IDEAS home Printed from https://ideas.repec.org/p/ems/eureir/21942.html
   My bibliography  Save this paper

On the use of installed base information for spare parts logistics: a revieuw of ideas and industry practice

Author

Listed:
  • Dekker, R.
  • Pinçe, C.
  • Zuidwijk, R.A.
  • Jalil, M.N.

Abstract

Demand for spare parts is often difficult to forecast using historical data only. In this paper, we give an overview of installed based information and provide several ways in which installed base forecasting can be used. We discuss cases of installed based forecasting at four companies and list the issues involved. Moreover, we provide some models to assess the value of installed base information and conclude that forecasts of spare parts demand and return can be made considerably more timely and accurate by using installed base information.

Suggested Citation

  • Dekker, R. & Pinçe, C. & Zuidwijk, R.A. & Jalil, M.N., 2010. "On the use of installed base information for spare parts logistics: a revieuw of ideas and industry practice," Econometric Institute Research Papers EI 2010-73, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  • Handle: RePEc:ems:eureir:21942
    as

    Download full text from publisher

    File URL: https://repub.eur.nl/pub/21942/EI2010-73.pdf
    Download Restriction: no
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. van Jaarsveld, W.L., 2010. "Estimating obsolescence risk from demand data - a case study," Econometric Institute Research Papers EI 2010-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Karl Inderfurth & Kampan Mukherjee, 2008. "Decision support for spare parts acquisition in post product life cycle," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 16(1), pages 17-42, March.
    3. John R. Moore, Jr., 1971. "Forecasting and Scheduling for Past-Model Replacement Parts," Management Science, INFORMS, vol. 18(4-Part-I), pages 200-213, December.
    4. Aronis, Kostas-Platon & Magou, Ioulia & Dekker, Rommert & Tagaras, George, 2004. "Inventory control of spare parts using a Bayesian approach: A case study," European Journal of Operational Research, Elsevier, vol. 154(3), pages 730-739, May.
    5. Krikke, H.R. & van der Laan, E., 2009. "Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems," Other publications TiSEM c1a3c438-6d31-4147-afd7-8, Tilburg University, School of Economics and Management.
    6. Frank M. Bass, 1969. "A New Product Growth for Model Consumer Durables," Management Science, INFORMS, vol. 15(5), pages 215-227, January.
    7. Porras, Eric & Dekker, Rommert, 2008. "An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods," European Journal of Operational Research, Elsevier, vol. 184(1), pages 101-132, January.
    8. Moritz Fleischmann & Jo A. E. E. van Nunen & Ben Gräve, 2003. "Integrating Closed-Loop Supply Chains and Spare-Parts Management at IBM," Interfaces, INFORMS, vol. 33(6), pages 44-56, December.
    9. Pinçe, Çerag & Dekker, Rommert, 2011. "An inventory model for slow moving items subject to obsolescence," European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
    10. Wang, Hongzhou, 2002. "A survey of maintenance policies of deteriorating systems," European Journal of Operational Research, Elsevier, vol. 139(3), pages 469-489, June.
    11. Blischke, W. R. & Murthy, D. N. P., 1992. "Product warranty management -- I: A taxonomy for warranty policies," European Journal of Operational Research, Elsevier, vol. 62(2), pages 127-148, October.
    12. A H C Eaves & B G Kingsman, 2004. "Forecasting for the ordering and stock-holding of spare parts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(4), pages 431-437, April.
    13. Morris Cohen & Pasumarti V. Kamesam & Paul Kleindorfer & Hau Lee & Armen Tekerian, 1990. "Optimizer: IBM's Multi-Echelon Inventory System for Managing Service Logistics," Interfaces, INFORMS, vol. 20(1), pages 65-82, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    2. van Wingerden, E. & Basten, R.J.I. & Dekker, R. & Rustenburg, W.D., 2014. "More grip on inventory control through improved forecasting: A comparative study at three companies," International Journal of Production Economics, Elsevier, vol. 157(C), pages 220-237.
    3. Van der Auweraer, Sarah & Zhu, Sha & Boute, Robert N., 2021. "The value of installed base information for spare part inventory control," International Journal of Production Economics, Elsevier, vol. 239(C).
    4. Fabian Taigel & Anselme K. Tueno & Richard Pibernik, 2018. "Privacy-preserving condition-based forecasting using machine learning," Journal of Business Economics, Springer, vol. 88(5), pages 563-592, July.
    5. Kati Stormi & Anni Lindholm & Teemu Laine & Tuomas Korhonen, 2020. "RFM customer analysis for product-oriented services and service business development: an interventionist case study of two machinery manufacturers," Journal of Management & Governance, Springer;Accademia Italiana di Economia Aziendale (AIDEA), vol. 24(3), pages 623-653, September.
    6. Boram Choi & Jong Hwan Suh, 2020. "Forecasting Spare Parts Demand of Military Aircraft: Comparisons of Data Mining Techniques and Managerial Features from the Case of South Korea," Sustainability, MDPI, vol. 12(15), pages 1-20, July.
    7. Yongquan, Sun & Xi, Chen & He, Ren & Yingchao, Jin & Quanwu, Liu, 2016. "Ordering decision-making methods on spare parts for a new aircraft fleet based on a two-sample prediction," Reliability Engineering and System Safety, Elsevier, vol. 156(C), pages 40-50.
    8. Dombi, József & Jónás, Tamás & Tóth, Zsuzsanna Eszter, 2018. "Modeling and long-term forecasting demand in spare parts logistics businesses," International Journal of Production Economics, Elsevier, vol. 201(C), pages 1-17.
    9. Babai, M.Z. & Chen, H. & Syntetos, A.A. & Lengu, D., 2021. "A compound-Poisson Bayesian approach for spare parts inventory forecasting," International Journal of Production Economics, Elsevier, vol. 232(C).
    10. Amniattalab, Ayda & Frenk, J.B.G. & Hekimoğlu, Mustafa, 2023. "On spare parts demand and the installed base concept: A theoretical approach," International Journal of Production Economics, Elsevier, vol. 266(C).
    11. Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
    12. Euna Lee & Myungwoo Nam & Hongchul Lee, 2022. "Tab2vox: CNN-Based Multivariate Multilevel Demand Forecasting Framework by Tabular-To-Voxel Image Conversion," Sustainability, MDPI, vol. 14(18), pages 1-20, September.
    13. Kim, T.Y. & Dekker, R. & Heij, C., 2016. "Spare part demand forecasting for consumer goods using installed base information," Econometric Institute Research Papers EI2016-11, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    14. Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
    15. Zhu, Sha & Dekker, Rommert & van Jaarsveld, Willem & Renjie, Rex Wang & Koning, Alex J., 2017. "An improved method for forecasting spare parts demand using extreme value theory," European Journal of Operational Research, Elsevier, vol. 261(1), pages 169-181.
    16. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    17. José M. González-Varona & David Poza & Fernando Acebes & Félix Villafáñez & Javier Pajares & Adolfo López-Paredes, 2020. "New Business Models for Sustainable Spare Parts Logistics: A Case Study," Sustainability, MDPI, vol. 12(8), pages 1-16, April.
    18. Van der Auweraer, Sarah & Boute, Robert, 2019. "Forecasting spare part demand using service maintenance information," International Journal of Production Economics, Elsevier, vol. 213(C), pages 138-149.
    19. Hekimoğlu, Mustafa & Karlı, Deniz, 2023. "Modeling repair demand in existence of a nonstationary installed base," International Journal of Production Economics, Elsevier, vol. 263(C).
    20. Boutselis, Petros & McNaught, Ken, 2019. "Using Bayesian Networks to forecast spares demand from equipment failures in a changing service logistics context," International Journal of Production Economics, Elsevier, vol. 209(C), pages 325-333.
    21. Stip, J. & Van Houtum, G.J., 2020. "On a method to improve your service BOMs within spare parts management," International Journal of Production Economics, Elsevier, vol. 221(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    2. Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
    3. Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
    4. Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
    5. Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022. "Forecasting: theory and practice," International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
      • Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
    6. Teunter, Ruud H. & Syntetos, Aris A. & Zied Babai, M., 2011. "Intermittent demand: Linking forecasting to inventory obsolescence," European Journal of Operational Research, Elsevier, vol. 214(3), pages 606-615, November.
    7. van der Heijden, Matthieu & Iskandar, Bermawi P., 2013. "Last time buy decisions for products sold under warranty," European Journal of Operational Research, Elsevier, vol. 224(2), pages 302-312.
    8. Syntetos, A.A. & Babai, M.Z. & Davies, J. & Stephenson, D., 2010. "Forecasting and stock control: A study in a wholesaling context," International Journal of Production Economics, Elsevier, vol. 127(1), pages 103-111, September.
    9. Darghouth, M.N. & Ait-kadi, D. & Chelbi, A., 2017. "Joint optimization of design, warranty and price for products sold with maintenance service contracts," Reliability Engineering and System Safety, Elsevier, vol. 165(C), pages 197-208.
    10. Pourakbar, Morteza & Dekker, Rommert, 2012. "Customer differentiated end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
    11. M. Pourakbar & E. Laan & R. Dekker, 2014. "End-of-Life Inventory Problem with Phaseout Returns," Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1561-1576, September.
    12. R Fildes & K Nikolopoulos & S F Crone & A A Syntetos, 2008. "Forecasting and operational research: a review," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(9), pages 1150-1172, September.
    13. Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020. "Spare parts inventory control based on maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    14. Zhu, Sha & Dekker, Rommert & van Jaarsveld, Willem & Renjie, Rex Wang & Koning, Alex J., 2017. "An improved method for forecasting spare parts demand using extreme value theory," European Journal of Operational Research, Elsevier, vol. 261(1), pages 169-181.
    15. Rego, José Roberto do & Mesquita, Marco Aurélio de, 2015. "Demand forecasting and inventory control: A simulation study on automotive spare parts," International Journal of Production Economics, Elsevier, vol. 161(C), pages 1-16.
    16. Gary Mitchell & Meike Niederhausen, 2010. "On Replenishing Items with Seasonal Intermittent Demand," American Journal of Economics and Business Administration, Science Publications, vol. 2(1), pages 90-102, March.
    17. A A Syntetos & J E Boylan & S M Disney, 2009. "Forecasting for inventory planning: a 50-year review," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 149-160, May.
    18. Ozyoruk, Emin & Erkip, Nesim Kohen & Ararat, Çağın, 2022. "End-of-life inventory management problem: Results and insights," International Journal of Production Economics, Elsevier, vol. 243(C).
    19. Liu, Peng & Wang, Guanjun, 2022. "Minimal repair models with non-negligible repair time," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
    20. Bacchetti, A. & Plebani, F. & Saccani, N. & Syntetos, A.A., 2013. "Empirically-driven hierarchical classification of stock keeping units," International Journal of Production Economics, Elsevier, vol. 143(2), pages 263-274.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ems:eureir:21942. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: RePub (email available below). General contact details of provider: https://edirc.repec.org/data/feeurnl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.