Regulation of transmission expansion in Argentina Part II: Developments since the Fourth Line

Author

Listed:
  • Littlechild, S.C.
  • Skerk, C.J.

Abstract

Argentina’s 1992 transmission expansion policy was subsequently modified by, for example, including provision for transmission companies and proposing quality and substation expansions. There have been several such expansions, and no lack of investment in quality and reliability of supply. In 1999, reflecting a decision to give greater weight to political considerations, a Federal Transmission Plan was introduced to build lines designated by the federal and provincial governments. The original reform led to less investment in major transmission lines but more intensive use of existing lines. Competition to construct expansions developed, leading to lower construction costs. Thus the Argentine transmission expansion mechanism was a considerable success in terms of meeting the requirements of users efficiently. This experience suggests that involving users in the regulation of monopoly networks is feasible, and the scope for it may be greater than generally appreciated. However, the reconciliation of economic and political considerations needs further consideration.

Suggested Citation

  • Littlechild, S.C. & Skerk, C.J., 2004. "Regulation of transmission expansion in Argentina Part II: Developments since the Fourth Line," Cambridge Working Papers in Economics 0465, Faculty of Economics, University of Cambridge.
  • Handle: RePEc:cam:camdae:0465
    Note: CMI,IO
    as

    Download full text from publisher

    File URL: http://www.econ.cam.ac.uk/electricity/publications/wp/ep62.pdf
    Download Restriction: no
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. Chisari, Omar O. & Dal-Bo, Pedro & Romero, Carlos A., 2001. "High-tension electricity network expansions in Argentina: decision mechanisms and willingness-to-pay revelation," Energy Economics, Elsevier, vol. 23(6), pages 697-715, November.
    2. Paul Joskow & Jean Tirole, 2005. "Merchant Transmission Investment," Journal of Industrial Economics, Wiley Blackwell, vol. 53(2), pages 233-264, June.
    3. Pollitt, Michael, 2008. "Electricity reform in Argentina: Lessons for developing countries," Energy Economics, Elsevier, vol. 30(4), pages 1536-1567, July.
    4. Littlechild, S.C. & Skerk, C.J., 2004. "Regulation of transmission expansion in Argentina Part I: State ownership, reform and the Fourth Line," Cambridge Working Papers in Economics 0464, Faculty of Economics, University of Cambridge.
    5. Hogan, William W, 1992. "Contract Networks for Electric Power Transmission," Journal of Regulatory Economics, Springer, vol. 4(3), pages 211-242, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 1: The origins of policy," Energy Economics, Elsevier, vol. 30(4), pages 1367-1384, July.
    2. Christine Brandstätt & Gert Brunekreeft & Nele Friedrichsen, 2013. "The Need for More Flexibility in the Regulation of Smart Grids – Stakeholder Involvement," Bremen Energy Working Papers 0013, Bremen Energy Research.
    3. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 4: A review of performance," Energy Economics, Elsevier, vol. 30(4), pages 1462-1490, July.
    4. Pollitt, Michael, 2008. "Electricity reform in Argentina: Lessons for developing countries," Energy Economics, Elsevier, vol. 30(4), pages 1536-1567, July.
    5. Littlechild, S.C. & Skerk, C.J., 2004. "Regulation of transmission expansion in Argentina Part I: State ownership, reform and the Fourth Line," Cambridge Working Papers in Economics 0464, Faculty of Economics, University of Cambridge.
    6. Rosellon, Juan, 2007. "An incentive mechanism for electricity transmission expansion in Mexico," Energy Policy, Elsevier, vol. 35(5), pages 3003-3014, May.
    7. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 3: The evolution of policy," Energy Economics, Elsevier, vol. 30(4), pages 1420-1461, July.
    8. Littlechild, Stephen C. & Ponzano, Eduardo A., 2008. "Transmission expansion in Argentina 5: The regional electricity forum of Buenos Aires province," Energy Economics, Elsevier, vol. 30(4), pages 1491-1526, July.
    9. Greve,T. & Pollitt, M. G., 2012. "Designing electiricty transmission auctions: an introduction to the relevant literature," Cambridge Working Papers in Economics 1245, Faculty of Economics, University of Cambridge.
    10. Chisari, Omar O. & Romero, Carlos A., 2008. "Investment decisions in electricity transmission in Argentina: The role of earmarked funds and gas pipeline expansions," Energy Economics, Elsevier, vol. 30(4), pages 1321-1333, July.
    11. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 2: The Fourth Line revisited," Energy Economics, Elsevier, vol. 30(4), pages 1385-1419, July.
    12. Abdala, Manuel A., 2008. "Governance of competitive transmission investment in weak institutional systems," Energy Economics, Elsevier, vol. 30(4), pages 1306-1320, July.
    13. Doucet, Joseph & Littlechild, Stephen, 2006. "Negotiated settlements: The development of legal and economic thinking," Utilities Policy, Elsevier, vol. 14(4), pages 266-277, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 2: The Fourth Line revisited," Energy Economics, Elsevier, vol. 30(4), pages 1385-1419, July.
    2. Stephen C. Littlechild & Carlos J. Skerk, 2004. "Regulation of transmission expansion in Argentina Part I: State ownership, reform and the Fourth Line," Working Papers EP61, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    3. Abdala, Manuel A., 2008. "Governance of competitive transmission investment in weak institutional systems," Energy Economics, Elsevier, vol. 30(4), pages 1306-1320, July.
    4. Thomas-Olivier Léautier & Véronique Thelen, 2009. "Optimal expansion of the power transmission grid: why not?," Journal of Regulatory Economics, Springer, vol. 36(2), pages 127-153, October.
    5. Paul Joskow & Jean Tirole, 2005. "Merchant Transmission Investment," Journal of Industrial Economics, Wiley Blackwell, vol. 53(2), pages 233-264, June.
    6. William Hogan & Juan Rosellón & Ingo Vogelsang, 2010. "Toward a combined merchant-regulatory mechanism for electricity transmission expansion," Journal of Regulatory Economics, Springer, vol. 38(2), pages 113-143, October.
    7. Littlechild, Stephen C. & Ponzano, Eduardo A., 2008. "Transmission expansion in Argentina 5: The regional electricity forum of Buenos Aires province," Energy Economics, Elsevier, vol. 30(4), pages 1491-1526, July.
    8. Stephen Littlechild, 2012. "Merchant and regulated transmission: theory, evidence and policy," Journal of Regulatory Economics, Springer, vol. 42(3), pages 308-335, December.
    9. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 1: The origins of policy," Energy Economics, Elsevier, vol. 30(4), pages 1367-1384, July.
    10. Chisari, Omar O. & Romero, Carlos A., 2008. "Investment decisions in electricity transmission in Argentina: The role of earmarked funds and gas pipeline expansions," Energy Economics, Elsevier, vol. 30(4), pages 1321-1333, July.
    11. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 4: A review of performance," Energy Economics, Elsevier, vol. 30(4), pages 1462-1490, July.
    12. Brunekreeft, Gert, 2004. "Market-based investment in electricity transmission networks: controllable flow," Utilities Policy, Elsevier, vol. 12(4), pages 269-281, December.
    13. Dietrich, Kristin & Leuthold, Florian & Weigt, Hannes, 2009. "Will the Market Get it Right? The Placing of New Power Plants in Germany," MPRA Paper 65653, University Library of Munich, Germany.
    14. Makoto TANAKA, 2005. "Optimal Transmission Capacity under Nodal Pricing and Incentive Regulation for Transco," Discussion papers 05021, Research Institute of Economy, Trade and Industry (RIETI).
    15. Juan Rosellón, 2009. "Mechanisms for the Optimal Expansion of Electricity Transmission Networks," Chapters, in: Joanne Evans & Lester C. Hunt (ed.), International Handbook on the Economics of Energy, chapter 24, Edward Elgar Publishing.
    16. Ingo Vogelsang, 2006. "Electricity Transmission Pricing and Performance-based Regulation," The Energy Journal, International Association for Energy Economics, vol. 0(Number 4), pages 97-126.
    17. Vincent Rious & Yannick Perez & Philippe Dessante, 2008. "Is combination of nodal pricing and average participation tariff the best solution to coordinate the location of power plants with lumpy transmission investments?," Post-Print hal-00323878, HAL.
    18. Juan Rosellón, Ingo Vogelsang, and Hannes Weigt, 2012. "Long-run Cost Functions for Electricity Transmission," The Energy Journal, International Association for Energy Economics, vol. 0(Number 1).
    19. Dagobert Brito & Juan Rosellón, 2011. "Lumpy Investment in Regulated Natural Gas Pipelines: An Application of the Theory of the Second Best," Networks and Spatial Economics, Springer, vol. 11(3), pages 533-553, September.
    20. Ramteen Sioshansi & Paul Denholm & Thomas Jenkin, 2012. "Market and Policy Barriers to Deployment of Energy Storage," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).

    More about this item

    Keywords

    Argentina; electricity; transmission; regulation;
    All these keywords.

    JEL classification:

    • L33 - Industrial Organization - - Nonprofit Organizations and Public Enterprise - - - Comparison of Public and Private Enterprise and Nonprofit Institutions; Privatization; Contracting Out
    • L51 - Industrial Organization - - Regulation and Industrial Policy - - - Economics of Regulation
    • L94 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Electric Utilities
    • L98 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Government Policy

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cam:camdae:0465. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Jake Dyer (email available below). General contact details of provider: https://www.econ.cam.ac.uk/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.