Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Stefan Minner
Additional information is available for the following registered editor(s):
Stefan Minner .
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
July 1993, Volume 30-31, Issue 1
- 489-499 An integrated approach to the layout of flexible transfer lines (FTLs): Buffer stocks allocation
by Abdel-Malek, Layek & Tang, Chi
- 501-518 Determining the number of spares in an inventory/repair system which supports equipment with scheduled usage
by Bridgman, Michael S. & Mount-Campbell, Clark A.
- 519-530 The economic lot size and relevant costs
by Corbey, Michael & Jansen, Rutger
- 531-542 Determining economic inventory policies in a multi-stage just-in-time production system
by Gunasekaran, A. & Goyal, S. K. & Martikainen, T. & Yli-Olli, P.
- 543-550 Inventory control of repairable tools with incomplete information
by Hamann, Thomas & Proth, Jean-Marie
- 551-562 Reducing system nervousness in multi-product inventory systems
by van der Sluis, Erik
- 563-569 Global relations between inventory, manufacturing lead time and delivery date promises
by Vastag, Gyula & Whybark, D. Clay
- 571-577 Freight rates for small shipments
by Arcelus, F. J. & Rowcroft, J. E.
- 579-589 Scheduling of packaging lines in the process industry: An empirical investigation
by van Dam, Peter & Gaalman, Gerard & Sierksma, Gerard
- 591-599 A practical solution to a newspaper distribution problem
by Mantel, R. J. & Fontein, M.
May 1993, Volume 29, Issue 3
- 237-247 Economy of scope, added value chain and cost dynamics: A tentative optimization model
by Durand, Thomas
- 249-257 Multilocation plant sizing and timing problem: Analysis of spatial decomposition procedure
by Kulkarni, R. V. & Mohanty, R. P.
- 259-269 An investigation of a simple logistic model
by Mehrez, A. & Kaspi, M. & Gitlitz, O.
- 271-289 Activity-based cost tables to support wire harness design
by Ong, N. S.
- 291-302 A comparison of allocation policies in a two-echelon repairable-item inventory model
by Buyukkurt, M. Demirbag & Parlar, M.
- 303-312 Estimation of the installed cost of heat exchanger networks
by Suaysompol, K. & Wood, R. M.
- 313-321 A microeconomic analysis of investment in just-in-time manufacturing
by Jewkes, E. & Power, M.
March 1993, Volume 29, Issue 2
- 125-138 A production planning and scheduling system at a chemical testing laboratory
by Chase, Richard B. & Rajagopalan, S.
- 139-148 Method of production smoothing for two-stage production and inventory system
by Ishii, Kazuyoshi & Minaki, Terumi & Hiraki, Shusaku
- 149-157 Simulation analyses of a maintenance float shop
by Madu, Christian N. & Kuei, Chu-Hua
- 159-166 Replacement policy under partially observed Markov process
by Sinuany-Stern, Zilla
- 167-174 Maintenance project management in the process industries: A look at the realities
by Pruett, James M. & Rinks, Dan B.
- 175-186 Heuristic approach to task scheduling: `weight' and `improve' algorithms
by Rafaeli, Dolev & Mahalel, David & Prashker, Joseph N.
- 187-201 Adapting traditional breakeven analysis to modern production economics: Simultaneously modeling economies of scale and scope
by Hanna, Mark D. & Newman, W. Rocky & Sridharan, Sri V.
- 203-210 Determining input parameters under process uncertainties
by `Nat' Natarajan, R.
- 211-222 Estimating the reduction in labor hours due to a new technology under uncertain demand
by Jang, Jaejin & Liu, C. Richard
- 223-231 A heuristic methodology to evaluate price discount structures from the buyer's perspective
by Madan, Manu & Bramorski, Tom & Gnanendran, Kingsley
February 1993, Volume 29, Issue 1
- 1-10 Cyclic machine loading, product allocation and lot sizing in an asbestos cement sheet factory
by Awate, Prakash G. & Tabucanon, Mario T.
- 11-25 Optimal buffer space for a periodic review production/inventory system with inventory-dependent production rate
by Sung, C. S. & Han, Y. H.
- 27-41 Methodology for converting a functional manufacturing system into a cellular manufacturing system
by Logendran, Rasaratnam
- 43-48 Scrap minimization in production processes with stochastic outputs
by Sounderpandian, Jayavel & Dhavale, Dileep G.
- 49-64 Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system
by Egbelu, Pius J.
- 65-73 Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
by Rajendran, Chandrasekharan
- 75-88 Sequencing picking operations and travel time models for man-on-board storage and retrieval warehousing system
by Hwang, Hark & Song, Jin Young
- 89-101 An investigation of due-date assignment using workload information of a dynamic shop
by Udo, Godwin
- 103-110 Failure predictions in repairable multi-component systems
by Roberts, W. Jr. & Mann, L. Jr.
- 111-122 Horizon extension for rolling production schedules: Length and accuracy requirements
by Russell, R. A. & Urban, T. L.
December 1992, Volume 28, Issue 3
- 255-263 Incentives for overhead cost reduction: Setup time and lot size considerations
by Hegde, G. G. & Nagarajan, Nandu J.
- 265-282 Impact of electronic data interchange technology on quality improvement and inventory reduction programs: A field study
by Kekre, Sunder & Mukhopadhyay, Tridas
- 283-288 Improved lot sizing heuristics for multi-stage inventory models with backlogging
by Voros, Jozsef & Chand, Suresh
- 289-297 Expectation-variance analyss of job sequences under processing time uncertainty
by De, Prabuddha & Ghosh, Jay B. & Wells, Charles E.
- 299-307 Timing the control point under the exponential stationary process
by Friedman, Lea
- 309-319 The optimal mix of flexible and dedicated manufacturing capacities: Hedging against demand uncertainty
by Gupta, Diwakar & Gerchak, Yigal & Buzacott, John A.
- 321-339 Impact of external factors on organizational performance
by Kolay, M. K. & Sahu, K. C.
- 341-352 Engineering changes and time delays: A field investigation
by Hegde, G. G. & Kekre, Sham & Kekre, Sunder
November 1992, Volume 28, Issue 2
- 131-142 The future factory: Challenge for one-of-a-kind production
by Eloranta, Eero
- 143-155 Production control in a kanban-like system with defective outputs
by Lee, Yong-Joo & Zipkin, Paul H.
- 157-169 Product mix selection and closed manufacturing cell flow time performance
by Deane, Richard H. & Yang, Jiaqin
- 171-174 A note on economic process levels under acceptance sampling by variables
by Boucher, Thomas O. & Jafari, Mohsen A.
- 175-191 Multi-item inventory policy under limited storehouse capacity
by Matsuyama, Keisuke
- 193-202 Modeling the deep space network costs for future space missions by using major cost drivers
by Remer, Donald S. & Sherif, Josef S. & Buchanan, Harry R.
- 203-210 A note on optimal order quantities for credit purchases
by Bregman, Robert L.
- 211-215 Parameter estimation and performance measurement in lost sales inventory systems
by Hill, Roger M.
- 217-225 The pallet loading problem: A survey
by Ram, Balasubramanian
- 227-234 Multi-attribute decision model using the analytic hierarchy process for the justification of manufacturing systems
by Datta, Vinay & Sambasivarao, K. V. & Kodali, Rambabu & Deshmukh, S. G.
- 235-252 The economic lot and delivery scheduling problem: The single item case
by Hahm, Juho & Yano, Candace Arai
November 1992, Volume 28, Issue 1
- 1-19 Kitting versus line stocking: A conceptual framework and a descriptive model
by Bozer, Yavuz A. & McGinnis, Leon F.
- 21-33 EOQ type formulations for controlling repairable inventories
by Mabini, Marilyn C. & Pintelon, Liliane M. & Gelders, Ludo F.
- 35-45 Competitive incentives for manufacturing flexibility
by Waller, Matthew A. & Christy, David P.
- 47-70 The "Orchard" scheduler for manufacturing systems
by Wittrock, Robert J.
- 71-84 Productivity measurement in multi-product manufacturing firms: Evaluation and control through sensitivity analysis
by Ray, Pradip K. & Sahu, S.
- 85-94 Optimal production policy for a single-product single-machine problem with intermediate machine inspection allowed
by Sung, C. S. & Ock, Young Seok
- 95-106 Consensus and conflicts in understanding productivity
by Mohanty, R. P.
- 107-126 Integrating design and production: A case study of the naval submarine program
by Eccles, Thomas J. & Marcus, Henry S.
- 127-127 Manufacturing & operations strategy : by Danny Samson, Prentice Hall, 1991, xi+499 pp
by Demeter, Krisztina
- 127-128 Software development: Project management : by Dina Berkeley, Robert de Hoog and Patrick Humphreys, Ellis Horwood, 1990, ISBN 0-13-829847-5
by Paprika, Zita
October 1992, Volume 27, Issue 3
- 187-219 Analysing divergent logistic networks with local (R, S) inventory control
by van der Heijden, M. C.
- 221-231 A strategic planning model for oilfield service and supply companies
by Bowker, Robert M. & Dyer, James S. & Fitzsimmons, James A. & Sinha, Kingshuk K.
- 233-240 A systematic procedure for the selection of bulk material handling equipment
by Velury, Jayadev & Kennedy, W. J.
- 241-250 A simple case of preventive maintenance decision-making with limited historical data
by Silver, Edward A. & Fiechter, Claude-Nicolas
- 251-256 An heuristic approach for finite time maintenance policy
by Jayabalan, V. & Chaudhuri, Dipak
- 257-264 Options in advanced energy-related production processes
by Lint, L. J. O.
- 265-282 A dynamic approach to operations management: An alternative to static optimization
by Jaikumar, Ramachandran & Bohn, Roger E.
- 283-289 "On-the-fly" line balancing with very little WIP
by McClain, John O. & Thomas, L. Joseph & Sox, Charles
- 291-291 The software engineers reference book : by John A. McDermid, Heinemann, 1991, 1032 pp
by Urban, Gabor
- 292-292 Erfolgsstrategien fur Zulieferer (successful strategies of suppliers) : by Robert Fieten, Gabler, 1991,220 pp
by Gelei, Andrea
May 1992, Volume 27, Issue 2
- 97-110 Replacement analysis for components of large scale production systems
by Luxhoj, James T.
- 111-117 Variations of order-level inventory models for deteriorating items
by Goswami, Adrijit & Chaudhuri, K. S.
- 119-126 Effects of cycle time on integrated procurement-production systems - Sensitivity analysis
by Goyal, S. K. & Deshmukh, S. G. & Babu, A. Subash
- 127-133 The profit-oriented interval cutting problem: model and stability analysis
by Richter, Knut
- 135-136 Comment on the "analytic Delphi method"
by McCarthy, Kevin J.
- 137-143 Scheduling in n-job, m-stage flowshop with parallel processors to minimize makespan
by Rajendran, Chandrasekharan & Chaudhuri, Dipak
- 145-153 The manufacture of soda ash in the Arabian Gulf
by Wagialla, K. M. & Al-Mutaz, I. S. & El-Dahshan, M. E.
- 155-160 Some results for inventory models having inventory level dependent demand rate
by Goh, Mark
- 161-165 The rate of return regulated version of Farrell efficiency
by Fare, Rolf & Logan, James
- 167-173 An organizational approach to product quality via statistical experiment design
by Goh, T. N.
- 175-181 Just-In-Time purchasing: Single or multiple sourcing?
by Hong, Jae-Dong & Hayya, Jack C.
- 183-183 Production control - A structural and design oriented approach : by J.W.M. Bertrand, J.C. Wortmann and J. Wijngaard, 1990, xi + 322 pp
by Rosling, Kaj
April 1992, Volume 27, Issue 1
- 1-8 A clustering analysis of forecasting methods in a multi-objective inventory system
by Mehrez, Abraham & Hu, Michael Y.
- 9-22 Evaluating the introduction of JIT
by Primrose, Peter L.
- 23-28 Determination of nested reorder intervals in a distribution network
by Iyogun, Paul
- 29-41 A compact heuristic for common cycle lot-size scheduling in multi-stage, multi-product production processes
by El-Najdawi, M. K.
- 43-56 Quality selection of a two-dimensional process level under single acceptance sampling by variables
by Carlsson, Olle
- 57-67 Continuous quality improvement: Why some organisations lack commitment
by Dale, B. G. & Lightburn, K.
- 69-81 Quality costing for total quality management
by Porter, Leslie J. & Rayner, Paul
- 83-90 Innovative output and firm size in the pharmaceutical industry
by Graves, Samuel B. & Langowitz, Nan S.
- 91-91 Quality improvement through standards : by Barry Dale and John Oakland, Stanley Thornes (Publishers) ltd. 1991. ISBN 0-7487-05558-9, 268 pp
by Demeter, Kristina
- 91-92 Storage and commodity markets : by Jeffry C. Williams and Brian D. Wright, Cambridge University Press, 1991, ISBN 0-521-32616-8 502 pp, $64.50
by Galei, Andrea
February 1992, Volume 26, Issue 1-3
- 1-1 Foreword
by Chikan, Attila
- 5-11 Does levelling lead to shortages? An empirical test
by Abel, I. & Bonin, J. P. & Szekely, I.
- 13-18 Linear model for Bulgarian inventory investment between 1962 and 1985
by Chankova, Lilia
- 19-23 Inventories in the economy in transition
by Chikan, Attila
- 25-32 A test of the linear rational expectations equilibrium inventory model in the EEC
by Dimelis, Sophia P.
- 33-41 Using mixed frequency data to improve macroeconomic forecasts of inventory investment
by Donihue, Michael R. & Howrey, E. Philip
- 43-48 Empirical estimation of three models of production and inventory behavior using monthly industry data
by Ghali, Moheb A.
- 49-59 Direct tests of the hypothesis that expectations are rational
by Irvine, F. Owen
- 61-70 Short term inventory and employment interplay in Finnish manufacturing industry
by Kylaheiko, Kalevi
- 71-78 Simulating a 100% just-in-time economy
by Lovell, Michael C.
- 79-88 The inventory investment equation: an empirical work using business survey data
by Modesto, Leonor
- 89-97 Weather-induced instability in agricultural produce with respect to buffer stocks in India and Iran: an integrated optimisation and dynamic input-output model
by Prasad, K. N. & Banouei, A. A. & Swaminathan, A. M.
- 99-105 Observation errors and inventory cycles
by Reiter, Michael
- 107-114 Inventories in macroeconomic fluctuations: the stylized facts
by Sebold-Bender, Monika
- 115-122 A comparison of the behavior of Japanese and US inventories
by West, Kenneth D.
- 125-134 Simulation of inventory control systems
by Alstrom, Poul & Madsen, Per
- 135-143 Electronic data interchange and inventories
by Anvari, Mohsen
- 145-151 Production lot sizing with work-in-process considerations in response to periodic demand
by Banerjee, Avijit
- 153-159 A simulation-based method to aid the improvement of manufacturing flexibility
by Byrne, M. D.
- 161-167 Mixed model assembly simulation
by Carlson, John G. & Yao, Andrew C.
- 169-172 Work in process: performance measures
by Fogarty, Donald W.
- 173-180 Simplicity, totality and change: a logistic viewpoint in inventory management
by Keloharju, Raimo
- 181-186 Relativity of the "new logistic technologies" and of their inventory aspects
by Kisperska-Moron, Danuta
- 187-192 A simulation study of bottleneck scheduling
by Neely, A. D. & Byrne, M. D.
- 193-201 The inventory investment decision and firm value: A conceptual framework
by Nyerges, Richard
- 203-210 Simulating the impact of process capability on lot sizes in batch manufacturing
by Palaniswami, Shanthakumar
- 211-216 Strategic inventory management of renewable energy resources. Aluminium as an energy storage medium and market commodity
by Partington, E. C.
- 217-220 An overview of the state and problems of inventory management in Finland
by Pirttila, Timo & Virolainen, Veli-Matti
- 221-227 The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis
by Rao, S. Subba
- 229-236 A decision support system for materials management
by Speranza, M. G. & Ukovich, W.
- 237-241 Forming the material supply structure through the choice of the production cooperation range
by Sygit, Maciej
- 243-246 Principal economic decisions of operational production management in Czechoslovak enterprises of electrotechnical industry
by Tomek, Gustav
- 247-255 The system implications of pure manufacturing policy options
by Walbank, Martin
- 257-264 Hierarchical production planning and multi-echelon inventory management
by Zijm, W. H. M.
- 267-272 Some issues on the modelling of incentives for special sales
by Arcelus, F. J. & Srinivasan, G.
- 273-276 Combinatorial optimization of the location--inventory problem
by Bogataj, Marija & Bogataj, Ludvik
- 277-281 Perturbed inventory systems with delays
by Bogataj, L. & Bogataj, M.
- 283-291 Heavy-traffic inventory--production systems
by Bulinskaya, E. V.
- 293-296 Performance optimization of a system through the transitive interaction between its sections
by Fragopoulou-Manthou, V. & Kalfakakou, R.
- 297-298 Order point/order quantity models with random yield
by Gerchak, Yigal
- 299-302 Controlled stochastic processes and inventories
by Girlich, Hans-Joachim & Kolkwitz, Bernd
- 303-310 Hypergame analysis of the stability of relationships between computerbased logistics systems
by Graham, Ian & O'Doherty, Fiona & McKinnon, Alan & Baxter, Lynne
- 311-318 Intertemporal generalization of the relationship between material requirements planning and input-output analysis
by Grubbstrom, Robert W. & Ovrin, Peter
- 319-326 Extension of a reliability-type inventory model to just-in-time systems
by Kelle, Peter & Schneider, Helmut
- 327-332 A stochastic inventory problem with piecewise quadratic costs
by Parlar, Mahmut & Rempala, Ryszarda
- 333-339 Single facility, multi-item lot sizing under just-in-time and "cyclic scheduling for improvement"
by Ramani, S. & Narayanan, N.
- 341-345 Average cost estimation of lot-sizing heuristics
by Richter, Knut
- 347-351 Changing the givens in modelling inventory problems: the example of just-in-time systems
by Silver, Edward A.
- 353-358 Minimum cost allocation of supply centers with limitation on time delivery
by Tsouros, C. & Satratzemi, M.
- 359-366 Multiple batch structures in throughput scheduling
by Weeda, P. J.
- 367-371 Incremental order quantity for the case of very lumpy demand
by Yilmaz, Cengiz
March 1992, Volume 24, Issue 3
- 209-216 The EUT maintenance model
by Geraerds, W. M. J.
- 217-226 Design of maintenance concepts
by Gits, C. W.
- 227-234 Revising models of maintenance and inspection
by Christer, A. H. & Redmond, D. F.
- 235-242 The reliability of equipment: Yesterday's research and tomorrow's requirements
by Collcutt, R. H.
- 243-248 The use of knowledge-based systems in evaluation and enhancement of maintenance routines
by Kobbacy, Khairy A. H.
- 249-261 Evaluation methods of standard software with respect to their effectiveness
by Martin, H. H.
- 263-272 Design and implementation of a maintenance planning and control system
by Ulusoy, Gunduz & Or, Ilhan & Soydan, Nezih
- 273-284 Economics of pipeline maintenance and replacement
by Sheikh, Anwar Khalil & Saleem, Muhammed
- 285-290 Optimal spare allocation problem based on the interval estimate of availability
by Yanagi, Shigeru & Aso, Kazuhiko & Sasaki, Masafumi
- 291-300 SPARTA II: Further development in an expert system for advising on stocks of spare parts
by Petrovic, D. & Petrovic, R.
1991, Volume 25, Issue 1-3
- 1-4 Manufacturing and operation management: Asia-Pacific orientation
by Tabucanon, Mario T.
- 5-12 Strategic integrated manufacturing systems: the concept and structures
by Hitomi, Katsundo
- 13-21 Deriving advantages from advanced manufacturing technology -- an organizing paradigm
by Chung, K.B.
- 23-33 Estimating inventory variance with the batch means method
by Takahashi, Katsuhiko & Hiraki, Shusaku & Soshiroda, Michio
- 35-38 An economic batch production quantity model with learning curve-dependent effects: a technical note
by Shiue, Yih-Chearng
- 39-49 An integrated production-inventory-distribution model for manufacture of urea: a case
by Haq, A. Noorul & Vrat, Prem & Kanda, Arun
- 51-64 MRP with uncertainty: a review and some extensions
by Murthy, D.N.P. & Ma, L.
- 65-72 MRP: an adaptive approach
by Al-Hakim, Latif A. & Jenney, Brian W.
- 73-79 Computerised materials requirement planning in manufacturing companies in Malaysia
by Hamid, Aziz A. & Agus, Arawati & Mat Hassan, Mohd. Ezani
- 81-87 A two-tier hierarchical scheduler for the micro-electronic industry
by Dar-El, Ezey M. & Sofer, Pnina & Molcho, Itzik & Shtrichman, Ofer
- 89-94 Conveyor scheduling system for a feeds manufacturing plant: a case study
by del Rosario, Elise A. & Cruz, Samuel B. & Gimalay, Anna Liza C.
- 95-101 Bicriterion scheduling problem in a job shop with parallel processors
by Cenna, Ahmed Abu & Tabucanon, Mario T.
- 103-109 Using learning theory in assembly lines for new products
by Dar-El, Ezey M. & Rubinovitz, Jacob
- 111-119 Loading problem and resource considerations in FMS: a review
by Shanker, Kripa & Agrawal, Anil Kumar
- 121-127 Overview of models and DSS in planning and scheduling of FMS
by Dhar, U.R.
- 129-140 Cycle time models for single/double carousel system
by Hwang, Hark & Ha, Jae-Won
- 141-153 Flexible part-feeding system for machine loading and assembly. Part I. A state-of-the-art survey
by Lee, Kok-Meng
- 155-168 Flexible part-feeding system for machine loading and assembly. Part II. A cost-effective solution
by Lee, Kok-Meng
- 169-180 A study on the design of CNC lathe for education and application
by Kim, Jeong-Du & Kim, Myung-Hwan
- 181-190 The cost of manufacturing toys in the Shenzhen special economic zone of China
by Chan, J.C.M. & Sculli, D. & Si, K.
- 191-200 Planning for technological substitution and change
by Chambers, Michael R.
- 201-217 Water resources planning under budgetary uncertainty: the case in Indonesia
by Sutardi & Cheng, T.C.E. & Goulter, Ian
- 219-229 Japanese direct investment in Asia-Pacific and other regions: Empirical analysis using MITI survey data
by Nakamura, Masao
November 1991, Volume 24, Issue 1-2
- 1-9 Relevance lost? A critical discussion of different cost accounting principles in connection with decision making for both short and long term production scheduling
by Bakke, Nils Arne & Hellberg, Roland
- 19-27 Inventory structure in the manufacturing industry -- A cross-country comparison
by Chikan, Attila
- 29-39 Application of the ORESTE method to a nuclear waste management problem
by Delhaye, C. & Teghem, J. & Kunsch, P.
- 41-47 Technical audit: How to assess the technological standard of a company
by Detter, Helmut & Hinterhuber, Hans H. & Worndl-Alchriedler, Hans
- 49-54 The Modigliani-Hohn model with capacity and warehousing constraints
by Dobos, Imre
- 55-64 Just-in-Time logistics of a supplier in the car manufacturing industry
by Fandel, Gunter & Reese, Joachim
- 65-76 Master production scheduling: a function based approach
by Giesberts, Paul M. J.
- 77-90 Feeding parts to an assembly line by several production units
by Golenko Ginzburg, Dimitri & Goldfeld, Anatoly
- 91-101 Customs clearance and electronic data interchange -- A study of Norwegian freight forwarders using EDI
by Hellberg, Roland & Sannes, Ragnvald
- 103-113 Safety stock optimization in multi-stage inventory systems
by Inderfurth, Karl
- 115-128 Logistics management: a method for evaluation of production-distribution investments
by Kivijarvi, Hannu & Tuominen, Markku
- 129-135 Short term inventory and employment adjustment dynamics in Finnish forest industry
by Kylaheiko, Kalevi
- 137-145 Quality and productivity: the linkage
by Mefford, Robert N.
- 147-156 Simulation analysis of a JIT production line
by Meral, Sedef & Erkip, Nesim
- 157-163 Behavioral implications of the learning curve for production capacity analysis
by Pananiswami, Shanthakumar & Bishop, Ronald C.
- 165-173 The calculation of operational performance ratings
by Parkan, Celik