IDEAS home Printed from https://ideas.repec.org/a/bcp/journl/v9y2025i1p4027-4044.html
   My bibliography  Save this article

Challenges in Construction Project Management: Time Extensions and Claims Implications

Author

Listed:
  • Nuraqilah Fauzan

    (Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310, Skudai, Johor, Malaysia)

  • Mohd Saidin Misnan

    (Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310, Skudai, Johor, Malaysia)

  • Muzani Mustapa

    (Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310, Skudai, Johor, Malaysia)

  • Nurshikin Mohamad Shukery

    (Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310, Skudai, Johor, Malaysia)

  • Mohd Zahierruden Ismail

    (Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310, Skudai, Johor, Malaysia)

Abstract

In construction projects, delays are widely recognized as the most prevalent, costly, complex, and risky issue. Diverse project scheduling and planning methodologies may employ disparate approaches for evaluating extensions of time (EoT). Extension of Time (EoT) claims are a critical component of construction project management, providing contractors with the enforceable right to extend project deadlines due to unforeseen delays beyond their control. Notwithstanding their significance, the submission and handling of EoT claims frequently results in disputes, overspending, and delays, all of which can have an adverse consequence on project performance. This study endeavours to thoroughly investigate the delay causes which leads to EoT claims in construction project management, utilising an extensive analysis of extant literature, industry standards, and case studies, as well as evaluates the implications of EoT claims on project time, costs, quality, and stakeholder satisfaction. By investigating the delay causes and its implication which leads to EoT claims in project management, this study seeks to provide comprehensive insights and practical recommendations for improving the EoT assessment process as well as minimizing the delay causes and its implications towards overall project management. The study aims to enhance the efficiency and fairness of EoT assessments, reduce disputes and delays, and improve overall project performance and stakeholder satisfaction.

Suggested Citation

  • Nuraqilah Fauzan & Mohd Saidin Misnan & Muzani Mustapa & Nurshikin Mohamad Shukery & Mohd Zahierruden Ismail, 2025. "Challenges in Construction Project Management: Time Extensions and Claims Implications," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 9(1), pages 4027-4044, January.
  • Handle: RePEc:bcp:journl:v:9:y:2025:i:1:p:4027-4044
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijriss/Digital-Library/volume-9-issue-1/4027-4044.pdf
    Download Restriction: no

    File URL: https://rsisinternational.org/journals/ijriss/articles/challenges-in-construction-project-management-time-extensions-and-claims-implications/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Bahadir, Berrak & Mykhaylova, Olena, 2014. "Housing market dynamics with delays in the construction sector," Journal of Housing Economics, Elsevier, vol. 26(C), pages 94-108.
    2. Yakubu Adisa Olawale & Ming Sun, 2010. "Cost and time control of construction projects: inhibiting factors and mitigating measures in practice," Construction Management and Economics, Taylor & Francis Journals, vol. 28(5), pages 509-526.
    3. Abdul-Rashid Abdul-Aziz, 2012. "Control mechanisms exercised in Malaysian housing public-private partnerships," Construction Management and Economics, Taylor & Francis Journals, vol. 30(1), pages 37-55, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Brausewetter, Lars & Thomsen, Stephan L. & Trunzer, Johannes, 2022. "Explaining regional disparities in housing prices across German districts," IWH Discussion Papers 13/2022, Halle Institute for Economic Research (IWH).
    2. Shenzhe Jiang & Junjie Xia & Jiajun Xu & Jianye Yan, 2023. "A theory of National Development Bank: long-term investment and the agency problem," Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 76(3), pages 995-1024, October.
    3. Gary Wai Chung Wong & Lok Sang Ho, 2017. "Policy-Driven Housing Cycle: The Hong Kong Case of Supply Intervention," International Real Estate Review, Global Social Science Institute, vol. 20(3), pages 375-396.
    4. Gandhi, Sahil & Tandel, Vaidehi & Tabarrok, Alexander & Ravi, Shamika, 2021. "Too slow for the urban march: Litigations and the real estate market in Mumbai, India," Journal of Urban Economics, Elsevier, vol. 123(C).
    5. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
    6. Luciana Muthoki Nyamai, 2018. "Effect Of Financial Planning And Working Capital Management On The Performance Of Fruit Farming In Kenya: A Case Of Machakos County," International Journal of Finance and Accounting, IPRJB, vol. 3(1), pages 19-34.
    7. Øglend, Atle & Osmundsen, Petter & Lorentzen, Sindre, 2016. "Cost Overrun at the Norwegian Continental Shelf: The element of surprise," UiS Working Papers in Economics and Finance 2016/3, University of Stavanger.
    8. Kumar Virender & Pandey Amrendra & Singh Rahul, 2023. "Project success and critical success factors of construction projects: project practitioners’ perspectives," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 1-22, January.
    9. Myung-Hun Kim & Eul-Bum Lee & Han-Suk Choi, 2019. "A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects," Sustainability, MDPI, vol. 11(5), pages 1-21, February.
    10. repec:eur:ejfejr:49 is not listed on IDEAS
    11. World Bank, 2024. "Drivers of Delays in Procurement of Infrastructure Projects," World Bank Publications - Reports 41978, The World Bank Group.
    12. Nyoni, Thabani, 2019. "Cost overrun factors in construction industry: a case of Zimbabwe," MPRA Paper 96788, University Library of Munich, Germany.
    13. Silvana Secinaro & Luigi Corvo & Valerio Brescia & Daniel Iannaci, 2019. "Hybrid Organizations: A Systematic Review of the Current Literature," International Business Research, Canadian Center of Science and Education, vol. 12(11), pages 1-21, November.
    14. Dezhi Li & Yanchao Chen & Hongxia Chen & Eddie Chi Man Hui & Kai Guo, 2016. "Evaluation and Optimization of the Financial Sustainability of Public Rental Housing Projects: A Case Study in Nanjing, China," Sustainability, MDPI, vol. 8(4), pages 1-13, April.
    15. Petter Osmundsen & Kristin Helen Roll, 2016. "Rig Rates and Drilling Speed: Reinforcing Effects," CESifo Working Paper Series 5895, CESifo.
    16. Temitope Seun Omotayo & Bankole Awuzie & Valerie Kenechukwu Obi & Saheed Ajayi & Lovelin Ifeoma Obi & Oluyomi Osobajo & Adekunle Oke, 2022. "The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era," SAGE Open, , vol. 12(2), pages 21582440221, May.
    17. Patrick Uwineza & Jean de Dieu Dushimimana, 2022. "Project Management Practices And Effectiveness Of Private Radio Station’S Projects A Case Of Selected Projects Of Energy Radio, In Musanze District, Rwanda (2017-2020)," Working papers 2022-42-08, Voice of Research.
    18. Jin Woo Won & Wooyong Jung & Seung Heon Han & Sungmin Yun & Bonsang Koo, 2019. "What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?," Sustainability, MDPI, vol. 11(21), pages 1-17, October.
    19. Kareem Mohammad Mahmoud Mostafa & Dr. Ayman Hamdy Nassar, 2018. "Using Artificial Neural Networks to Model Cost Overruns in Real Estate Projects," International Journal of Research and Scientific Innovation, International Journal of Research and Scientific Innovation (IJRSI), vol. 5(10), pages 72-86, October.
    20. Hemanta Doloi & Anil Sawhney & K.C. Iyer, 2012. "Structural equation model for investigating factors affecting delay in Indian construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 30(10), pages 869-884, October.
    21. Rehan Ashok & Thorpe David & Heravi Amirhossein, 2024. "Leadership practices and communication framework for project success – The construction sector," Organization, Technology and Management in Construction, Sciendo, vol. 16(1), pages 204-223.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:9:y:2025:i:1:p:4027-4044. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.