IDEAS home Printed from https://ideas.repec.org/a/bdu/oejbsm/v3y2018i7p101-124id764.html
   My bibliography  Save this article

Influence Of Project Risk Management Practices On Performance Of Telecommunication Network Modernisation Projects In Kenya

Author

Listed:
  • Samuel Kipkoech Maritim

  • Dr. Kenneth Chelule

Abstract

Purpose: Telecommunication operators around the world continue to upgrade their network technologies to improve performance and increase capacity. Many of these firms are confronted with the challenge of ensuring successful implementation of these projects. The general objective of this study was to establish the influence of project risk management practices on performance of Telecommunication Network Modernization projects in Kenya. Methodology: This study adopted a case study research design. The target population for the study was Network Modernization projects undertaken by Safaricom Plc in the past three years. The unit of observation were the Project Managers and Technical Team leaders who are responsible for the management of the selected Network modernization projects. A total of sixty Network modernization projects were selected. Total number of 60 respondents was reached, representing the entire population. Census was used in the study. Primary data was collected using semi-structured questionnaire based on the objectives of the study. The data was edited, coded for processing using the Statistical Package for Social Sciences (SPSS v.24) and presented in tabular and graphical format. A master codebook designed to ensure that all the questionnaires are coded uniformly was used. Consequently, data was edited for completeness and consistency before analysis. The study used multiple regression analysis and Analysis of Variance (ANOVA) to analyze the degree of relationship between the variables in the study at 5% level of significance. Results: The study found that all the four aspects of risk management were practiced to a high extent. Regression analysis yielded relationships between performance of network modernization projects against project risk identification, project risk monitoring and project risk response. Though these relationships were weak, they were found to be statistically significant at the 5% significance level. Project risk analysis was found to have no relationship with performance of network modernization projects. Unique contribution to Theory, Practice and Policy: The study recommended that telecommunication firms should pay great emphasis on the three aspects of risk management, namely project risk identification, project risk monitoring and project risk response. Further it was recommended that future studies should be done to establish other factors that influence performance of Telecomm Network Modernization projects.

Suggested Citation

  • Samuel Kipkoech Maritim & Dr. Kenneth Chelule, 2018. "Influence Of Project Risk Management Practices On Performance Of Telecommunication Network Modernisation Projects In Kenya," European Journal of Business and Strategic Management, International Peer Review Journals and Books, vol. 3(7), pages 101-124.
  • Handle: RePEc:bdu:oejbsm:v:3:y:2018:i:7:p:101-124:id:764
    as

    Download full text from publisher

    File URL: https://iprjb.org/journals/EJBSM/article/view/764
    Download Restriction: no
    ---><---

    More about this item

    Keywords

    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bdu:oejbsm:v:3:y:2018:i:7:p:101-124:id:764. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chief Editor (email available below). General contact details of provider: https://iprjb.org/journals/EJBSM/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.