IDEAS home Printed from https://ideas.repec.org/r/wly/navlog/v23y1976i3p353-388.html
   My bibliography  Save this item

A survey of maintenance models: The control and surveillance of deteriorating systems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Yuqian Xu & Lingjiong Zhu & Michael Pinedo, 2020. "Operational Risk Management: A Stochastic Control Framework with Preventive and Corrective Controls," Operations Research, INFORMS, vol. 68(6), pages 1804-1825, November.
  2. Wallace J. Hopp & Yar‐Lin Kuo, 1998. "Heuristics for multicomponent joint replacement: Applications to aircraft engine maintenance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(5), pages 435-458, August.
  3. Rommert Dekker & Eric Smeitink, 1994. "Preventive maintenance at opportunities of restricted duration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(3), pages 335-353, April.
  4. Kut C. So, 1992. "Optimality of control limit policies in replacement models," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 685-697, August.
  5. Park, Chong Hyun & Lim, Heejong, 2021. "A parametric approach to integer linear fractional programming: Newton’s and Hybrid-Newton methods for an optimal road maintenance problem," European Journal of Operational Research, Elsevier, vol. 289(3), pages 1030-1039.
  6. Gert Heinrich & Uwe Jensen, 1992. "Optimal replacement rules based on different information levels," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(7), pages 937-955, December.
  7. Wallace J. Hopp & Sung‐Chi Wu, 1988. "Multiaction maintenance under markovian deterioration and incomplete state information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(5), pages 447-462, October.
  8. Ian M. Dobbs, 2004. "Replacement Investment: Optimal Economic Life Under Uncertainty," Journal of Business Finance & Accounting, Wiley Blackwell, vol. 31(5‐6), pages 729-757, June.
  9. Yeek-Hyun Kim & Lyn Thomas, 2013. "Training and repair policies for stand-by systems," Annals of Operations Research, Springer, vol. 208(1), pages 469-487, September.
  10. Retsef Levi & Thomas Magnanti & Yaron Shaposhnik, 2019. "Scheduling with Testing," Management Science, INFORMS, vol. 65(2), pages 776-793, February.
  11. V. Jayabalan & Dipak Chaudhuri, 1992. "Optimal maintenance and replacement policy for a deteriorating system with increased mean downtime," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(1), pages 67-78, February.
  12. Scott G. Frickenstein & Lyn R. Whitaker, 2003. "Age replacement policies in two time scales," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(6), pages 592-613, September.
  13. David L. Kaufman & Mark E. Lewis, 2007. "Machine maintenance with workload considerations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(7), pages 750-766, October.
  14. Stephen M. Gilbert & Hena M Bar, 1999. "The value of observing the condition of a deteriorating machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 790-808, October.
  15. Dmitry BANNIKOV & Nina SIRINA & Alexander SMOLYANINOV, 2018. "Model Of The Maintenance And Repair System In Service Maintenance Management," Transport Problems, Silesian University of Technology, Faculty of Transport, vol. 13(3), pages 5-14, September.
  16. Kim, Sang-Hoon & Srinivasan, V. Seenu, 2006. "A Conjoint-Hazard Model of the Timing of Buyers' Upgrading to Improved Versions of High Technology Products," Research Papers 1720r1, Stanford University, Graduate School of Business.
  17. S. Bylka & S. Sethi & G. Sorger, 1992. "Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(4), pages 487-507, June.
  18. Yue Hu & Carri W. Chan & Jing Dong, 2022. "Optimal Scheduling of Proactive Service with Customer Deterioration and Improvement," Management Science, INFORMS, vol. 68(4), pages 2533-2578, April.
  19. Alireza Sabouri & Woonghee Tim Huh & Steven M. Shechter, 2017. "Screening Strategies for Patients on the Kidney Transplant Waiting List," Operations Research, INFORMS, vol. 65(5), pages 1131-1146, October.
  20. C. Teresa Lam & R. H. Yeh, 1994. "Optimal replacement policies for multistate deteriorating systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(3), pages 303-315, April.
  21. Maria Chiara Magnanini & Tullio Tolio, 2020. "Switching- and hedging- point policy for preventive maintenance with degrading machines: application to a two-machine line," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 241-271, June.
  22. Wenqi Hu & Carri W. Chan & José R. Zubizarreta & Gabriel J. Escobar, 2018. "An Examination of Early Transfers to the ICU Based on a Physiologic Risk Score," Manufacturing & Service Operations Management, INFORMS, vol. 20(3), pages 531-549, July.
  23. James Flynn & Chia‐Shin Chung, 2002. "A branch and bound algorithm for computing optimal replacement policies in consecutive k‐out‐of‐n‐systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(3), pages 288-302, April.
  24. Wang, Wei & Wu, Zhiying & Xiong, Junlin & Xu, Yaofeng, 2018. "Redundancy optimization of cold-standby systems under periodic inspection and maintenance," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 394-402.
  25. Lisa M. Maillart & Xiang Fang, 2006. "Optimal maintenance policies for serial, multi‐machine systems with non‐instantaneous repairs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(8), pages 804-813, December.
  26. Chia‐Shin Chung & James Flynn, 1997. "A heuristic algorithm for determining replacement policies in k‐out‐of‐n systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 273-286, April.
  27. Xiaodong Yao & Xiaolan Xie & Michael C. Fu & Steven I. Marcus, 2005. "Optimal joint preventive maintenance and production policies," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(7), pages 668-681, October.
  28. Yuri Merizalde & Luis Hernández-Callejo & Oscar Duque-Perez & Víctor Alonso-Gómez, 2019. "Maintenance Models Applied to Wind Turbines. A Comprehensive Overview," Energies, MDPI, vol. 12(2), pages 1-41, January.
  29. Wallace J. Hopp & Suresh K. Nair, 1991. "Timing replacement decisions under discontinuous technological change," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 203-220, April.
  30. Pinciroli, Luca & Baraldi, Piero & Zio, Enrico, 2023. "Maintenance optimization in industry 4.0," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
  31. Feng Tian & Peng Sun & Izak Duenyas, 2021. "Optimal Contract for Machine Repair and Maintenance," Operations Research, INFORMS, vol. 69(3), pages 916-949, May.
  32. David T. Abdul‐Malak & Jeffrey P. Kharoufeh & Lisa M. Maillart, 2019. "Maintaining systems with heterogeneous spare parts," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(6), pages 485-501, September.
  33. Steven M. Shechter & Matthew D. Bailey & Andrew J. Schaefer, 2008. "Replacing nonidentical vital components to extend system life," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(7), pages 700-703, October.
  34. Nagraj Balakrishnan & Amiya K. Chakravarty, 2001. "Opportunistic retooling of a flexible machine subject to failure," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(1), pages 79-97, February.
  35. Ki Ling Cheung & Warren H. Hausman, 1997. "Joint determination of preventive maintenance and safety stocks in an unreliable production environment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 257-272, April.
  36. Schouten, Thijs Nicolaas & Dekker, Rommert & Hekimoğlu, Mustafa & Eruguz, Ayse Sena, 2022. "Maintenance optimization for a single wind turbine component under time-varying costs," European Journal of Operational Research, Elsevier, vol. 300(3), pages 979-991.
  37. F. A. Van Der Duyn Schouten & P. Wartenhorst, 1993. "A two‐machine repair model with variable repair rate," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 495-523, June.
  38. Philip C. Jones & James L. Zydiak & Wallace J. Hopp, 1991. "Parallel machine replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(3), pages 351-365, June.
  39. Mark G. Tang, 1993. "A stochastic machine maintenance and sale problem: Results with different production functions," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(5), pages 677-696, August.
  40. Ciriaco Valdez‐Flores & Richard M. Feldman, 1989. "A survey of preventive maintenance models for stochastically deteriorating single‐unit systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 36(4), pages 419-446, August.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.