IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v199y2009i3p781-792.html
   My bibliography  Save this article

Designing multi-echelon service parts networks with finite repair capacity

Author

Listed:
  • Rappold, James A.
  • Van Roo, Ben D.

Abstract

We propose an approach to model and solve the joint problem of facility location, inventory allocation and capacity investment in a two echelon, single-item, service parts supply chain with stochastic demand. The objective of the decision problem is to minimize the total expected costs associated with (1) opening repair facilities, (2) assigning each field service location to an opened facility, (3) determining capacity levels of the opened repair facilities, and (4) optimizing inventory allocation among the locations. Due to the size of the problem, computational efficiency is essential. The accuracy of the approximations and effectiveness of the approach are analyzed with two numerical studies. The approach provides optimal results in 90% of scenarios tested and was within 2% of optimal when it did not.We explore the impact of capacity utilization, inventory availability, and lead times on the performance of the approach. We show that including tactical considerations jointly with strategic network design resulted in additional cost savings from 3% to 12%. Our contribution is the development of a practical model and approach to support the decision making process of joint facility location and multi-echelon inventory optimization.

Suggested Citation

  • Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
  • Handle: RePEc:eee:ejores:v:199:y:2009:i:3:p:781-792
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00700-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    2. Mark Daskin & Collette Coullard & Zuo-Jun Shen, 2002. "An Inventory-Location Model: Formulation, Solution Algorithm and Computational Results," Annals of Operations Research, Springer, vol. 110(1), pages 83-106, February.
    3. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    4. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
    5. Diaz, Angel & Fu, Michael C., 1997. "Models for multi-echelon repairable item inventory systems with limited repair capacity," European Journal of Operational Research, Elsevier, vol. 97(3), pages 480-492, March.
    6. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    7. Zuo-Jun Max Shen & Mark S. Daskin, 2005. "Trade-offs Between Customer Service and Cost in Integrated Supply Chain Design," Manufacturing & Service Operations Management, INFORMS, vol. 7(3), pages 188-207, September.
    8. Zuo-Jun Max Shen & Collette Coullard & Mark S. Daskin, 2003. "A Joint Location-Inventory Model," Transportation Science, INFORMS, vol. 37(1), pages 40-55, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Eskandarpour, Majid & Zegordi, Seyed Hessameddin & Nikbakhsh, Ehsan, 2013. "A parallel variable neighborhood search for the multi-objective sustainable post-sales network design problem," International Journal of Production Economics, Elsevier, vol. 145(1), pages 117-131.
    3. Yazdekhasti, Amin & sharifzadeh, Shila & Ma, Junfeng, 2022. "A two-echelon two-indenture warranty distribution network development and optimization under batch-ordering inventory policy," International Journal of Production Economics, Elsevier, vol. 249(C).
    4. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    5. Denise D. Tönissen & Joachim J. Arts & Zuo-Jun (Max) Shen, 2019. "Maintenance Location Routing for Rolling Stock Under Line and Fleet Planning Uncertainty," Transportation Science, INFORMS, vol. 53(5), pages 1252-1270, September.
    6. Candas, Mehmet Ferhat & Kutanoglu, Erhan, 2020. "Integrated location and inventory planning in service parts logistics with customer-based service levels," European Journal of Operational Research, Elsevier, vol. 285(1), pages 279-295.
    7. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
    8. Tavakoli Kafiabad, Shayan & Zanjani, Masoumeh Kazemi & Nourelfath, Mustapha, 2022. "Robust collaborative maintenance logistics network design and planning," International Journal of Production Economics, Elsevier, vol. 244(C).
    9. Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    10. Ozer, Muammer, 2011. "Understanding the impacts of product knowledge and product type on the accuracy of intentions-based new product predictions," European Journal of Operational Research, Elsevier, vol. 211(2), pages 359-369, June.
    11. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
    12. Tönissen, D.D. & Arts, J.J., 2018. "Economies of scale in recoverable robust maintenance location routing for rolling stock," Transportation Research Part B: Methodological, Elsevier, vol. 117(PA), pages 360-377.
    13. Kafiabad, Shayan Tavakoli & Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2020. "Integrated planning of operations and on-job training in maintenance logistics networks," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    14. Araceli Zavala & David Nowicki & Jose Emmanuel Ramirez-Marquez, 2019. "Quantitative metrics to analyze supply chain resilience and associated costs," Journal of Risk and Reliability, , vol. 233(2), pages 186-199, April.
    15. Xia, Li & Cao, Xi-Ren, 2012. "Performance optimization of queueing systems with perturbation realization," European Journal of Operational Research, Elsevier, vol. 218(2), pages 293-304.
    16. Jahani, Hamed & Abbasi, Babak & Sheu, Jiuh-Biing & Klibi, Walid, 2024. "Supply chain network design with financial considerations: A comprehensive review," European Journal of Operational Research, Elsevier, vol. 312(3), pages 799-839.
    17. van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
    18. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sun, Hao & Yang, Jun & Yang, Chao, 2019. "A robust optimization approach to multi-interval location-inventory and recharging planning for electric vehicles," Omega, Elsevier, vol. 86(C), pages 59-75.
    2. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    3. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    4. Navneet Vidyarthi & Emre Çelebi & Samir Elhedhli & Elizabeth Jewkes, 2007. "Integrated Production-Inventory-Distribution System Design with Risk Pooling: Model Formulation and Heuristic Solution," Transportation Science, INFORMS, vol. 41(3), pages 392-408, August.
    5. Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.
    6. Berman, Oded & Krass, Dmitry & Menezes, Mozart B.C., 2016. "Directed assignment vs. customer choice in location inventory models," International Journal of Production Economics, Elsevier, vol. 179(C), pages 179-191.
    7. van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
    8. Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
    9. Wenjun Ni & Jia Shu & Miao Song & Dachuan Xu & Kaike Zhang, 2021. "A Branch-and-Price Algorithm for Facility Location with General Facility Cost Functions," INFORMS Journal on Computing, INFORMS, vol. 33(1), pages 86-104, January.
    10. Hussein Naseraldin & Yale T. Herer, 2008. "Integrating the Number and Location of Retail Outlets on a Line with Replenishment Decisions," Management Science, INFORMS, vol. 54(9), pages 1666-1683, September.
    11. Farahani, Reza Zanjirani & Rezapour, Shabnam & Drezner, Tammy & Fallah, Samira, 2014. "Competitive supply chain network design: An overview of classifications, models, solution techniques and applications," Omega, Elsevier, vol. 45(C), pages 92-118.
    12. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    13. Kathryn E. Caggiano & Peter L. Jackson & John A. Muckstadt & James A. Rappold, 2007. "Optimizing Service Parts Inventory in a Multiechelon, Multi-Item Supply Chain with Time-Based Customer Service-Level Agreements," Operations Research, INFORMS, vol. 55(2), pages 303-318, April.
    14. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
    15. Burcu B. Keskin & Halit Üster, 2012. "Production/distribution system design with inventory considerations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(2), pages 172-195, March.
    16. Al-Rifai, Mohammad H. & Rossetti, Manuel D., 2007. "An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 195-213, September.
    17. Berman, Oded & Krass, Dmitry & Tajbakhsh, M. Mahdi, 2012. "A coordinated location-inventory model," European Journal of Operational Research, Elsevier, vol. 217(3), pages 500-508.
    18. Escalona, P. & Ordóñez, F. & Marianov, V., 2015. "Joint location-inventory problem with differentiated service levels using critical level policy," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 83(C), pages 141-157.
    19. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    20. Knofius, N. & van der Heijden, M.C. & Zijm, W.H.M., 2019. "Consolidating spare parts for asset maintenance with additive manufacturing," International Journal of Production Economics, Elsevier, vol. 208(C), pages 269-280.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:199:y:2009:i:3:p:781-792. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.