IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v30y1982i2p391-399.html
   My bibliography  Save this item

Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Baruch Mor, 2022. "Minmax common flow-allowance problems with convex resource allocation and position-dependent workloads," Journal of Combinatorial Optimization, Springer, vol. 43(1), pages 79-97, January.
  2. Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Group scheduling and due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 130(2), pages 230-235, April.
  3. Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
  4. Ramon Alvarez-Valdes & Enric Crespo & Jose Tamarit & Fulgencia Villa, 2012. "Minimizing weighted earliness–tardiness on a single machine with a common due date using quadratic models," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 20(3), pages 754-767, October.
  5. W-H Kuo & D-L Yang, 2008. "A note on due-date assignment and single-machine scheduling with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(6), pages 857-859, June.
  6. Shabtay, Dvir & Steiner, George & Zhang, Rui, 2016. "Optimal coordination of resource allocation, due date assignment and scheduling decisions," Omega, Elsevier, vol. 65(C), pages 41-54.
  7. Danny Hermelin & Dvir Shabtay & Chen Zelig & Michael Pinedo, 2022. "A general scheme for solving a large set of scheduling problems with rejection in FPT time," Journal of Scheduling, Springer, vol. 25(2), pages 229-255, April.
  8. Soroush, H. M., 1999. "Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs," European Journal of Operational Research, Elsevier, vol. 113(2), pages 450-468, March.
  9. Shabtay, Dvir & Mosheiov, Gur & Oron, Daniel, 2022. "Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work," European Journal of Operational Research, Elsevier, vol. 303(1), pages 66-77.
  10. Min Ji & Xin Zhang & Xiaoying Tang & T.C.E. Cheng & Guiyi Wei & Yuanyuan Tan, 2016. "Group scheduling with group-dependent multiple due windows assignment," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1244-1256, February.
  11. Jin Qian & Yu Zhan, 2022. "The Due Window Assignment Problems with Deteriorating Job and Delivery Time," Mathematics, MDPI, vol. 10(10), pages 1-16, May.
  12. Biskup, Dirk, 1999. "Single-machine scheduling with learning considerations," European Journal of Operational Research, Elsevier, vol. 115(1), pages 173-178, May.
  13. Prabuddha De & Jay B. Ghosh & Charles E. Wells, 1994. "Due‐date assignment and early/tardy scheduling on identical parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 17-32, February.
  14. Shi-Sheng Li & Ren-Xia Chen, 2017. "Scheduling with Rejection and a Deteriorating Maintenance Activity on a Single Machine," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(02), pages 1-17, April.
  15. Koulamas, Christos & Gupta, Sushil & Kyparisis, George J., 2010. "A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times," European Journal of Operational Research, Elsevier, vol. 205(2), pages 479-482, September.
  16. Koulamas, Christos, 2010. "The single-machine total tardiness scheduling problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 202(1), pages 1-7, April.
  17. Sang, Yao-Wen & Wang, Jun-Qiang & Sterna, Małgorzata & Błażewicz, Jacek, 2023. "Single machine scheduling with due date assignment to minimize the total weighted lead time penalty and late work," Omega, Elsevier, vol. 121(C).
  18. Zhanguo Zhu & Feifeng Zheng & Chengbin Chu, 2017. "Multitasking scheduling problems with a rate-modifying activity," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 296-312, January.
  19. Koulamas, Christos & Kyparisis, George J., 2023. "Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection," European Journal of Operational Research, Elsevier, vol. 305(2), pages 608-616.
  20. Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
  21. Bernard Dickman & Yonah Wilamowsky & Sheldon Epstein, 2001. "Multiple common due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(4), pages 293-298, June.
  22. Gur Mosheiov & Daniel Oron, 2004. "Due‐window assignment with unit processing‐time jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(7), pages 1005-1017, October.
  23. Adamopoulos, George I. & Pappis, Costas P., 1996. "A fuzzy-linguistic approach to a multi-criteria sequencing problem," European Journal of Operational Research, Elsevier, vol. 92(3), pages 628-636, August.
  24. Baruch Mor & Gur Mosheiov, 2021. "A note on the single machine CON and CONW problems with lot scheduling," Journal of Combinatorial Optimization, Springer, vol. 42(2), pages 327-338, August.
  25. Yanıkoğlu, İhsan & Yavuz, Tonguc, 2022. "Branch-and-price approach for robust parallel machine scheduling with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 301(3), pages 875-895.
  26. Klaus Heeger & Danny Hermelin & George B. Mertzios & Hendrik Molter & Rolf Niedermeier & Dvir Shabtay, 2023. "Equitable scheduling on a single machine," Journal of Scheduling, Springer, vol. 26(2), pages 209-225, April.
  27. Lin, Shih-Wei & Chou, Shuo-Yan & Ying, Kuo-Ching, 2007. "A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1294-1301, March.
  28. Biskup, Dirk & Simons, Dirk, 2004. "Common due date scheduling with autonomous and induced learning," European Journal of Operational Research, Elsevier, vol. 159(3), pages 606-616, December.
  29. Liu, Ming & Wang, Shijin & Chu, Chengbin, 2013. "Scheduling deteriorating jobs with past-sequence-dependent delivery times," International Journal of Production Economics, Elsevier, vol. 144(2), pages 418-421.
  30. Huynh Tuong, Nguyen & Soukhal, Ameur, 2010. "Due dates assignment and JIT scheduling with equal-size jobs," European Journal of Operational Research, Elsevier, vol. 205(2), pages 280-289, September.
  31. Shabtay, Dvir, 2010. "Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs," International Journal of Production Economics, Elsevier, vol. 123(1), pages 235-242, January.
  32. Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
  33. Adamopoulos, G. I. & Pappis, C. P., 1996. "Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method," European Journal of Operational Research, Elsevier, vol. 88(2), pages 336-344, January.
  34. Dvir Shabtay & George Steiner, 2008. "The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times," Annals of Operations Research, Springer, vol. 159(1), pages 25-40, March.
  35. Uttarayan Bagchi & Yih‐Long Chang & Robert S. Sullivan, 1987. "Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(5), pages 739-751, October.
  36. W-H Kuo & D-L Yang, 2011. "A note on due-date assignment and single-machine scheduling with deteriorating jobs and learning effects," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 206-210, January.
  37. Ying Chen & Xiaole Ma & Guiqing Zhang & Yongxi Cheng, 2023. "On optimal due date assignment without restriction and resource allocation in group technology scheduling," Journal of Combinatorial Optimization, Springer, vol. 45(2), pages 1-19, March.
  38. Adamopoulos, G. I. & Pappis, C. P., 1995. "The CON due-date determination method with processing time-dependent lateness penalties," International Journal of Production Economics, Elsevier, vol. 40(1), pages 29-36, June.
  39. Oğuzhan Ahmet Arik, 2023. "A heuristic for single machine common due date assignment problem with different earliness/tardiness weights," OPSEARCH, Springer;Operational Research Society of India, vol. 60(3), pages 1561-1574, September.
  40. G Mosheiov & A Sarig, 2008. "A due-window assignment problem with position-dependent processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(7), pages 997-1003, July.
  41. Du-Juan Wang & Yunqiang Yin & Shuenn-Ren Cheng & T.C.E. Cheng & Chin-Chia Wu, 2016. "Due date assignment and scheduling on a single machine with two competing agents," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1152-1169, February.
  42. Cheng, T. C. E. & Oguz, C. & Qi, X. D., 1996. "Due-date assignment and single machine scheduling with compressible processing times," International Journal of Production Economics, Elsevier, vol. 43(1), pages 29-35, May.
  43. S.S. Panwalkar & Christos Koulamas, 2015. "Scheduling research and the first decade of NRLQ: A historical perspective," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(4), pages 335-344, June.
  44. Shabtay, Dvir, 2016. "Optimal restricted due date assignment in scheduling," European Journal of Operational Research, Elsevier, vol. 252(1), pages 79-89.
  45. T C E Cheng & L Kang & C T Ng, 2004. "Due-date assignment and single machine scheduling with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(2), pages 198-203, February.
  46. Chung‐Lun Li & T. C. E. Cheng, 1994. "The parallel machine min‐max weighted absolute lateness scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 33-46, February.
  47. T C E Cheng & L Y Kang & C T Ng, 2007. "Due-date assignment and parallel-machine scheduling with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(8), pages 1103-1108, August.
  48. Hamilton Emmons, 1987. "Scheduling to a common due date on parallel uniform processors," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(6), pages 803-810, December.
  49. Zong-Jun Wei & Li-Yan Wang & Lei Zhang & Ji-Bo Wang & Ershen Wang, 2023. "Single-Machine Maintenance Activity Scheduling with Convex Resource Constraints and Learning Effects," Mathematics, MDPI, vol. 11(16), pages 1-21, August.
  50. Adamopoulos, George I. & Pappis, Costas P., 1998. "Scheduling under a common due-data on parallel unrelated machines," European Journal of Operational Research, Elsevier, vol. 105(3), pages 494-501, March.
  51. Dvir Shabtay & Nufar Gaspar & Liron Yedidsion, 2012. "A bicriteria approach to scheduling a single machine with job rejection and positional penalties," Journal of Combinatorial Optimization, Springer, vol. 23(4), pages 395-424, May.
  52. S.S. Panwalkar & Christos Koulamas, 2015. "On equivalence between the proportionate flow shop and single‐machine scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(7), pages 595-603, October.
  53. Enrique Gerstl & Gur Mosheiov, 2013. "Minmax due-date assignment with a time window for acceptable lead-times," Annals of Operations Research, Springer, vol. 211(1), pages 167-177, December.
  54. S.S. Panwalkar & Christos Koulamas, 2015. "Proportionate flow shop: New complexity results and models with due date assignment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(2), pages 98-106, March.
  55. Baruch Mor & Gur Mosheiov, 2021. "Minmax due-date assignment on a two-machine flowshop," Annals of Operations Research, Springer, vol. 305(1), pages 191-209, October.
  56. Liu, Zhixin & Lu, Liang & Qi, Xiangtong, 2020. "Price quotation for orders with different due dates," International Journal of Production Economics, Elsevier, vol. 220(C).
  57. G Mosheiov & J B Sidney, 2010. "Scheduling a deteriorating maintenance activity on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 882-887, May.
  58. Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
  59. Philip Kaminsky & Onur Kaya, 2008. "Scheduling and due‐date quotation in a make‐to‐order supply chain," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 444-458, August.
  60. Rustogi, Kabir & Strusevich, Vitaly A., 2012. "Simple matching vs linear assignment in scheduling models with positional effects: A critical review," European Journal of Operational Research, Elsevier, vol. 222(3), pages 393-407.
  61. Hui Zhu & Min Li & Zhangjin Zhou & Yun You, 2016. "Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3475-3490, June.
  62. Chang, Pei-Chann & Chen, Shih-Hsin & Mani, V., 2009. "A note on due-date assignment and single machine scheduling with a learning/aging effect," International Journal of Production Economics, Elsevier, vol. 117(1), pages 142-149, January.
  63. Chen, Zhi-Long, 1996. "Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs," European Journal of Operational Research, Elsevier, vol. 93(1), pages 49-60, August.
  64. Liman, Surya D. & Panwalkar, Shrikant S. & Thongmee, Sansern, 1996. "Determination of common due window location in a single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 93(1), pages 68-74, August.
  65. Leyvand, Yaron & Shabtay, Dvir & Steiner, George, 2010. "A unified approach for scheduling with convex resource consumption functions using positional penalties," European Journal of Operational Research, Elsevier, vol. 206(2), pages 301-312, October.
  66. Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
  67. T. C. E. Cheng & H. G. Kahlbacher, 1991. "A proof for the longest‐job‐first policy in one‐machine scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 715-720, October.
  68. Dvir Shabtay, 2023. "A new perspective on single-machine scheduling problems with late work related criteria," Annals of Operations Research, Springer, vol. 322(2), pages 947-966, March.
  69. Biskup, Dirk & Jahnke, Hermann, 2001. "Common due date assignment for scheduling on a single machine with jointly reducible processing times," International Journal of Production Economics, Elsevier, vol. 69(3), pages 317-322, February.
  70. J-G Kim & D-H Lee, 2009. "Algorithms for common due-date assignment and sequencing on a single machine with sequence-dependent setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1264-1272, September.
  71. An Pan & Tsan-Ming Choi, 2016. "An agent-based negotiation model on price and delivery date in a fashion supply chain," Annals of Operations Research, Springer, vol. 242(2), pages 529-557, July.
  72. Baruch Mor, 2019. "Minmax scheduling problems with common due-date and completion time penalty," Journal of Combinatorial Optimization, Springer, vol. 38(1), pages 50-71, July.
  73. Cheng, T. C. E. & Oguz, C. & Qi, X. D., 1996. "Due-date assignment and single machine scheduling with compressible processing times," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 107-113, June.
  74. X. Cai & S. Zhou, 1997. "Scheduling stochastic jobs with asymmetric earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 531-557, September.
  75. Qian, Jianbo & Steiner, George, 2013. "Fast algorithms for scheduling with learning effects and time-dependent processing times on a single machine," European Journal of Operational Research, Elsevier, vol. 225(3), pages 547-551.
  76. Dar-Li Yang & Wen-Hung Kuo, 2009. "Single-machine scheduling with both deterioration and learning effects," Annals of Operations Research, Springer, vol. 172(1), pages 315-327, November.
  77. Lin-Hui Sun & Kai Cui & Ju-hong Chen & Jun Wang, 2016. "Due date assignment and convex resource allocation scheduling with variable job processing times," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3551-3560, June.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.