IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v272y2019i1p188-194.html
   My bibliography  Save this article

Minimizing the number of workers in a paced mixed-model assembly line

Author

Listed:
  • Delorme, Xavier
  • Dolgui, Alexandre
  • Kovalev, Sergey
  • Kovalyov, Mikhail Y.

Abstract

We study a problem of minimizing the maximum number of identical workers over all cycles of a paced assembly line comprised of m stations and executing n parts of k types. There are lower and upper bounds on the workforce requirements and the cycle time constraints. We show that this problem is equivalent to the same problem without the cycle time constraints and with fixed workforce requirements. We prove that the problem is NP-hard in the strong sense if m=4 and the workforce requirements are station independent, and present an Integer Linear Programming model, an enumeration algorithm and a dynamic programming algorithm. Polynomial in k and polynomial in n algorithms for special cases with two part types or two stations are also given. Relations to the Bottleneck Traveling Salesman Problem and its generalizations are discussed.

Suggested Citation

  • Delorme, Xavier & Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y., 2019. "Minimizing the number of workers in a paced mixed-model assembly line," European Journal of Operational Research, Elsevier, vol. 272(1), pages 188-194.
  • Handle: RePEc:eee:ejores:v:272:y:2019:i:1:p:188-194
    DOI: 10.1016/j.ejor.2018.05.072
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221718305071
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2018.05.072?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. John J. Bartholdi & James B. Orlin & H. Donald Ratliff, 1980. "Cyclic Scheduling via Integer Programs with Circular Ones," Operations Research, INFORMS, vol. 28(5), pages 1074-1085, October.
    2. Chung-Yee Lee & George L. Vairaktarakis, 1997. "Workforce Planning in Mixed Model Assembly Systems," Operations Research, INFORMS, vol. 45(4), pages 553-567, August.
    3. Olcay Polat & Can B. Kalayci & Özcan Mutlu & Surendra M. Gupta, 2016. "A two-phase variable neighbourhood search algorithm for assembly line worker assignment and balancing problem type-II: an industrial case study," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 722-741, February.
    4. Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Malyutin, Sergey & Soukhal, Ameur, 2018. "Optimal workforce assignment to operations of a paced assembly line," European Journal of Operational Research, Elsevier, vol. 264(1), pages 200-211.
    5. George Vairaktarakis & Joseph G. Szmerekovsky & Jiayan Xu, 2016. "Level workforce planning for multistage transfer lines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(7), pages 577-590, October.
    6. George Vairaktarakis & Janice Kim Winch, 1999. "Worker Cross-Training in Paced Assembly Lines," Manufacturing & Service Operations Management, INFORMS, vol. 1(2), pages 112-131.
    7. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    8. Lutz, CM & Davis, KR & Turner III, CF, 1994. "Development of operator assignment schedules: A DSS approach," Omega, Elsevier, vol. 22(1), pages 57-67, January.
    9. Che, Ada & Kats, Vladimir & Levner, Eugene, 2017. "An efficient bicriteria algorithm for stable robotic flow shop scheduling," European Journal of Operational Research, Elsevier, vol. 260(3), pages 964-971.
    10. P. C. Gilmore & R. E. Gomory, 1964. "Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem," Operations Research, INFORMS, vol. 12(5), pages 655-679, October.
    11. Battaïa, Olga & Delorme, Xavier & Dolgui, Alexandre & Hagemann, Johannes & Horlemann, Anika & Kovalev, Sergey & Malyutin, Sergey, 2015. "Workforce minimization for a mixed-model assembly line in the automotive industry," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 489-500.
    12. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    13. Marcus Ritt & Alysson M. Costa & Cristóbal Miralles, 2016. "The assembly line worker assignment and balancing problem with stochastic worker availability," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 907-922, February.
    14. Vairaktarakis, George L. & Cai, Xiaoqiang & Lee, Chung-Yee, 2002. "Workforce planning in synchronous production systems," European Journal of Operational Research, Elsevier, vol. 136(3), pages 551-572, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2022. "Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers," Omega, Elsevier, vol. 113(C).
    2. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2023. "Markov decision process for multi-manned mixed-model assembly lines with walking workers," International Journal of Production Economics, Elsevier, vol. 255(C).
    3. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
    4. Mosadegh, H. & Fatemi Ghomi, S.M.T. & Süer, G.A., 2020. "Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristics," European Journal of Operational Research, Elsevier, vol. 282(2), pages 530-544.
    5. Wu, Fangfang & Zhang, Xiandong & Chen, Bo, 2023. "An improved approximation algorithm for scheduling monotonic moldable tasks," European Journal of Operational Research, Elsevier, vol. 306(2), pages 567-578.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Malyutin, Sergey & Soukhal, Ameur, 2018. "Optimal workforce assignment to operations of a paced assembly line," European Journal of Operational Research, Elsevier, vol. 264(1), pages 200-211.
    2. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
    3. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2022. "Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers," Omega, Elsevier, vol. 113(C).
    4. Battaïa, Olga & Delorme, Xavier & Dolgui, Alexandre & Hagemann, Johannes & Horlemann, Anika & Kovalev, Sergey & Malyutin, Sergey, 2015. "Workforce minimization for a mixed-model assembly line in the automotive industry," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 489-500.
    5. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2023. "Markov decision process for multi-manned mixed-model assembly lines with walking workers," International Journal of Production Economics, Elsevier, vol. 255(C).
    6. Alexander Biele & Lars Mönch, 2018. "Hybrid approaches to optimize mixed-model assembly lines in low-volume manufacturing," Journal of Heuristics, Springer, vol. 24(1), pages 49-81, February.
    7. Fowler, John W. & Wirojanagud, Pornsarun & Gel, Esma S., 2008. "Heuristics for workforce planning with worker differences," European Journal of Operational Research, Elsevier, vol. 190(3), pages 724-740, November.
    8. George L. Vairaktarakis & Chung‐Yee Lee, 2004. "Analysis of algorithms for two‐stage flowshops with multi‐processor task flexibility," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(1), pages 44-59, February.
    9. Jonathan Oesterle & Lionel Amodeo & Farouk Yalaoui, 2019. "A comparative study of Multi-Objective Algorithms for the Assembly Line Balancing and Equipment Selection Problem under consideration of Product Design Alternatives," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1021-1046, March.
    10. George Vairaktarakis & Joseph G. Szmerekovsky & Jiayan Xu, 2016. "Level workforce planning for multistage transfer lines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(7), pages 577-590, October.
    11. Leung, Polly P.L. & Wu, C.H. & Kwong, C.K. & Ip, W.H. & Ching, W.K., 2021. "Digitalisation for optimising nursing staff demand modelling and scheduling in nursing homes," Technological Forecasting and Social Change, Elsevier, vol. 164(C).
    12. Fang, Kan & Wang, Shijin & Pinedo, Michael L. & Chen, Lin & Chu, Feng, 2021. "A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions," European Journal of Operational Research, Elsevier, vol. 291(1), pages 128-146.
    13. Borba, Leonardo & Ritt, Marcus & Miralles, Cristóbal, 2018. "Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 270(1), pages 146-156.
    14. Zhilan Lou & Wanchen Jie & Shuzhu Zhang, 2020. "Multi-Objective Optimization for Order Assignment in Food Delivery Industry with Human Factor Considerations," Sustainability, MDPI, vol. 12(19), pages 1-17, September.
    15. Severino, Gonzalo & Rivera, José & Parot, Roberto & Otaegui, Ernesto & Fuentes, Andrés & Reszka, Pedro, 2024. "Workforce and task optimization to guarantee oxygen bottling under a COVID-19 pandemic scenario: A Chilean case study," International Journal of Production Economics, Elsevier, vol. 271(C).
    16. García-Villoria, Alberto & Corominas, Albert & Nadal, Adrià & Pastor, Rafael, 2018. "Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints," European Journal of Operational Research, Elsevier, vol. 271(3), pages 882-895.
    17. Opacic, Luke & Sowlati, Taraneh & Mobini, Mahdi, 2018. "Design and development of a simulation-based decision support tool to improve the production process at an engineered wood products mill," International Journal of Production Economics, Elsevier, vol. 199(C), pages 209-219.
    18. Aykin, Turgut, 2000. "A comparative evaluation of modeling approaches to the labor shift scheduling problem," European Journal of Operational Research, Elsevier, vol. 125(2), pages 381-397, September.
    19. Symitsi, Efthymia & Stamolampros, Panagiotis & Daskalakis, George & Korfiatis, Nikolaos, 2021. "The informational value of employee online reviews," European Journal of Operational Research, Elsevier, vol. 288(2), pages 605-619.
    20. Corominas, Albert & Pastor, Rafael & Plans, Joan, 2008. "Balancing assembly line with skilled and unskilled workers," Omega, Elsevier, vol. 36(6), pages 1126-1132, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:272:y:2019:i:1:p:188-194. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.