90-102.
    17. Chen, Zhongfei & Barros, Carlos Pestana & Borges, Maria Rosa, 2015. "A Bayesian stochastic frontier analysis of Chinese fossil-fuel electricity generation companies," Energy Economics, Elsevier, vol. 48(C), pages 136-144.
    18. Barros, Carlos Pestana & Peypoch, Nicolas, 2008. "Technical efficiency of thermoelectric power plants," Energy Economics, Elsevier, vol. 30(6), pages 3118-3127, November.
    19. Barros, C.P. & Wanke, Peter & Dumbo, Silvestre & Manso, Jose Pires, 2017. "Efficiency in angolan hydro-electric power station: A two-stage virtual frontier dynamic DEA and simplex regression approach," Renewable and Sustainable Energy Reviews, Elsevier, vol. 78(C), pages 588-596.
    20. Gharneh, Naser Shams & Nabavieh, Alireza & Gholamiangonabadi, Davoud & Alimoradi, Mohammad, 2014. "Productivity change and its determinants: Application of the Malmquist index with bootstrapping in Iranian steam power plants," Utilities Policy, Elsevier, vol. 31(C), pages 114-120.

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:energy:v:135:y:2017:i:c:p:23-31. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/energy .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.