IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v183y2007i2p674-693.html

A classification of assembly line balancing problems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Mohd Fadzil Faisae Ab Rashid & Nik Mohd Zuki Nik Mohamed & Ahmad Nasser Mohd Rose, 2022. "Multi-objective multi-verse optimiser for integrated two-sided assembly sequence planning and line balancing," Journal of Combinatorial Optimization, Springer, vol. 44(1), pages 850-876, August.
  2. Boysen, Nils & Bock, Stefan, 2011. "Scheduling just-in-time part supply for mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 211(1), pages 15-25, May.
  3. Borba, Leonardo & Ritt, Marcus & Miralles, Cristóbal, 2018. "Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 270(1), pages 146-156.
  4. Imre Dimény & Tamás Koltai, 2024. "Comparison of MILP and CP models for balancing partially automated assembly lines," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 32(4), pages 945-959, December.
  5. E. C. Sewell & S. H. Jacobson, 2012. "A Branch, Bound, and Remember Algorithm for the Simple Assembly Line Balancing Problem," INFORMS Journal on Computing, INFORMS, vol. 24(3), pages 433-442, August.
  6. Lehnfeld, Jana & Knust, Sigrid, 2014. "Loading, unloading and premarshalling of stacks in storage areas: Survey and classification," European Journal of Operational Research, Elsevier, vol. 239(2), pages 297-312.
  7. Manzini, Massimo & Unglert, Johannes & Gyulai, Dávid & Colledani, Marcello & Jauregui-Becker, Juan Manuel & Monostori, László & Urgo, Marcello, 2018. "An integrated framework for design, management and operation of reconfigurable assembly systems," Omega, Elsevier, vol. 78(C), pages 69-84.
  8. Arnd Huchzermeier & Tobias Mönch, 2023. "Mixed‐model assembly lines with variable takt and open stations," Production and Operations Management, Production and Operations Management Society, vol. 32(3), pages 704-722, March.
  9. Parames Chutima, 2022. "A comprehensive review of robotic assembly line balancing problem," Journal of Intelligent Manufacturing, Springer, vol. 33(1), pages 1-34, January.
  10. Marcus Ritt & Alysson M. Costa & Cristóbal Miralles, 2016. "The assembly line worker assignment and balancing problem with stochastic worker availability," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 907-922, February.
  11. Araújo, Felipe F.B. & Costa, Alysson M. & Miralles, Cristóbal, 2012. "Two extensions for the ALWABP: Parallel stations and collaborative approach," International Journal of Production Economics, Elsevier, vol. 140(1), pages 483-495.
  12. Koltai, Tamás & Dimény, Imre & Gallina, Viola & Gaal, Alexander & Sepe, Chiara, 2021. "An analysis of task assignment and cycle times when robots are added to human-operated assembly lines, using mathematical programming models," International Journal of Production Economics, Elsevier, vol. 242(C).
  13. Schulze, Philipp & Scholl, Armin & Walter, Rico, 2024. "R-SALSA: A branch, bound, and remember algorithm for the workload smoothing problem on simple assembly lines," European Journal of Operational Research, Elsevier, vol. 312(1), pages 38-55.
  14. Gartner, Daniel & Kolisch, Rainer, 2014. "Scheduling the hospital-wide flow of elective patients," European Journal of Operational Research, Elsevier, vol. 233(3), pages 689-699.
  15. Christian Weckenborg & Karsten Kieckhäfer & Christoph Müller & Martin Grunewald & Thomas S. Spengler, 2020. "Balancing of assembly lines with collaborative robots," Business Research, Springer;German Academic Association for Business Research, vol. 13(1), pages 93-132, April.
  16. Boysen, Nils & Stephan, Konrad, 2016. "A survey on single crane scheduling in automated storage/retrieval systems," European Journal of Operational Research, Elsevier, vol. 254(3), pages 691-704.
  17. Klindworth, Hanne & Otto, Christian & Scholl, Armin, 2012. "On a learning precedence graph concept for the automotive industry," European Journal of Operational Research, Elsevier, vol. 217(2), pages 259-269.
  18. Sternatz, Johannes, 2015. "The joint line balancing and material supply problem," International Journal of Production Economics, Elsevier, vol. 159(C), pages 304-318.
  19. Jonathan Oesterle & Lionel Amodeo & Farouk Yalaoui, 2019. "A comparative study of Multi-Objective Algorithms for the Assembly Line Balancing and Equipment Selection Problem under consideration of Product Design Alternatives," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1021-1046, March.
  20. Fattahi, Ali & Turkay, Metin, 2015. "On the MILP model for the U-shaped assembly line balancing problems," European Journal of Operational Research, Elsevier, vol. 242(1), pages 343-346.
  21. Minghai Yuan & Hongyan Yu & Jinting Huang & Aimin Ji, 2019. "Reconfigurable assembly line balancing for cloud manufacturing," Journal of Intelligent Manufacturing, Springer, vol. 30(6), pages 2391-2405, August.
  22. Özcan, Ugur, 2010. "Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm," European Journal of Operational Research, Elsevier, vol. 205(1), pages 81-97, August.
  23. Walter, Rico & Schulze, Philipp & Scholl, Armin, 2021. "SALSA: Combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 295(3), pages 857-873.
  24. Otto, Alena & Scholl, Armin, 2011. "Incorporating ergonomic risks into assembly line balancing," European Journal of Operational Research, Elsevier, vol. 212(2), pages 277-286, July.
  25. Johannes Vass & Marie-Louise Lackner & Christoph Mrkvicka & Nysret Musliu & Felix Winter, 2022. "Exact and meta-heuristic approaches for the production leveling problem," Journal of Scheduling, Springer, vol. 25(3), pages 339-370, June.
  26. Otto, Alena & Li, Xiyu, 2020. "Product sequencing in multiple-piece-flow assembly lines," Omega, Elsevier, vol. 91(C).
  27. Moreira, Mayron César O. & Costa, Alysson M., 2013. "Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers," International Journal of Production Economics, Elsevier, vol. 141(2), pages 552-560.
  28. Boysen, Nils & Schulze, Philipp & Scholl, Armin, 2022. "Assembly line balancing: What happened in the last fifteen years?," European Journal of Operational Research, Elsevier, vol. 301(3), pages 797-814.
  29. Manuel Chica & Joaquín Bautista & Jesica de Armas, 2019. "Benefits of robust multiobjective optimization for flexible automotive assembly line balancing," Flexible Services and Manufacturing Journal, Springer, vol. 31(1), pages 75-103, March.
  30. Kucukkoc, Ibrahim & Li, Zixiang & Karaoglan, Aslan D. & Zhang, David Z., 2018. "Balancing of mixed-model two-sided assembly lines with underground workstations: A mathematical model and ant colony optimization algorithm," International Journal of Production Economics, Elsevier, vol. 205(C), pages 228-243.
  31. Bautista, Joaquín & Pereira, Jordi, 2009. "A dynamic programming based heuristic for the assembly line balancing problem," European Journal of Operational Research, Elsevier, vol. 194(3), pages 787-794, May.
  32. Sikora, Celso Gustavo Stall & Lopes, Thiago Cantos & Magatão, Leandro, 2017. "Traveling worker assembly line (re)balancing problem: Model, reduction techniques, and real case studies," European Journal of Operational Research, Elsevier, vol. 259(3), pages 949-971.
  33. Theodor Freiheit & Wei Li, 2017. "The effect of work content imbalance and its interaction with scheduling method on sequential flow line performance," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2791-2805, May.
  34. Scholl, Armin & Fliedner, Malte & Boysen, Nils, 2010. "Absalom: Balancing assembly lines with assignment restrictions," European Journal of Operational Research, Elsevier, vol. 200(3), pages 688-701, February.
  35. Gicquel, C. & Miégeville, N. & Minoux, M. & Dallery, Y., 2010. "Optimizing glass coating lines: MIP model and valid inequalities," European Journal of Operational Research, Elsevier, vol. 202(3), pages 747-755, May.
  36. García-Villoria, Alberto & Corominas, Albert & Nadal, Adrià & Pastor, Rafael, 2018. "Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints," European Journal of Operational Research, Elsevier, vol. 271(3), pages 882-895.
  37. Abolfazl Jafari Asl & Maghsud Solimanpur & Ravi Shankar, 2019. "Multi-objective multi-model assembly line balancing problem: a quantitative study in engine manufacturing industry," OPSEARCH, Springer;Operational Research Society of India, vol. 56(3), pages 603-627, September.
  38. Hamta, Nima & Fatemi Ghomi, S.M.T. & Jolai, F. & Akbarpour Shirazi, M., 2013. "A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect," International Journal of Production Economics, Elsevier, vol. 141(1), pages 99-111.
  39. Sternatz, Johannes, 2014. "Enhanced multi-Hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industry," European Journal of Operational Research, Elsevier, vol. 235(3), pages 740-754.
  40. Masood Fathi & María Jesús à lvarez & Victoria Rodríguez, 2016. "A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 10(2), pages 145-169.
  41. Olcay Polat & Can B. Kalayci & Özcan Mutlu & Surendra M. Gupta, 2016. "A two-phase variable neighbourhood search algorithm for assembly line worker assignment and balancing problem type-II: an industrial case study," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 722-741, February.
  42. Janis Brammer & Bernhard Lutz & Dirk Neumann, 2022. "Stochastic mixed model sequencing with multiple stations using reinforcement learning and probability quantiles," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(1), pages 29-56, March.
  43. Ibrahim Kucukkoc & Kadir Buyukozkan & Sule Itir Satoglu & David Z. Zhang, 2019. "A mathematical model and artificial bee colony algorithm for the lexicographic bottleneck mixed-model assembly line balancing problem," Journal of Intelligent Manufacturing, Springer, vol. 30(8), pages 2913-2925, December.
  44. Bautista, Joaquín & Pereira, Jordi, 2011. "Procedures for the Time and Space constrained Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 212(3), pages 473-481, August.
  45. Caraballo, L.E. & Díaz-Báñez, J.M. & Maza, I. & Ollero, A., 2017. "The block-information-sharing strategy for task allocation: A case study for structure assembly with aerial robots," European Journal of Operational Research, Elsevier, vol. 260(2), pages 725-738.
  46. Chica, Manuel & Cordón, Óscar & Damas, Sergio & Bautista, Joaquín, 2013. "A robustness information and visualization model for time and space assembly line balancing under uncertain demand," International Journal of Production Economics, Elsevier, vol. 145(2), pages 761-772.
  47. Ashish Yadav & Pawan Verma & Sunil Agrawal, 2020. "Mixed model two sided assembly line balancing problem: an exact solution approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(2), pages 335-348, July.
  48. Ece Sancı & Meral Azizoğlu, 2017. "Rebalancing the assembly lines: exact solution approaches," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 5991-6010, October.
  49. Li, Mingxing & Huang, George Q., 2021. "Production-intralogistics synchronization of industry 4.0 flexible assembly lines under graduation intelligent manufacturing system," International Journal of Production Economics, Elsevier, vol. 241(C).
  50. Tiacci, Lorenzo, 2015. "Coupling a genetic algorithm approach and a discrete event simulator to design mixed-model un-paced assembly lines with parallel workstations and stochastic task times," International Journal of Production Economics, Elsevier, vol. 159(C), pages 319-333.
  51. Tiacci, Lorenzo & Mimmi, Mario, 2018. "Integrating ergonomic risks evaluation through OCRA index and balancing/sequencing decisions for mixed model stochastic asynchronous assembly lines," Omega, Elsevier, vol. 78(C), pages 112-138.
  52. Yılmaz Delice & Emel Kızılkaya Aydoğan & Uğur Özcan & Mehmet Sıtkı İlkay, 2017. "A modified particle swarm optimization algorithm to mixed-model two-sided assembly line balancing," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 23-36, January.
  53. Costa, Alysson M. & Miralles, Cristóbal, 2009. "Job rotation in assembly lines employing disabled workers," International Journal of Production Economics, Elsevier, vol. 120(2), pages 625-632, August.
  54. Fang, Yilin & Liu, Quan & Li, Miqing & Laili, Yuanjun & Pham, Duc Truong, 2019. "Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations," European Journal of Operational Research, Elsevier, vol. 276(1), pages 160-174.
  55. Lopes, Thiago Cantos & Michels, Adalberto Sato & Sikora, Celso Gustavo Stall & Molina, Rafael Gobbi & Magatão, Leandro, 2018. "Balancing and cyclically sequencing synchronous, asynchronous, and hybrid unpaced assembly lines," International Journal of Production Economics, Elsevier, vol. 203(C), pages 216-224.
  56. M. H. Alavidoost & M. H. Fazel Zarandi & Mosahar Tarimoradi & Yaser Nemati, 2017. "Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 313-336, February.
  57. Andreas Hottenrott & Martin Grunow, 2019. "Flexible layouts for the mixed-model assembly of heterogeneous vehicles," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 943-979, December.
  58. Zhao, Zhengwu & Zhang, Chunyan, 2023. "The mechanisms of labor division from the perspective of task urgency and game theory," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 630(C).
  59. Fekete, Patrick & Lim, Sirirat & Martin, Steve & Kuhn, Katja & Wright, Nick, 2016. "Improved energy supply for non-road electric vehicles by occasional charging station location modelling," Energy, Elsevier, vol. 114(C), pages 1033-1040.
  60. Bayraktar, O. Baturhan & Grunow, Martin & Kolisch, Rainer, 2025. "Dynamic reconfigurations of matrix assembly layouts," European Journal of Operational Research, Elsevier, vol. 326(1), pages 96-110.
  61. Florian Jaehn & Helmut A. Sedding, 2016. "Scheduling with time-dependent discrepancy times," Journal of Scheduling, Springer, vol. 19(6), pages 737-757, December.
  62. Yılmaz Delice & Emel Kızılkaya Aydoğan & Uğur Özcan & Mehmet Sıtkı İlkay, 2017. "Balancing two-sided U-type assembly lines using modified particle swarm optimization algorithm," 4OR, Springer, vol. 15(1), pages 37-66, March.
  63. Otto, Alena & Otto, Christian & Scholl, Armin, 2013. "Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 228(1), pages 33-45.
  64. Jietao Dong & Linxuan Zhang & Tianyuan Xiao, 2018. "A hybrid PSO/SA algorithm for bi-criteria stochastic line balancing with flexible task times and zoning constraints," Journal of Intelligent Manufacturing, Springer, vol. 29(4), pages 737-751, April.
  65. Boysen, Nils & Briskorn, Dirk & Meisel, Frank, 2017. "A generalized classification scheme for crane scheduling with interference," European Journal of Operational Research, Elsevier, vol. 258(1), pages 343-357.
  66. Boysen, Nils & Briskorn, Dirk & Schwerdfeger, Stefan, 2019. "Matching supply and demand in a sharing economy: Classification, computational complexity, and application," European Journal of Operational Research, Elsevier, vol. 278(2), pages 578-595.
  67. Chica, Manuel & Bautista, Joaquín & Cordón, Óscar & Damas, Sergio, 2016. "A multiobjective model and evolutionary algorithms for robust time and space assembly line balancing under uncertain demand," Omega, Elsevier, vol. 58(C), pages 55-68.
  68. John F. Wellington & Stephen A. Lewis, 2018. "Interactive Excel-Based Procedure for Line Balancing," INFORMS Transactions on Education, INFORMS, vol. 19(1), pages 23-35, September.
  69. Armin Scholl & Nils Boysen & Malte Fliedner, 2009. "Optimally solving the alternative subgraphs assembly line balancing problem," Annals of Operations Research, Springer, vol. 172(1), pages 243-258, November.
  70. Schepler, Xavier & Rossi, André & Gurevsky, Evgeny & Dolgui, Alexandre, 2022. "Solving robust bin-packing problems with a branch-and-price approach," European Journal of Operational Research, Elsevier, vol. 297(3), pages 831-843.
  71. Dominik Kress & Sebastian Meiswinkel & Erwin Pesch, 2018. "Mechanism design for machine scheduling problems: classification and literature overview," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(3), pages 583-611, July.
  72. Becker, Christian & Scholl, Armin, 2009. "Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure," European Journal of Operational Research, Elsevier, vol. 199(2), pages 359-374, December.
  73. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
  74. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
  75. Fleszar, Krzysztof, 2017. "A new MILP model for the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)," European Journal of Operational Research, Elsevier, vol. 259(1), pages 169-174.
  76. Schmid, Nico André & Montreuil, Benoit & Limère, Veronique, 2024. "Modeling and solving integrated assembly line balancing, assembly line feeding, and facility sizing problems," International Journal of Production Economics, Elsevier, vol. 277(C).
  77. Zülch, Michael & Zülch, Gert, 2017. "Production logistics and ergonomic evaluation of U-shaped assembly systems," International Journal of Production Economics, Elsevier, vol. 190(C), pages 37-44.
  78. Tiacci, Lorenzo, 2015. "Simultaneous balancing and buffer allocation decisions for the design of mixed-model assembly lines with parallel workstations and stochastic task times," International Journal of Production Economics, Elsevier, vol. 162(C), pages 201-215.
  79. Boysen, Nils & Schwerdfeger, Stefan & Stephan, Konrad, 2023. "A review of synchronization problems in parts-to-picker warehouses," European Journal of Operational Research, Elsevier, vol. 307(3), pages 1374-1390.
  80. Sikora, Celso Gustavo Stall, 2024. "Balancing mixed-model assembly lines for random sequences," European Journal of Operational Research, Elsevier, vol. 314(2), pages 597-611.
  81. Daniel Leitold & Agnes Vathy-Fogarassy & Janos Abonyi, 2019. "Empirical working time distribution-based line balancing with integrated simulated annealing and dynamic programming," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 27(2), pages 455-473, June.
  82. Lopes, Thiago Cantos & Sikora, C.G.S. & Molina, Rafael Gobbi & Schibelbain, Daniel & Rodrigues, L.C.A. & Magatão, Leandro, 2017. "Balancing a robotic spot welding manufacturing line: An industrial case study," European Journal of Operational Research, Elsevier, vol. 263(3), pages 1033-1048.
  83. Scholl, Armin & Boysen, Nils, 2009. "Designing parallel assembly lines with split workplaces: Model and optimization procedure," International Journal of Production Economics, Elsevier, vol. 119(1), pages 90-100, May.
  84. Lale Özbakır & Gökhan Seçme, 2022. "A hyper-heuristic approach for stochastic parallel assembly line balancing problems with equipment costs," Operational Research, Springer, vol. 22(1), pages 577-614, March.
  85. Wen-Chyuan Chiang & Timothy L. Urban & Chunyong Luo, 2016. "Balancing stochastic two-sided assembly lines," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6232-6250, October.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.