IDEAS home Printed from https://ideas.repec.org/p/ems/eureir/14454.html

Risk-based stock decisions for projects

Author

Listed:
  • van Jaarsveld, W.L.
  • Dekker, R.

Abstract

In this report we discuss a model that can be used to determine stocking levels using the data that comes forward from a Shell RCM analysis and the data available in E-SPIR. The model is appropriate to determine stock quantities for parts that are used in redundancy situations, and for parts that are used in different pieces of equipment with different downtime costs. Estimating the annual production loss using the model consists of a number of steps. First, we need to determine which spares are used for the repairs of which failure modes. In the second step, we estimate the average waiting time for spares as a function of the number of spares stocked. In the third step, the annual downtime costs are determined. We combine the downtime costs with the holding costs to determine the optimal number of parts to stock.

Suggested Citation

  • van Jaarsveld, W.L. & Dekker, R., 2009. "Risk-based stock decisions for projects," Econometric Institute Research Papers EI 2009-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  • Handle: RePEc:ems:eureir:14454
    as

    Download full text from publisher

    File URL: https://repub.eur.nl/pub/14454/EI2009-02.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    2. Trimp, M.E. & Sinnema, S.M. & Dekker, R. & Teunter, R.H., 2004. "Optimise initial spare parts inventories: an analysis and improvement of an electronic decision tool," Econometric Institute Research Papers EI 2004-52, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. van Jaarsveld, W.L. & Dekker, R., 2010. "Integrating Reliability Centered Maintenance and Spare Parts Stock Control," Econometric Institute Research Papers EI 2010-16, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Spare parts stock control for redundant systems using reliability centered maintenance data," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1576-1586.
    3. Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
    4. Kouki, Chaaben & Drent, Melvin & Babai, M. Zied & Drent, Collin, 2026. "Dedicated maintenance and repair shop control for spare parts networks," European Journal of Operational Research, Elsevier, vol. 331(3), pages 809-822.
    5. Hill, R.M. & Seifbarghy, M. & Smith, D.K., 2007. "A two-echelon inventory model with lost sales," European Journal of Operational Research, Elsevier, vol. 181(2), pages 753-766, September.
    6. Jérémie Gallien & Stephen C. Graves & Alan Scheller-Wolf, 2016. "OM Forum—Practice-Based Research in Operations Management: What It Is, Why Do It, Related Challenges, and How to Overcome Them," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 5-14, February.
    7. V. Radhamani & B. Sivakumar & G. Arivarignan, 2022. "A Comparative Study on Replenishment Policies for Perishable Inventory System with Service Facility and Multiple Server Vacation," OPSEARCH, Springer;Operational Research Society of India, vol. 59(1), pages 229-265, March.
    8. R. Basten & M. Heijden & J. Schutten & E. Kutanoglu, 2015. "An approximate approach for the joint problem of level of repair analysis and spare parts stocking," Annals of Operations Research, Springer, vol. 224(1), pages 121-145, January.
    9. Arts, Joachim, 2017. "A multi-item approach to repairable stocking and expediting in a fluctuating demand environment," European Journal of Operational Research, Elsevier, vol. 256(1), pages 102-115.
    10. Ashayeri, J. & Heuts, R.M.J. & Jansen, A. & Szczerba, B., 1994. "Inventory management of repairable service parts for personal computers : A case study," Other publications TiSEM 28578c62-2e4d-4345-929f-a, Tilburg University, School of Economics and Management.
    11. K Sahyouni & R C Savaskan & M S Daskin, 2010. "The effect of lifetime buys on warranty repair operations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 790-803, May.
    12. Chemweno, Peter & Morag, Ido & Pintelon, Liliane, 2026. "Simulating the impact of varying maintenance interventions on asset performance and spare part provisioning in a multi-echelon replenishment system," Reliability Engineering and System Safety, Elsevier, vol. 271(C).
    13. Fangruo Chen, 1999. "94%-Effective Policies for a Two-Stage Serial Inventory System with Stochastic Demand," Management Science, INFORMS, vol. 45(12), pages 1679-1696, December.
    14. Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
    15. Sun, Bo & Sun, Xu & Tsang, Danny H.K. & Whitt, Ward, 2019. "Optimal battery purchasing and charging strategy at electric vehicle battery swap stations," European Journal of Operational Research, Elsevier, vol. 279(2), pages 524-539.
    16. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
    17. Sun, Hao & Yang, Jun & Yang, Chao, 2019. "A robust optimization approach to multi-interval location-inventory and recharging planning for electric vehicles," Omega, Elsevier, vol. 86(C), pages 59-75.
    18. Wong, Hartanto & Cattrysse, Dirk & Van Oudheusden, Dirk, 2005. "Inventory pooling of repairable spare parts with non-zero lateral transshipment time and delayed lateral transshipments," European Journal of Operational Research, Elsevier, vol. 165(1), pages 207-218, August.
    19. Mauricio Varas & Franco Basso & Armin Lüer-Villagra & Alejandro Mac Cawley & Sergio Maturana, 2019. "Managing premium wines using an $$(s - 1,s)$$ ( s - 1 , s ) inventory policy: a heuristic solution approach," Annals of Operations Research, Springer, vol. 280(1), pages 351-376, September.
    20. Wei Qi & Yuli Zhang & Ningwei Zhang, 2023. "Scaling Up Electric-Vehicle Battery Swapping Services in Cities: A Joint Location and Repairable-Inventory Model," Management Science, INFORMS, vol. 69(11), pages 6855-6875, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ems:eureir:14454. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: RePub The email address of this maintainer does not seem to be valid anymore. Please ask RePub to update the entry or send us the correct address (email available below). General contact details of provider: https://edirc.repec.org/data/feeurnl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.