Timing replacement decisions under discontinuous technological change
Author
Abstract
Suggested Citation
DOI: 10.1002/1520-6750(199104)38:23.0.CO;2-E
Download full text from publisher
References listed on IDEAS
- Wallace J. Hopp, 1989. "Technical Note—Identifying Forecast Horizons in Nonhomogeneous Markov Decision Processes," Operations Research, INFORMS, vol. 37(2), pages 339-343, April.
- James C. Bean & Robert L. Smith, 1984. "Conditions for the Existence of Planning Horizons," Mathematics of Operations Research, INFORMS, vol. 9(3), pages 391-401, August.
- William P. Pierskalla & John A. Voelker, 1976. "A survey of maintenance models: The control and surveillance of deteriorating systems," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 23(3), pages 353-388, September.
- S. P. Sethi & T. E. Morton, 1972. "A mixed optimization technique for the generalized machine replacement problem," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 19(3), pages 471-481, September.
- Suresh Chand & Suresh Sethi, 1982. "Planning horizon procedures for machine replacement models with several possible replacement alternatives," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 29(3), pages 483-493, September.
- Tzvi Goldstein & Shaul P. Ladany & Abraham Mehrez, 1988. "A discounted machine‐replacement model with an expected future technological breakthrough," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(2), pages 209-220, April.
- Y. S. Sherif & M. L. Smith, 1981. "Optimal maintenance models for systems subject to failure–A Review," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 28(1), pages 47-74, March.
- Suresh Sethi & Suresh Chand, 1979. "Planning Horizon Procedures for Machine Replacement Models," Management Science, INFORMS, vol. 25(2), pages 140-151, February.
- C. Bes & S. P. Sethi, 1988. "Concepts of Forecast and Decision Horizons: Applications to Dynamic Stochastic Optimization Problems," Mathematics of Operations Research, INFORMS, vol. 13(2), pages 295-310, May.
- Sethi, Suresh P. & Taksar, Michael I. & Presman, Ernst L., 1995.
"Erratum,"
Journal of Economic Dynamics and Control, Elsevier, vol. 19(5-7), pages 1297-1298.
- Suresh P. Sethi & Suresh Chand, 1980. "Erratum to "Planning Horizon Procedures for Machine Replacement Models"," Management Science, INFORMS, vol. 26(3), pages 342-342, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Natali Hritonenko & Yuri Yatsenko, 2012. "Fleet replacement under technological shocks," Annals of Operations Research, Springer, vol. 196(1), pages 311-331, July.
- A. Bensoussan & Q. Feng & S. P. Sethi, 2022. "Integrating equipment investment strategy with maintenance operations under uncertain failures," Annals of Operations Research, Springer, vol. 317(2), pages 353-386, October.
- Israel David & Eitan Greenshtein & Avraham Mehrez, 1997. "A dynamic‐programming approach to continuous‐review obsolescent inventory problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 757-774, December.
- Joseph C. Hartman, 2000. "The parallel replacement problem with demand and capital budgeting constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(1), pages 40-56, February.
- Ali Dogramaci & Nelson M. Fraiman, 2004. "Replacement Decisions with Maintenance Under Uncertainty: An Imbedded Optimal Control Model," Operations Research, INFORMS, vol. 52(5), pages 785-794, October.
- Miles Gietzmann & Adam Ostaszewski, 2004. "Predicting firm value: the superiority of -theory over residual income," Accounting and Business Research, Taylor & Francis Journals, vol. 34(4), pages 349-377.
- Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
- Zhi‐Long Chen, 1998. "Solution algorithms for the parallel replacement problem under economy of scale," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(3), pages 279-295, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- S. Bylka & S. Sethi & G. Sorger, 1992. "Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(4), pages 487-507, June.
- Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
- Philip C. Jones & James L. Zydiak & Wallace J. Hopp, 1991. "Parallel machine replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(3), pages 351-365, June.
- Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
- A. Bensoussan & Q. Feng & S. P. Sethi, 2022. "Integrating equipment investment strategy with maintenance operations under uncertain failures," Annals of Operations Research, Springer, vol. 317(2), pages 353-386, October.
- Ali Dogramaci & Nelson M. Fraiman, 2004. "Replacement Decisions with Maintenance Under Uncertainty: An Imbedded Optimal Control Model," Operations Research, INFORMS, vol. 52(5), pages 785-794, October.
- Suresh P. Sethi & Sushil Gupta & Vipin K. Agrawal & Vijay K. Agrawal, 2022. "Nobel laureates’ contributions to and impacts on operations management," Production and Operations Management, Production and Operations Management Society, vol. 31(12), pages 4283-4303, December.
- Tzvi Goldstein & Shaul P. Ladany & Abraham Mehrez, 1988. "A discounted machine‐replacement model with an expected future technological breakthrough," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(2), pages 209-220, April.
- Israel David & Eitan Greenshtein & Avraham Mehrez, 1997. "A dynamic‐programming approach to continuous‐review obsolescent inventory problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 757-774, December.
- Torpong Cheevaprawatdomrong & Irwin E. Schochetman & Robert L. Smith & Alfredo Garcia, 2007. "Solution and Forecast Horizons for Infinite-Horizon Nonhomogeneous Markov Decision Processes," Mathematics of Operations Research, INFORMS, vol. 32(1), pages 51-72, February.
- Archis Ghate & Robert L. Smith, 2013. "A Linear Programming Approach to Nonstationary Infinite-Horizon Markov Decision Processes," Operations Research, INFORMS, vol. 61(2), pages 413-425, April.
- Mørch, Ove & Fagerholt, Kjetil & Pantuso, Giovanni & Rakke, Jørgen, 2017. "Maximizing the rate of return on the capital employed in shipping capacity renewal," Omega, Elsevier, vol. 67(C), pages 42-53.
- Rommert Dekker & Eric Smeitink, 1994.
"Preventive maintenance at opportunities of restricted duration,"
Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(3), pages 335-353, April.
- Dekker, R. & Smeitink, E., 1991. "Preventive maintenance at opportunities of restricted duration," Serie Research Memoranda 0038, VU University Amsterdam, Faculty of Economics, Business Administration and Econometrics.
- Yu. Yatsenko & N. Hritonenko, 2007. "Network economics and optimal replacement of age-structured IT capital," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 65(3), pages 483-497, June.
- David T. Abdul‐Malak & Jeffrey P. Kharoufeh & Lisa M. Maillart, 2019. "Maintaining systems with heterogeneous spare parts," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(6), pages 485-501, September.
- Bauer, L. & Mumey, G.A. & Lohr, W., 1989. "Economic Replacement Strategies for Dairy Cattle," Project Report Series 232069, University of Alberta, Department of Resource Economics and Environmental Sociology.
- Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
- Pinciroli, Luca & Baraldi, Piero & Zio, Enrico, 2023. "Maintenance optimization in industry 4.0," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
- Sampath Rajagopalan & Medini R. Singh & Thomas E. Morton, 1998. "Capacity Expansion and Replacement in Growing Markets with Uncertain Technological Breakthroughs," Management Science, INFORMS, vol. 44(1), pages 12-30, January.
- Suresh Chand & Tim McClurg & Jim Ward, 1993. "A single‐machine replacement model with learning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(2), pages 175-192, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:38:y:1991:i:2:p:203-220. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.