IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v266y2018i2p395-414.html
   My bibliography  Save this article

OR in spare parts management: A review

Author

Listed:
  • Hu, Qiwei
  • Boylan, John E.
  • Chen, Huijing
  • Labib, Ashraf

Abstract

Spare parts are held to reduce the consequences of equipment downtime, playing an important role in achieving the desired equipment availability at a minimum economic cost. In this paper, a framework for OR in spare parts management is presented, based on the product lifecycle process and including the objectives, main tasks, and OR disciplines for supporting spare parts management. Based on the framework, a systematic literature review of OR in spare parts management is undertaken, and then a comprehensive investigation of each OR discipline's contribution is given. The gap between theory and practice of spare parts management is investigated from the perspective of software integration, maintenance management information systems and adoption of new OR methods in software. Finally, as the result of this review, an extended version of the framework is proposed and a set of future research directions is discussed.

Suggested Citation

  • Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
  • Handle: RePEc:eee:ejores:v:266:y:2018:i:2:p:395-414
    DOI: 10.1016/j.ejor.2017.07.058
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221717307014
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2017.07.058?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Retel Helmrich, Mathijn J. & Jans, Raf & van den Heuvel, Wilco & Wagelmans, Albert P.M., 2015. "The economic lot-sizing problem with an emission capacity constraint," European Journal of Operational Research, Elsevier, vol. 241(1), pages 50-62.
    2. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    3. Tsai, Chi-Yang & Yeh, Szu-Wei, 2008. "A multiple objective particle swarm optimization approach for inventory classification," International Journal of Production Economics, Elsevier, vol. 114(2), pages 656-666, August.
    4. Karl Inderfurth & Kampan Mukherjee, 2008. "Decision support for spare parts acquisition in post product life cycle," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 16(1), pages 17-42, March.
    5. Bijvank, Marco & Koole, Ger & Vis, Iris F.A., 2010. "Optimising a general repair kit problem with a service constraint," European Journal of Operational Research, Elsevier, vol. 204(1), pages 76-85, July.
    6. A A Syntetos & J E Boylan & J D Croston, 2005. "On the categorization of demand patterns," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 495-503, May.
    7. Hadi-Vencheh, A., 2010. "An improvement to multiple criteria ABC inventory classification," European Journal of Operational Research, Elsevier, vol. 201(3), pages 962-965, March.
    8. Lau, Hoong Chuin & Song, Huawei & See, Chuen Teck & Cheng, Siew Yen, 2006. "Evaluation of time-varying availability in multi-echelon spare parts systems with passivation," European Journal of Operational Research, Elsevier, vol. 170(1), pages 91-105, April.
    9. Nasuh Buyukkaramikli & Henny Ooijen & J. Bertrand, 2015. "Integrating inventory control and capacity management at a maintenance service provider," Annals of Operations Research, Springer, vol. 231(1), pages 185-206, August.
    10. Teunter, Ruud H. & Klein Haneveld, Willem K., 1998. "The `final orderrs problem," European Journal of Operational Research, Elsevier, vol. 107(1), pages 35-44, May.
    11. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    12. Kumar, Narendra & Vrat, Prem & Sushil, 1994. "A simulation study of unit exchange spares management of diesel locomotives in the Indian railways," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 225-236, January.
    13. M. Pourakbar & E. Laan & R. Dekker, 2014. "End-of-Life Inventory Problem with Phaseout Returns," Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1561-1576, September.
    14. Millstein, Mitchell A. & Yang, Liu & Li, Haitao, 2014. "Optimizing ABC inventory grouping decisions," International Journal of Production Economics, Elsevier, vol. 148(C), pages 71-80.
    15. Molenaers, An & Baets, Herman & Pintelon, Liliane & Waeyenbergh, Geert, 2012. "Criticality classification of spare parts: A case study," International Journal of Production Economics, Elsevier, vol. 140(2), pages 570-578.
    16. Tiacci, Lorenzo & Saetta, Stefano, 2011. "Reducing the mean supply delay of spare parts using lateral transshipments policies," International Journal of Production Economics, Elsevier, vol. 133(1), pages 182-191, September.
    17. Ng, Wan Lung, 2007. "A simple classifier for multiple criteria ABC analysis," European Journal of Operational Research, Elsevier, vol. 177(1), pages 344-353, February.
    18. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
    19. Yongquan, Sun & Xi, Chen & He, Ren & Yingchao, Jin & Quanwu, Liu, 2016. "Ordering decision-making methods on spare parts for a new aircraft fleet based on a two-sample prediction," Reliability Engineering and System Safety, Elsevier, vol. 156(C), pages 40-50.
    20. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
    21. Romeijnders, Ward & Teunter, Ruud & van Jaarsveld, Willem, 2012. "A two-step method for forecasting spare parts demand using information on component repairs," European Journal of Operational Research, Elsevier, vol. 220(2), pages 386-393.
    22. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    23. Syntetos, A. A. & Boylan, J. E., 2001. "On the bias of intermittent demand estimates," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 457-466, May.
    24. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2006. "On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out," European Journal of Operational Research, Elsevier, vol. 174(1), pages 182-200, October.
    25. Moritz Fleischmann & Jo A. E. E. van Nunen & Ben Gräve, 2003. "Integrating Closed-Loop Supply Chains and Spare-Parts Management at IBM," Interfaces, INFORMS, vol. 33(6), pages 44-56, December.
    26. van Wingerden, E. & Basten, R.J.I. & Dekker, R. & Rustenburg, W.D., 2014. "More grip on inventory control through improved forecasting: A comparative study at three companies," International Journal of Production Economics, Elsevier, vol. 157(C), pages 220-237.
    27. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
    28. Cheng, Yung-Hsiang & Tsao, Hou-Lei, 2010. "Rolling stock maintenance strategy selection, spares parts' estimation, and replacements' interval calculation," International Journal of Production Economics, Elsevier, vol. 128(1), pages 404-412, November.
    29. Zhou, Peng & Fan, Liwei, 2007. "A note on multi-criteria ABC inventory classification using weighted linear optimization," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1488-1491, November.
    30. Diaz, Angel & Fu, Michael C., 1997. "Models for multi-echelon repairable item inventory systems with limited repair capacity," European Journal of Operational Research, Elsevier, vol. 97(3), pages 480-492, March.
    31. Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.
    32. Teunter, Ruud & Sani, Babangida, 2009. "On the bias of Croston's forecasting method," European Journal of Operational Research, Elsevier, vol. 194(1), pages 177-183, April.
    33. Teunter, Ruud H. & Fortuin, Leonard, 1999. "End-of-life service," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 487-497, March.
    34. Syntetos, Aris A. & Zied Babai, M. & Gardner, Everette S., 2015. "Forecasting intermittent inventory demands: simple parametric methods vs. bootstrapping," Journal of Business Research, Elsevier, vol. 68(8), pages 1746-1752.
    35. Boylan, John E. & Goodwin, Paul & Mohammadipour, Maryam & Syntetos, Aris A., 2015. "Reproducibility in forecasting research," International Journal of Forecasting, Elsevier, vol. 31(1), pages 79-90.
    36. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Spare parts stock control for redundant systems using reliability centered maintenance data," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1576-1586.
    37. Hyndman, Rob J. & Koehler, Anne B., 2006. "Another look at measures of forecast accuracy," International Journal of Forecasting, Elsevier, vol. 22(4), pages 679-688.
    38. Yoram Wind & Thomas L. Saaty, 1980. "Marketing Applications of the Analytic Hierarchy Process," Management Science, INFORMS, vol. 26(7), pages 641-658, July.
    39. Willemain, Thomas R. & Smart, Charles N. & Schwarz, Henry F., 2004. "A new approach to forecasting intermittent demand for service parts inventories," International Journal of Forecasting, Elsevier, vol. 20(3), pages 375-387.
    40. J P J van Kooten & T Tan, 2009. "The final order problem for repairable spare parts under condemnation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(10), pages 1449-1461, October.
    41. Fildes, Robert & Goodwin, Paul & Lawrence, Michael & Nikolopoulos, Konstantinos, 2009. "Effective forecasting and judgmental adjustments: an empirical evaluation and strategies for improvement in supply-chain planning," International Journal of Forecasting, Elsevier, vol. 25(1), pages 3-23.
    42. Klepper, Steven, 1996. "Entry, Exit, Growth, and Innovation over the Product Life Cycle," American Economic Review, American Economic Association, vol. 86(3), pages 562-583, June.
    43. Rink, David R. & Swan, John E., 1979. "Product life cycle research: A literature review," Journal of Business Research, Elsevier, vol. 7(3), pages 219-242, September.
    44. Mohammaditabar, Davood & Hassan Ghodsypour, Seyed & O'Brien, Chris, 2012. "Inventory control system design by integrating inventory classification and policy selection," International Journal of Production Economics, Elsevier, vol. 140(2), pages 655-659.
    45. Wang, Wenbin, 2011. "A joint spare part and maintenance inspection optimisation model using the Delay-Time concept," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1535-1541.
    46. Heinecke, G. & Syntetos, A.A. & Wang, W., 2013. "Forecasting-based SKU classification," International Journal of Production Economics, Elsevier, vol. 143(2), pages 455-462.
    47. Makridakis, Spyros & Hibon, Michele, 2000. "The M3-Competition: results, conclusions and implications," International Journal of Forecasting, Elsevier, vol. 16(4), pages 451-476.
    48. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase," European Journal of Operational Research, Elsevier, vol. 137(3), pages 497-511, March.
    49. Önal, Mehmet & Romeijn, H.Edwin & Sapra, Amar & van den Heuvel, Wilco, 2015. "The economic lot-sizing problem with perishable items and consumption order preference," European Journal of Operational Research, Elsevier, vol. 244(3), pages 881-891.
    50. Regattieri, A. & Gamberi, M. & Gamberini, R. & Manzini, R., 2005. "Managing lumpy demand for aircraft spare parts," Journal of Air Transport Management, Elsevier, vol. 11(6), pages 426-431.
    51. Paul J. Schweitzer, 1967. "Initial Provisioning with Spare Deterioration," Operations Research, INFORMS, vol. 15(3), pages 513-529, June.
    52. Dekker, Rommert & Bloemhof, Jacqueline & Mallidis, Ioannis, 2012. "Operations Research for green logistics – An overview of aspects, issues, contributions and challenges," European Journal of Operational Research, Elsevier, vol. 219(3), pages 671-679.
    53. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
    54. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    55. Van Horenbeek, Adriaan & Buré, Jasmine & Cattrysse, Dirk & Pintelon, Liliane & Vansteenwegen, Pieter, 2013. "Joint maintenance and inventory optimization systems: A review," International Journal of Production Economics, Elsevier, vol. 143(2), pages 499-508.
    56. A V Kostenko & R J Hyndman, 2006. "A note on the categorization of demand patterns," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(10), pages 1256-1257, October.
    57. Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2013. "Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 95-101.
    58. Zhou, Chenxi & Viswanathan, S., 2011. "Comparison of a new bootstrapping method with parametric approaches for safety stock determination in service parts inventory systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 481-485, September.
    59. Kourentzes, Nikolaos, 2013. "Intermittent demand forecasts with neural networks," International Journal of Production Economics, Elsevier, vol. 143(1), pages 198-206.
    60. Gutierrez, Rafael S. & Solis, Adriano O. & Mukhopadhyay, Somnath, 2008. "Lumpy demand forecasting using neural networks," International Journal of Production Economics, Elsevier, vol. 111(2), pages 409-420, February.
    61. Syntetos, Aris A. & Boylan, John E., 2005. "The accuracy of intermittent demand estimates," International Journal of Forecasting, Elsevier, vol. 21(2), pages 303-314.
    62. Pourakbar, Morteza & Dekker, Rommert, 2012. "Customer differentiated end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
    63. Bacchetti, A. & Plebani, F. & Saccani, N. & Syntetos, A.A., 2013. "Empirically-driven hierarchical classification of stock keeping units," International Journal of Production Economics, Elsevier, vol. 143(2), pages 263-274.
    64. Syntetos, Aris A. & Nikolopoulos, Konstantinos & Boylan, John E. & Fildes, Robert & Goodwin, Paul, 2009. "The effects of integrating management judgement into intermittent demand forecasts," International Journal of Production Economics, Elsevier, vol. 118(1), pages 72-81, March.
    65. A A Syntetos & J E Boylan & S M Disney, 2009. "Forecasting for inventory planning: a 50-year review," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 149-160, May.
    66. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    67. Porras, Eric & Dekker, Rommert, 2008. "An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods," European Journal of Operational Research, Elsevier, vol. 184(1), pages 101-132, January.
    68. Wang, Ling & Chu, Jian & Mao, Weijie, 2009. "A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure," European Journal of Operational Research, Elsevier, vol. 194(1), pages 184-205, April.
    69. Zied Jemai & Y Bouchery & Asma Ghaffari & Yves Dallery, 2012. "Including sustainability criteria into inventory models," Post-Print hal-01672398, HAL.
    70. Golam Kabir & M. Ahsan Akhtar Hasin, 2013. "Multi-criteria inventory classification through integration of fuzzy analytic hierarchy process and artificial neural network," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 14(1), pages 74-103.
    71. Behfard, S. & van der Heijden, M.C. & Al Hanbali, A. & Zijm, W.H.M., 2015. "Last time buy and repair decisions for spare parts," European Journal of Operational Research, Elsevier, vol. 244(2), pages 498-510.
    72. Liu, Jiapeng & Liao, Xiuwu & Zhao, Wenhong & Yang, Na, 2016. "A classification approach based on the outranking model for multiple criteria ABC analysis," Omega, Elsevier, vol. 61(C), pages 19-34.
    73. Rob J. Hyndman, 2006. "Another Look at Forecast Accuracy Metrics for Intermittent Demand," Foresight: The International Journal of Applied Forecasting, International Institute of Forecasters, issue 4, pages 43-46, June.
    74. Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
    75. Fortuin, Leonard, 1984. "Initial supply and re-order level of new service parts," European Journal of Operational Research, Elsevier, vol. 15(3), pages 310-319, March.
    76. Rustenburg, W. D. & van Houtum, G. J. & Zijm, W. H. M., 2001. "Spare parts management at complex technology-based organizations: An agenda for research," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 177-193, May.
    77. Lolli, F. & Ishizaka, A. & Gamberini, R., 2014. "New AHP-based approaches for multi-criteria inventory classification," International Journal of Production Economics, Elsevier, vol. 156(C), pages 62-74.
    78. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
    79. Teunter, Ruud H., 2006. "The multiple-job repair kit problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1103-1116, December.
    80. Z S Hua & B Zhang & J Yang & D S Tan, 2007. "A new approach of forecasting intermittent demand for spare parts inventories in the process industries," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 52-61, January.
    81. J E Boylan & A A Syntetos & G C Karakostas, 2008. "Classification for forecasting and stock control: a case study," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(4), pages 473-481, April.
    82. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2007. "Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity," International Journal of Production Economics, Elsevier, vol. 107(2), pages 404-421, June.
    83. Bouchery, Yann & Ghaffari, Asma & Jemai, Zied & Dallery, Yves, 2012. "Including sustainability criteria into inventory models," European Journal of Operational Research, Elsevier, vol. 222(2), pages 229-240.
    84. Lee, Loo Hay & Chew, Ek Peng & Teng, Suyan & Chen, Yankai, 2008. "Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem," European Journal of Operational Research, Elsevier, vol. 189(2), pages 476-491, September.
    85. Bakker, Monique & Riezebos, Jan & Teunter, Ruud H., 2012. "Review of inventory systems with deterioration since 2001," European Journal of Operational Research, Elsevier, vol. 221(2), pages 275-284.
    86. Syntetos, Aris A. & Boylan, John E., 2006. "On the stock control performance of intermittent demand estimators," International Journal of Production Economics, Elsevier, vol. 103(1), pages 36-47, September.
    87. Khanra, S. & Mandal, Buddhadev & Sarkar, Biswajit, 2013. "An inventory model with time dependent demand and shortages under trade credit policy," Economic Modelling, Elsevier, vol. 35(C), pages 349-355.
    88. Teunter, Ruud H. & Syntetos, Aris A. & Zied Babai, M., 2011. "Intermittent demand: Linking forecasting to inventory obsolescence," European Journal of Operational Research, Elsevier, vol. 214(3), pages 606-615, November.
    89. Altay Guvenir, H. & Erel, Erdal, 1998. "Multicriteria inventory classification using a genetic algorithm," European Journal of Operational Research, Elsevier, vol. 105(1), pages 29-37, February.
    90. R H Teunter & L Duncan, 2009. "Forecasting intermittent demand: a comparative study," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(3), pages 321-329, March.
    91. Thomas Spengler & Marcus Schröter, 2003. "Strategic Management of Spare Parts in Closed-Loop Supply Chains—A System Dynamics Approach," Interfaces, INFORMS, vol. 33(6), pages 7-17, December.
    92. Yelland, Phillip M., 2010. "Bayesian forecasting of parts demand," International Journal of Forecasting, Elsevier, vol. 26(2), pages 374-396, April.
    93. Babai, Zied & Boylan, John E. & Kolassa, Stephan & Nikolopoulos, Konstantinos, 2016. "Supply chain forecasting: Theory, practice, their gap and the futureAuthor-Name: Syntetos, Aris A," European Journal of Operational Research, Elsevier, vol. 252(1), pages 1-26.
    94. A H C Eaves & B G Kingsman, 2004. "Forecasting for the ordering and stock-holding of spare parts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(4), pages 431-437, April.
    95. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    96. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
    97. Jahangirian, Mohsen & Eldabi, Tillal & Naseer, Aisha & Stergioulas, Lampros K. & Young, Terry, 2010. "Simulation in manufacturing and business: A review," European Journal of Operational Research, Elsevier, vol. 203(1), pages 1-13, May.
    98. Teunter, Ruud H. & Fortuin, Leonard, 1998. "End-of-life service: A case study," European Journal of Operational Research, Elsevier, vol. 107(1), pages 19-34, May.
    99. Edward A. Silver, 1981. "Operations Research in Inventory Management: A Review and Critique," Operations Research, INFORMS, vol. 29(4), pages 628-645, August.
    100. Barabadi, Abbas & Barabady, Javad & Markeset, Tore, 2014. "Application of reliability models with covariates in spare part prediction and optimization – A case study," Reliability Engineering and System Safety, Elsevier, vol. 123(C), pages 1-7.
    101. Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
    102. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    103. Hu, Qiwei & Chakhar, Salem & Siraj, Sajid & Labib, Ashraf, 2017. "Spare parts classification in industrial manufacturing using the dominance-based rough set approach," European Journal of Operational Research, Elsevier, vol. 262(3), pages 1136-1163.
    104. Fildes, Robert, 1992. "The evaluation of extrapolative forecasting methods," International Journal of Forecasting, Elsevier, vol. 8(1), pages 81-98, June.
    105. Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
    106. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2009. "Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems," International Journal of Production Economics, Elsevier, vol. 118(1), pages 260-268, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
    2. Michele Compare & Luca Bellani & Enrico Cobelli & Enrico Zio & Francesco Annunziata & Fausto Carlevaro & Marzia Sepe, 2020. "A reinforcement learning approach to optimal part flow management for gas turbine maintenance," Journal of Risk and Reliability, , vol. 234(1), pages 52-62, February.
    3. Sgarbossa, Fabio & Peron, Mirco & Lolli, Francesco & Balugani, Elia, 2021. "Conventional or additive manufacturing for spare parts management: An extensive comparison for Poisson demand," International Journal of Production Economics, Elsevier, vol. 233(C).
    4. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    5. Mauricio Varas & Franco Basso & Armin Lüer-Villagra & Alejandro Mac Cawley & Sergio Maturana, 2019. "Managing premium wines using an $$(s - 1,s)$$ ( s - 1 , s ) inventory policy: a heuristic solution approach," Annals of Operations Research, Springer, vol. 280(1), pages 351-376, September.
    6. Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
    7. Topan, E. & van der Heijden, M.C., 2020. "Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions," European Journal of Operational Research, Elsevier, vol. 284(1), pages 164-175.
    8. Mario Fargnoli & Nicolas Haber & Massimo Tronci, 2022. "Case Study Research to Foster the Optimization of Supply Chain Management through the PSS Approach," Sustainability, MDPI, vol. 14(4), pages 1-19, February.
    9. Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
    10. Petchrompo, Sanyapong & Parlikad, Ajith Kumar, 2019. "A review of asset management literature on multi-asset systems," Reliability Engineering and System Safety, Elsevier, vol. 181(C), pages 181-201.
    11. N. Knofius & M. C. Heijden & A. Sleptchenko & W. H. M. Zijm, 2021. "Improving effectiveness of spare parts supply by additive manufacturing as dual sourcing option," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(1), pages 189-221, March.
    12. Neves-Moreira, Fábio & Veldman, Jasper & Teunter, Ruud H., 2021. "Service operation vessels for offshore wind farm maintenance: Optimal stock levels," Renewable and Sustainable Energy Reviews, Elsevier, vol. 146(C).
    13. Ye, Yuan & Lu, Yonggang & Robinson, Powell & Narayanan, Arunachalam, 2022. "An empirical Bayes approach to incorporating demand intermittency and irregularity into inventory control," European Journal of Operational Research, Elsevier, vol. 303(1), pages 255-272.
    14. Voorberg, S. & van Jaarsveld, W. & Eshuis, R. & van Houtum, G.J., 2023. "Information acquisition for service contract quotations made by repair shops," European Journal of Operational Research, Elsevier, vol. 305(3), pages 1166-1177.
    15. Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
    16. Giannis Karagiannis & Suzanna M. Paleologou, 2021. "A regression-based improvement to the multiple criteria ABC inventory classification analysis," Annals of Operations Research, Springer, vol. 306(1), pages 369-382, November.
    17. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    18. Kiesmüller, G.P. & Sachs, F.E., 2020. "Spare parts or buffer? How to design a transfer line with unreliable machines," European Journal of Operational Research, Elsevier, vol. 284(1), pages 121-134.
    19. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
    2. Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022. "Forecasting: theory and practice," International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
      • Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
    3. Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
    4. Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
    5. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    6. Hu, Qiwei & Chakhar, Salem & Siraj, Sajid & Labib, Ashraf, 2017. "Spare parts classification in industrial manufacturing using the dominance-based rough set approach," European Journal of Operational Research, Elsevier, vol. 262(3), pages 1136-1163.
    7. Pennings, Clint L.P. & van Dalen, Jan & van der Laan, Erwin A., 2017. "Exploiting elapsed time for managing intermittent demand for spare parts," European Journal of Operational Research, Elsevier, vol. 258(3), pages 958-969.
    8. Zhu, Sha & Dekker, Rommert & van Jaarsveld, Willem & Renjie, Rex Wang & Koning, Alex J., 2017. "An improved method for forecasting spare parts demand using extreme value theory," European Journal of Operational Research, Elsevier, vol. 261(1), pages 169-181.
    9. Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
    10. Jože Martin Rožanec & Blaž Fortuna & Dunja Mladenić, 2022. "Reframing Demand Forecasting: A Two-Fold Approach for Lumpy and Intermittent Demand," Sustainability, MDPI, vol. 14(15), pages 1-21, July.
    11. Kourentzes, Nikolaos, 2014. "On intermittent demand model optimisation and selection," International Journal of Production Economics, Elsevier, vol. 156(C), pages 180-190.
    12. Sheikh-Zadeh, Alireza & Rossetti, Manuel D., 2020. "Classification methods for problem size reduction in spare part provisioning," International Journal of Production Economics, Elsevier, vol. 219(C), pages 99-114.
    13. Li, Chongshou & Lim, Andrew, 2018. "A greedy aggregation–decomposition method for intermittent demand forecasting in fashion retailing," European Journal of Operational Research, Elsevier, vol. 269(3), pages 860-869.
    14. Ye, Yuan & Lu, Yonggang & Robinson, Powell & Narayanan, Arunachalam, 2022. "An empirical Bayes approach to incorporating demand intermittency and irregularity into inventory control," European Journal of Operational Research, Elsevier, vol. 303(1), pages 255-272.
    15. Prak, Dennis & Rogetzer, Patricia, 2022. "Timing intermittent demand with time-varying order-up-to levels," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1126-1136.
    16. Teunter, Ruud H. & Syntetos, Aris A. & Zied Babai, M., 2011. "Intermittent demand: Linking forecasting to inventory obsolescence," European Journal of Operational Research, Elsevier, vol. 214(3), pages 606-615, November.
    17. Rego, José Roberto do & Mesquita, Marco Aurélio de, 2015. "Demand forecasting and inventory control: A simulation study on automotive spare parts," International Journal of Production Economics, Elsevier, vol. 161(C), pages 1-16.
    18. Babai, Zied & Boylan, John E. & Kolassa, Stephan & Nikolopoulos, Konstantinos, 2016. "Supply chain forecasting: Theory, practice, their gap and the futureAuthor-Name: Syntetos, Aris A," European Journal of Operational Research, Elsevier, vol. 252(1), pages 1-26.
    19. Romeijnders, Ward & Teunter, Ruud & van Jaarsveld, Willem, 2012. "A two-step method for forecasting spare parts demand using information on component repairs," European Journal of Operational Research, Elsevier, vol. 220(2), pages 386-393.
    20. Petropoulos, Fotios & Wang, Xun & Disney, Stephen M., 2019. "The inventory performance of forecasting methods: Evidence from the M3 competition data," International Journal of Forecasting, Elsevier, vol. 35(1), pages 251-265.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:266:y:2018:i:2:p:395-414. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.